IDOT contract 97833 bid tabulation
Collinsville, section 19-00095-01-PV. Let by Illinois DOT on September 19, 2025, Madison, District 08. 2 bids received; low bid $2,218,364 by Keller Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 19 SEP 2025
- Pay items
- 92
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Keller Construction, Inc. | $2,218,364 | Low |
| 2 | Stutz Excavating, Inc. | $2,235,097 | +1.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Keller Construction, Inc. | 2. Stutz Excavating, Inc. |
|---|---|---|---|---|---|
| 1 | Seg con block wall L1 (XX009713) | LS | 1 | $151,569 | $190,500 |
| 2 | Seg con block wall L2 (XX009714) | LS | 1 | $100,075 | $119,000 |
| 3 | Landscaping gravel (X0323117) | SY | 133 | $63.50 | $38.05 |
| 4 | Retaining wall remov (X5220102) | LF | 63 | $34.12 | $40.00 |
| 5 | Remov EX flar end sec (X5427602) | EACH | 2 | $598.09 | $510.00 |
| 6 | Inlets SPL N1 (X6024242) | EACH | 6 | $6,030.00 | $4,910.00 |
| 7 | Inlets SPL N2 (X6024244) | EACH | 5 | $6,665.00 | $4,910.00 |
| 8 | Inlets SPL N3 (X6024246) | EACH | 1 | $6,200.00 | $4,910.00 |
| 9 | Sanitary manhole adj (X6026050) | EACH | 7 | $1,500.00 | $525.00 |
| 10 | San man reconst (X6026051) | EACH | 1 | $4,150.00 | $2,035.00 |
| 11 | CH LK fence 4 att STR (X6640525) | LF | 460 | $56.75 | $54.25 |
| 12 | Traf cont & prot SPL (X7010216) | LS | 1 | $18,850 | $24,500 |
| 13 | SS 1 wat MN 12 (Z0056648) | LF | 159 | $100.00 | $102.30 |
| 14 | SS 1 wat MN 15 (Z0056650) | LF | 88 | $108.00 | $109.15 |
| 15 | SS 1 wat MN 24 (Z0056654) | LF | 28 | $251.90 | $241.00 |
| 16 | Trainees (Z0076600) | HR | 1,000 | $0.80 | $0.80 |
| 17 | Trainees TPG (Z0076604) | HR | 1,000 | $15.00 | $15.00 |
| 18 | Earth excavation (20200100) | CY | 2,179 | $50.75 | $47.70 |
| 19 | Furnished excavation (20400800) | CY | 824 | $0.01 | $1.00 |
| 20 | Trench backfill (20800150) | CY | 732 | $51.45 | $47.70 |
| 21 | Seeding CL 2A (25000210) | ACRE | 0.75 | $10,080 | $4,200.00 |
| 22 | Nitrogen fert nutr (25000400) | LB | 68 | $18.90 | $5.00 |
| 23 | Phosphorus fert nutr (25000500) | LB | 68 | $18.90 | $5.00 |
| 24 | Potassium fert nutr (25000600) | LB | 68 | $18.90 | $5.00 |
| 25 | Mulch method 2 (25100115) | ACRE | 0.25 | $25,490 | $4,280.00 |
| 26 | Erosion contr blanket (25100630) | SY | 1,770 | $3.20 | $2.35 |
| 27 | Inlet & pipe protect (28000500) | EACH | 35 | $260.00 | $185.00 |
| 28 | Stone riprap CL A3 (28100105) | SY | 81 | $86.10 | $75.00 |
| 29 | Filter fabric (28200200) | SY | 81 | $6.65 | $3.75 |
| 30 | Agg base cse A 4 (35100300) | SY | 3,238 | $15.45 | $18.15 |
| 31 | Agg base cse A 6 (35100500) | SY | 136 | $24.45 | $19.50 |
| 32 | Agg base cse A 12 (35101100) | SY | 4,586 | $26.80 | $22.25 |
| 33 | Agg surf cse A 6 (40200500) | SY | 363 | $16.10 | $15.00 |
| 34 | Aggregate-temp access (40201000) | TON | 97 | $100.00 | $61.20 |
| 35 | Bit matls PR CT (40600275) | LB | 9,713 | $1.00 | $2.20 |
| 36 | Bit matls tack CT (40600290) | LB | 1,943 | $0.75 | $5.25 |
| 37 | Long joint sealant (40600370) | LF | 1,285 | $8.00 | $13.15 |
| 38 | HMA BC IL-19.0 N70 (40603085) | TON | 1,451 | $152.00 | $156.90 |
| 39 | HMA SC IL-9.5 D N70 (40604062) | TON | 484 | $164.00 | $168.75 |
| 40 | Incidental HMA surf (40800050) | TON | 15 | $450.00 | $260.00 |
| 41 | PCC PVT 8 (42000300) | SY | 136 | $277.50 | $145.00 |
| 42 | PCC driveway pavt 6 (42300200) | SY | 289 | $103.30 | $110.40 |
| 43 | PC conc sidewalk 4 (42400100) | SF | 17,119 | $8.00 | $7.95 |
