IDOT contract 97839 bid tabulation
Edwardsville, section 21-00115-00-RS. Let by Illinois DOT on April 25, 2025, Madison, District 08. 2 bids received; low bid $615,086 by Charles E. Mahoney Co..
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 45
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Charles E. Mahoney Co. | $615,086 | Low |
| 2 | Stutz Excavating, Inc. | $624,695 | +2.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Charles E. Mahoney Co. | 2. Stutz Excavating, Inc. |
|---|---|---|---|---|---|
| 1 | Curb reflect removal (XX009711) | EACH | 16 | $10.00 | $18.00 |
| 2 | Stamped CLRDPCCPVT9J (X4200469) | SY | 138 | $324.00 | $495.00 |
| 3 | Man adjust SPL (X6025600) | EACH | 2 | $2,145.28 | $530.00 |
| 4 | Comb CC&G transition (X6060034) | LF | 31 | $76.00 | $146.00 |
| 5 | Comb CC&G TM SPL (X6061815) | LF | 191 | $76.00 | $135.00 |
| 6 | Traf cont & prot SPL (X7010216) | LS | 1 | $6,800.00 | $7,700.00 |
| 7 | Reloc EX signs (X7240500) | EACH | 18 | $65.00 | $73.00 |
| 8 | RRPM reflector removl (X7830050) | EACH | 3 | $15.00 | $31.00 |
| 9 | Construction layout (Z0013798) | LS | 1 | $13,000 | $15,600 |
| 10 | Dust control watering (Z0019600) | UNIT | 50 | $200.00 | $210.00 |
| 11 | Paint curb (Z0036200) | LF | 65 | $7.10 | $8.00 |
| 12 | Rem & disp uns matl (20201200) | CY | 40 | $90.00 | $90.00 |
| 13 | Sodding (25200100) | SY | 150 | $212.00 | $75.00 |
| 14 | Supple watering (25200200) | UNIT | 25 | $274.00 | $235.00 |
| 15 | Sub gran mat B (31101000) | TON | 82 | $52.00 | $55.00 |
| 16 | Bit matls tack CT (40600290) | LB | 5,036 | $2.45 | $3.25 |
| 17 | Mix CR JTS flangewys (40600400) | TON | 4 | $1,006.94 | $460.00 |
| 18 | Temporary ramp (40600990) | SY | 150 | $18.91 | $17.00 |
| 19 | HMA SC IL-9.5 C N70 (40604052) | TON | 1,254 | $164.36 | $162.00 |
| 20 | Incidental HMA surf (40800050) | TON | 2 | $533.63 | $415.00 |
| 21 | PCC driveway pavt 6 (42300200) | SY | 12 | $94.00 | $155.00 |
| 22 | PC conc sidewalk 4 (42400100) | SF | 1,244 | $16.00 | $28.00 |
| 23 | Detectable warnings (42400800) | SF | 165 | $98.00 | $60.00 |
| 24 | Pavement rem (44000100) | SY | 260 | $64.00 | $46.00 |
| 25 | HMA surf rem 2 (44000157) | SY | 11,190 | $6.58 | $7.25 |
| 26 | Comb curb gutter rem (44000500) | LF | 313 | $23.00 | $34.00 |
| 27 | Sidewalk rem (44000600) | SF | 883 | $7.00 | $8.00 |
| 28 | CL D patch T3 14 (44201819) | SY | 38 | $498.31 | $310.00 |
| 29 | Water valves adjust (56109210) | EACH | 1 | $413.00 | $300.00 |
| 30 | Comb CC&G TB6.18 (60604400) | LF | 65 | $76.00 | $137.00 |
| 31 | Comb CC&G TY B-6.24 (60605000) | LF | 26 | $76.00 | $143.00 |
| 32 | Mobilization (67100100) | LS | 1 | $47,454 | $25,600 |
| 33 | Short term pavt mking (70300100) | LF | 500 | $1.97 | $2.00 |
| 34 | SHRT TRM pavt MK rem (70300150) | SF | 167 | $12.67 | $5.00 |
| 35 | Sign panel T1 (72000100) | SF | 84.10 | $32.15 | $36.00 |
| 36 | Remov sin pan assy TA (72400100) | EACH | 26 | $129.33 | $60.00 |
| 37 | Reloc sin pan assy TA (72400500) | EACH | 1 | $275.00 | $306.00 |
| 38 | Teles STL sin support (72800100) | LF | 441.50 | $19.00 | $21.50 |
| 39 | THPL PVT MK line 4 (78000200) | LF | 5,984 | $1.22 | $1.50 |
| 40 | THPL PVT MK line 6 (78000400) | LF | 420 | $3.56 | $4.30 |
| 41 | THPL PVT MK line 12 (78000600) | LF | 138 | $9.90 | $12.00 |
| 42 | THPL PVT MK line 24 (78000650) | LF | 151 | $10.74 | $13.00 |
| 43 | PT PVT MK LTRS & symb (78001100) | SF | 7.50 | $38.39 | $47.00 |
| 44 | Curb reflectors (78200020) | EACH | 24 | $7.07 | $9.00 |
| 45 | Raised ref PVT MK rem (78300200) | EACH | 2 | $20.00 | $75.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.