IDOT contract 97862 bid tabulation
Godfrey, section 19-00001-05-PV. Let by Illinois DOT on April 25, 2025, Madison, District 08. 2 bids received; low bid $1,917,545 by Keller Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 77
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Keller Construction, Inc. | $1,917,545 | Low |
| 2 | Stutz Excavating, Inc. | $2,134,685 | +11% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Keller Construction, Inc. | 2. Stutz Excavating, Inc. |
|---|---|---|---|---|---|
| 1 | Relocate EX mailbox (X0327301) | EACH | 4 | $655.00 | $230.00 |
| 2 | R R FL beacon A comp (X1400326) | EACH | 2 | $10,800 | $11,880 |
| 3 | Clearing special (X2010505) | LS | 1 | $12,575 | $13,280 |
| 4 | Seeding CL 2 mod (X2501010) | ACRE | 0.70 | $4,445.00 | $12,000 |
| 5 | Storm sew connection (X5510010) | EACH | 1 | $1,685.00 | $1,945.00 |
| 6 | Single end section (X6300225) | EACH | 4 | $52.00 | $60.00 |
| 7 | Fence (special) (X6640102) | LF | 200 | $53.25 | $130.00 |
| 8 | Fence removal special (X6640106) | LF | 880 | $6.80 | $5.00 |
| 9 | Traf cont & prot SPL (X7010216) | LS | 1 | $20,000 | $18,920 |
| 10 | Relocate sign SPL (X7240502) | EACH | 2 | $1,400.00 | $1,540.00 |
| 11 | Trainees (Z0076600) | HR | 500 | $0.80 | $0.80 |
| 12 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 |
| 13 | Temporary fence (20101000) | LF | 665 | $11.80 | $20.00 |
| 14 | Earth excavation (20200100) | CY | 3,155 | $18.70 | $36.70 |
| 15 | Rem & disp uns matl (20201200) | CY | 25 | $56.10 | $45.00 |
| 16 | Trench backfill (20800150) | CY | 208 | $46.50 | $56.00 |
| 17 | Nitrogen fert nutr (25000400) | LB | 61 | $7.05 | $5.00 |
| 18 | Phosphorus fert nutr (25000500) | LB | 61 | $7.05 | $5.00 |
| 19 | Potassium fert nutr (25000600) | LB | 61 | $7.05 | $5.00 |
| 20 | Agr ground limestone (25000700) | TON | 1.40 | $1,415.00 | $550.00 |
| 21 | Mulch method 2 (25100115) | ACRE | 0.30 | $9,220.00 | $15,000 |
| 22 | Erosion contr blanket (25100630) | SY | 1,803 | $2.15 | $5.10 |
| 23 | Turf reinf mat (25100900) | SY | 239 | $11.00 | $20.00 |
| 24 | Temp eros contr seed (28000250) | LB | 280 | $8.00 | $5.00 |
| 25 | Temp ditch checks (28000305) | LF | 42 | $24.00 | $20.00 |
| 26 | Perimeter eros bar (28000400) | LF | 1,503 | $3.00 | $5.10 |
| 27 | Inlet & pipe protect (28000500) | EACH | 12 | $395.00 | $90.00 |
| 28 | Stone riprap CL A3 (28100205) | TON | 61 | $142.00 | $156.00 |
| 29 | Filter fabric (28200200) | SY | 129 | $4.25 | $4.70 |
| 30 | Process mod soil 12 (30200650) | SY | 3,696 | $5.70 | $9.30 |
| 31 | Portland cement (30201700) | TON | 134 | $305.55 | $288.00 |
| 32 | Sub gran mat A 4 (31100300) | SY | 4,963 | $12.15 | $14.20 |
| 33 | Sub gran mat B (31101000) | TON | 47 | $39.00 | $59.70 |
| 34 | Agg base cse B 8 (35102000) | SY | 257 | $12.90 | $17.25 |
| 35 | Agg surf cse A 6 (40200500) | SY | 527 | $18.20 | $16.85 |
