IDOT contract 97874 bid tabulation
Project Number: 2S5Z-990 / /, section 23-00008-00-PV. Let by Illinois DOT on September 19, 2025, Madison, District 08. 5 bids received; low bid $2,566,151 by RCS Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 19 SEP 2025
- Pay items
- 65
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | RCS Construction, Inc. | $2,566,151 | Low |
| 2 | Keller Construction, Inc. | $2,568,006 | 0.0% |
| 3 | Stutz Excavating, Inc. | $2,637,426 | +3.0% |
| 4 | Baxmeyer Construction, Inc. | $2,807,718 | +9.0% |
| 5 | Hank's Excavating & Landscaping, Inc. | $3,037,733 | +18% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. RCS Construction, Inc. | 2. Keller Construction, Inc. | 3. Stutz Excavating, Inc. | 4. Baxmeyer Construction, Inc. | 5. Hank's Excavating & Landscaping, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Rubber rail seals (XX009313) | TRK FT | 496 | $150.00 | $141.75 | $300.00 | $251.00 | $218.00 |
| 2 | Storm sew connection (X5510010) | EACH | 4 | $2,650.00 | $1,659.00 | $1,000.00 | $1,688.00 | $1,675.00 |
| 3 | Inlets SPL N1 (X6024242) | EACH | 4 | $4,300.00 | $3,588.00 | $6,810.00 | $3,300.00 | $4,600.00 |
| 4 | Inlets SPL N2 (X6024244) | EACH | 1 | $4,400.00 | $8,612.00 | $7,800.00 | $3,400.00 | $4,100.00 |
| 5 | Inlet adj new F&G SPL (X6024503) | EACH | 3 | $2,000.00 | $2,714.00 | $4,215.00 | $2,500.00 | $2,695.00 |
| 6 | Conc gutter SPL (X6062400) | LF | 102 | $46.50 | $58.47 | $58.00 | $137.00 | $95.00 |
| 7 | Traf cont & prot SPL (X7010216) | LS | 1 | $40,000 | $34,749 | $31,000 | $39,300 | $29,400 |
| 8 | Rem repl sign & SPPRT (X7240305) | EACH | 2 | $400.00 | $367.50 | $760.00 | $269.00 | $450.00 |
| 9 | RR prot liability ins (Z0048665) | LS | 1 | $10,000 | $31,525 | $4,500.00 | $16,600 | $3,000.00 |
| 10 | SS 1 wat MN 12 (Z0056648) | LF | 130 | $85.00 | $151.88 | $86.30 | $101.00 | $105.00 |
| 11 | Trainees (Z0076600) | HR | 1,000 | $0.80 | $0.80 | $0.80 | $0.80 | $0.80 |
| 12 | Trainees TPG (Z0076604) | HR | 1,000 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 13 | Earth excavation (20200100) | CY | 4,089 | $37.00 | $36.05 | $32.15 | $32.40 | $56.00 |
| 14 | Trench backfill (20800150) | CY | 286 | $60.00 | $64.57 | $51.00 | $40.00 | $50.00 |
| 15 | Grading & shap ditch (21400100) | LF | 363 | $30.00 | $21.00 | $15.60 | $14.00 | $25.00 |
| 16 | Seeding CL 2A (25000210) | ACRE | 2.50 | $7,000.00 | $2,310.00 | $5,325.00 | $3,215.00 | $4,500.00 |
| 17 | Nitrogen fert nutr (25000400) | LB | 225 | $1.00 | $2.00 | $5.00 | $6.00 | $2.30 |
| 18 | Phosphorus fert nutr (25000500) | LB | 225 | $1.00 | $2.00 | $5.00 | $6.00 | $2.30 |
| 19 | Potassium fert nutr (25000600) | LB | 225 | $1.00 | $2.00 | $5.00 | $6.00 | $2.30 |
| 20 | Mulch method 2 (25100115) | ACRE | 5 | $2,000.00 | $0.01 | $3,200.00 | $554.00 | $3,200.00 |
| 21 | Erosion contr blanket (25100630) | SY | 5,983 | $2.00 | $1.40 | $3.25 | $3.35 | $2.35 |
| 22 | Temp eros contr seed (28000250) | LB | 250 | $1.00 | $0.01 | $5.00 | $17.00 | $6.00 |
| 23 | Inlet & pipe protect (28000500) | EACH | 24 | $150.00 | $130.00 | $90.00 | $94.00 | $300.00 |
| 24 | Stone dump rip CL A4 (28100707) | SY | 60 | $80.00 | $61.00 | $83.00 | $78.00 | $129.00 |
| 25 | Filter fabric (28200200) | SY | 60 | $10.00 | $11.50 | $5.00 | $8.30 | $5.00 |
| 26 | Sub gran mat A 8 (31100700) | SY | 11,213 | $14.00 | $12.81 | $18.80 | $13.50 | $20.00 |
| 27 | Aggregate-temp access (40201000) | TON | 50 | $50.00 | $40.00 | $60.00 | $74.00 | $65.00 |
| 28 | Bit matls PR CT (40600275) | LB | 1,671 | $7.00 | $6.40 | $1.65 | $6.75 | $6.40 |
| 29 | Bit matls tack CT (40600290) | LB | 1,393 | $7.00 | $6.60 | $2.10 | $7.00 | $6.60 |