| 44 | Detectable warnings (42400800) | SF | 276 | $61.15 | $62.95 |
| 45 | Pavement rem (44000100) | SY | 4,105 | $11.50 | $10.00 |
| 46 | Drive pavement rem (44000200) | SY | 363 | $22.00 | $30.00 |
| 47 | Gutter rem (44000400) | LF | 1,852 | $6.20 | $6.65 |
| 48 | Comb curb gutter rem (44000500) | LF | 155 | $13.55 | $6.65 |
| 49 | Sidewalk rem (44000600) | SF | 85 | $19.00 | $14.75 |
| 50 | Paved ditch removal (44004000) | LF | 341 | $14.50 | $12.00 |
| 51 | Pipe culvert remov (50105220) | LF | 227 | $11.14 | $11.05 |
| 52 | Storm sew CL A 1 12 (550A0050) | LF | 275 | $100.10 | $97.85 |
| 53 | Storm sew CL A 1 15 (550A0070) | LF | 69 | $110.40 | $103.45 |
| 54 | Storm sew CL A 1 18 (550A0090) | LF | 39 | $108.00 | $145.75 |
| 55 | Storm sew CL A 1 24 (550A0120) | LF | 122 | $127.55 | $158.80 |
| 56 | Storm sew CL A 2 30 (550A0430) | LF | 600 | $181.25 | $186.35 |
| 57 | Storm sew CL A 2 36 (550A0450) | LF | 530 | $218.35 | $189.45 |
| 58 | Storm sewer rem 12 (55100500) | LF | 35 | $21.80 | $57.20 |
| 59 | Storm sewer rem 15 (55100700) | LF | 153 | $19.95 | $48.45 |
| 60 | Storm sewer rem 24 (55101200) | LF | 730 | $20.90 | $47.05 |
| 61 | Storm sewer rem 36 (55101600) | LF | 479 | $28.70 | $64.25 |
| 62 | Water valves adjust (56109210) | EACH | 9 | $500.00 | $1,135.00 |
| 63 | Fire hydnts relocated (56400400) | EACH | 2 | $15,350 | $4,130.00 |
| 64 | Dom met VLTS adj (56500300) | EACH | 6 | $1,300.00 | $1,670.00 |
| 65 | Man TA 4 dia T1F CL (60218400) | EACH | 2 | $6,150.00 | $4,945.00 |
| 66 | Man TA 4 dia T3F&G (60218500) | EACH | 1 | $5,315.00 | $4,945.00 |
| 67 | Man TA 4 dia T15F&L (60219500) | EACH | 1 | $5,315.00 | $4,945.00 |
| 68 | Man TA 5 dia T3F&G (60221200) | EACH | 8 | $7,550.00 | $8,175.00 |
| 69 | Man TA 5 dia T23F&G (60222230) | EACH | 1 | $7,550.00 | $8,545.00 |
| 70 | Inlets TA T3F&G (60235700) | EACH | 4 | $4,820.00 | $4,900.00 |
| 71 | Inlets TA T15F&L (60237000) | EACH | 6 | $4,920.00 | $4,900.00 |
| 72 | Inlets TB T1F CL (60240215) | EACH | 1 | $5,970.00 | $2,330.00 |
| 73 | Inlets TB T3F&G (60240220) | EACH | 1 | $5,970.00 | $2,330.00 |
| 74 | Inlets TB T8G (60240301) | EACH | 1 | $5,850.00 | $2,330.00 |
| 75 | Man adjust (60255500) | EACH | 2 | $1,595.00 | $486.50 |
| 76 | Remov manholes (60500040) | EACH | 2 | $600.00 | $1,995.00 |
| 77 | Remov inlets (60500060) | EACH | 9 | $600.00 | $1,700.00 |
| 78 | Comb CC&G TB6.18 (60604400) | LF | 2,797 | $41.10 | $44.20 |
| 79 | Mobilization (67100100) | LS | 1 | $97,750 | $80,000 |
| 80 | Short term pavt mking (70300100) | LF | 702 | $1.25 | $2.05 |
| 81 | SHRT TRM pavt MK rem (70300150) | SF | 1,615 | $2.50 | $2.60 |
| 82 | Temp PVT MK L6 T4 tape (70307130) | LF | 2,571 | $1.85 | $2.05 |
| 83 | Temp PVT MK L24 T4 tape (70307210) | LF | 59 | $13.65 | $15.25 |
| 84 | Sign panel T1 (72000100) | SF | 54 | $34.00 | $38.00 |
| 85 | Remov sin pan assy TA (72400100) | EACH | 7 | $205.00 | $132.65 |
| 86 | Reloc sin pan assy TA (72400500) | EACH | 5 | $365.00 | $90.00 |
| 87 | Teles STL sin support (72800100) | LF | 195 | $16.50 | $18.45 |
| 88 | THPL PVT MK line 6 (78000400) | LF | 2,571 | $1.85 | $2.05 |
| 89 | THPL PVT MK line 12 (78000600) | LF | 314 | $10.00 | $11.20 |
| 90 | THPL PVT MK line 24 (78000650) | LF | 46 | $20.50 | $22.95 |
| 91 | Paint PVT MK line 12 (78001150) | LF | 75 | $10.00 | $11.20 |
| 92 | Paint PVT MK line 24 (78001180) | LF | 13 | $20.50 | $22.95 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of September 19, 2025. Compiled by Mirage Metrics.