| 36 | Aggregate-temp access (40201000) | TON | 140 | $64.65 | $55.00 |
| 37 | Bit matls PR CT (40600275) | LB | 518 | $0.01 | $2.15 |
| 38 | Bit matls tack CT (40600290) | LB | 104 | $2.56 | $8.00 |
| 39 | HMA BC IL-19.0 N70 (40603085) | TON | 33 | $135.87 | $215.00 |
| 40 | HMA SC IL-9.5 C N70 (40604052) | TON | 20 | $196.00 | $300.00 |
| 41 | Incidental HMA surf (40800050) | TON | 40 | $319.15 | $425.00 |
| 42 | PCC PVT 8 jointed (42000301) | SY | 2,958 | $83.65 | $97.00 |
| 43 | PCC driveway pavt 6 (42300200) | SY | 83 | $176.50 | $145.00 |
| 44 | PCC driveway pavt 8 (42300400) | SY | 30 | $195.50 | $155.00 |
| 45 | PC conc sidewalk 4 (42400100) | SF | 9,987 | $6.88 | $11.80 |
| 46 | Detectable warnings (42400800) | SF | 40 | $52.00 | $25.00 |
| 47 | Pavement rem (44000100) | SY | 337 | $11.70 | $7.60 |
| 48 | Drive pavement rem (44000200) | SY | 271 | $27.10 | $7.60 |
| 49 | Gutter rem (44000400) | LF | 106 | $13.65 | $8.25 |
| 50 | Comb curb gutter rem (44000500) | LF | 22 | $61.20 | $25.00 |
| 51 | Sidewalk rem (44000600) | SF | 41 | $17.65 | $10.00 |
| 52 | Aggregate SHLDS B 4 (48101498) | SY | 40 | $36.85 | $16.50 |
| 53 | Pipe culvert remov (50105220) | LF | 282 | $40.00 | $13.80 |
| 54 | Precast mod ret wall (52200700) | SF | 6,941 | $109.80 | $110.00 |
| 55 | P cul CL D 1 15 (542D0220) | LF | 48 | $87.80 | $73.55 |
| 56 | Storm sew CL A 1 12 (550A0050) | LF | 206 | $108.00 | $87.50 |
| 57 | Storm sew CL A 1 15 (550A0070) | LF | 684 | $71.25 | $80.60 |
| 58 | Storm sewer rem 15 (55100700) | LF | 122 | $28.10 | $19.60 |
| 59 | Pipe underdr T 1 4 (60108104) | LF | 683 | $29.45 | $30.00 |
| 60 | Inlets TA T8G (60236200) | EACH | 1 | $4,287.00 | $1,450.00 |
| 61 | Inlets TA T24F&G (60237470) | EACH | 4 | $4,215.00 | $1,505.00 |
| 62 | Inlets TB T24F&G (60240328) | EACH | 7 | $4,580.00 | $1,920.00 |
| 63 | Comb CC&G TY B-6.24 (60605000) | LF | 2,070 | $28.15 | $41.00 |
| 64 | SPBGR TY A 6FT posts (63000001) | LF | 463 | $69.61 | $41.00 |
| 65 | CH LK fence 4 (66400105) | LF | 545 | $50.42 | $80.00 |
| 66 | Engr field office B (67000500) | CAL MO | 6 | $3,300.00 | $1,800.00 |
| 67 | Mobilization (67100100) | LS | 1 | $115,000 | $151,000 |
| 68 | Sign panel T1 (72000100) | SF | 55 | $49.50 | $54.50 |
| 69 | Teles STL sin support (72800100) | LF | 41 | $27.75 | $30.50 |
| 70 | Metal post TY A (72900100) | LF | 125 | $25.00 | $27.50 |
| 71 | PT PVT MK LTRS & symb (78001100) | SF | 6 | $24.00 | $26.40 |
| 72 | Paint PVT MK line 4 (78001110) | LF | 255 | $3.90 | $4.30 |
| 73 | Paint PVT MK line 12 (78001150) | LF | 30 | $12.00 | $13.20 |
| 74 | Mod ureth PM line 4 (78009004) | LF | 2,228 | $1.30 | $1.45 |
| 75 | Mod ureth PM line 24 (78009024) | LF | 70 | $15.50 | $17.05 |
| 76 | Raised refl pavt MKR (78100100) | EACH | 13 | $230.00 | $218.00 |
| 77 | Grdrail ref type A (78200005) | EACH | 8 | $12.00 | $14.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.