| 30 | HMA BC IL-9.5 N50 (40602978) | TON | 166 | $285.00 | $267.25 | $225.00 | $282.00 | $267.25 |
| 31 | HMA SC IL-9.5 C N50 (40604050) | TON | 108 | $385.50 | $361.40 | $265.00 | $381.00 | $361.40 |
| 32 | Welded wire reinf (42000060) | SY | 9,812 | $8.50 | $9.73 | $19.80 | $15.25 | $15.00 |
| 33 | PCC PVT 10 jointed (42000501) | SY | 9,812 | $90.00 | $96.11 | $90.00 | $101.00 | $116.00 |
| 34 | Protective coat (42001300) | SY | 11,406 | $1.50 | $0.01 | $1.30 | $0.01 | $1.20 |
| 35 | PCC driveway pavt 10 (42300600) | SY | 1,253 | $100.00 | $92.64 | $95.00 | $184.00 | $152.00 |
| 36 | Pavement rem (44000100) | SY | 12,464 | $6.50 | $8.07 | $8.60 | $9.30 | $13.35 |
| 37 | Drive pavement rem (44000200) | SY | 822 | $17.00 | $22.62 | $18.00 | $17.50 | $10.55 |
| 38 | Gutter rem (44000400) | LF | 104 | $8.50 | $6.58 | $8.30 | $9.50 | $15.00 |
| 39 | Aggregate SHLDS A 6 (48100500) | SY | 589 | $43.50 | $25.03 | $16.50 | $26.00 | $17.00 |
| 40 | HMA shoulders 6 (48203021) | SY | 2,272 | $85.00 | $79.86 | $79.15 | $84.25 | $80.00 |
| 41 | Pipe culvert remov (50105220) | LF | 320 | $11.00 | $16.56 | $22.60 | $25.50 | $17.00 |
| 42 | P cul CL A 1 12 (542A0217) | LF | 54 | $92.00 | $97.15 | $63.45 | $63.00 | $93.00 |
| 43 | P cul CL A 1 15 (542A0220) | LF | 278 | $115.00 | $76.37 | $71.40 | $76.00 | $103.55 |
| 44 | P cul CL A 1 eqrs 18 (542A5473) | LF | 132 | $133.00 | $120.56 | $110.00 | $109.00 | $130.15 |
| 45 | PRC flar end sec 12 (54213657) | EACH | 2 | $1,500.00 | $1,434.00 | $845.00 | $1,400.00 | $1,725.00 |
| 46 | PRC flar end sec 15 (54213660) | EACH | 9 | $1,680.00 | $1,640.00 | $1,060.00 | $1,578.00 | $1,935.00 |
| 47 | PRC FL end S EQ RS 18 (54214503) | EACH | 2 | $2,150.00 | $2,460.00 | $1,525.00 | $2,001.00 | $2,400.00 |
| 48 | Storm sew CL A 1 12 (550A0050) | LF | 73 | $125.00 | $101.20 | $67.60 | $67.50 | $77.00 |
| 49 | Storm sew CL A 1 15 (550A0070) | LF | 675 | $80.50 | $92.50 | $76.70 | $74.00 | $85.00 |
| 50 | Storm sew CL A 1 18 (550A0090) | LF | 228 | $110.50 | $52.00 | $85.30 | $86.50 | $95.00 |
| 51 | Man TA 4 dia T24F&G (60219540) | EACH | 2 | $6,000.00 | $3,865.00 | $2,130.00 | $4,301.00 | $4,100.00 |
| 52 | Inlets TA T8G (60236200) | EACH | 2 | $2,650.00 | $3,030.00 | $1,285.00 | $2,124.00 | $1,900.00 |
| 53 | Inlets TA T24F&G (60237470) | EACH | 1 | $2,900.00 | $3,115.00 | $1,330.00 | $2,284.00 | $2,000.00 |
| 54 | Inlets TB T3F&G (60240220) | EACH | 1 | $3,500.00 | $3,540.00 | $2,045.00 | $2,930.00 | $2,700.00 |
| 55 | Man adjust (60255500) | EACH | 4 | $720.00 | $513.00 | $750.00 | $680.00 | $700.00 |
| 56 | Inlets adjust (60260100) | EACH | 2 | $720.00 | $543.00 | $550.00 | $667.00 | $700.00 |
| 57 | Remov inlets (60500060) | EACH | 4 | $450.00 | $660.00 | $125.00 | $540.00 | $425.00 |
| 58 | Class SI conc outlet (60600095) | CY | 2 | $1,500.00 | $2,225.00 | $1,450.00 | $3,012.00 | $3,625.00 |
| 59 | Comb CC&G TY B-6.24 (60605000) | LF | 897 | $70.00 | $44.10 | $60.35 | $74.00 | $63.00 |
| 60 | Mobilization (67100100) | LS | 1 | $150,000 | $178,900 | $94,425 | $106,424 | $32,000 |
| 61 | Rem & rel sign panel asmbly TA (72400205) | EACH | 12 | $150.00 | $367.50 | $700.00 | $413.00 | $265.00 |
| 62 | Rem & rel sign panel asmbly TB (72400210) | EACH | 7 | $150.00 | $367.50 | $960.00 | $549.00 | $500.00 |
| 63 | Mod ureth PM LTR-sym (78009000) | SF | 448 | $22.50 | $21.00 | $22.00 | $22.25 | $21.00 |
| 64 | Mod ureth PM line 4 (78009004) | LF | 7,399 | $2.00 | $1.58 | $1.65 | $1.75 | $1.60 |
| 65 | Mod ureth PM line 24 (78009024) | LF | 294 | $22.50 | $21.00 | $22.00 | $22.25 | $21.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of September 19, 2025. Compiled by Mirage Metrics.