Hank's Excavating & Landscaping, Inc.: IDOT bid record
Hank's Excavating & Landscaping, Inc. submitted 40 bids on Illinois DOT contracts in the data, from 23 APR 2021 to 18 SEP 2026, and was the low bidder on 13 of them (33%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $16,461,162
- Latest bid
- 18 SEP 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 9 | 2 | 22% |
| 2022 | 5 | 3 | 60% |
| 2023 | 2 | 1 | 50% |
| 2024 | 7 | 2 | 29% |
| 2025 | 5 | 1 | 20% |
| 2026 | 12 | 4 | 33% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Trainees TPG | Z0076604 | HR | 23 | 23 (100%) | $15.00 | $15.00 |
| Trainees | Z0076600 | HR | 23 | 23 (100%) | $0.80 | $0.80 |
| Bit matls tack CT | 40600290 | LB | 26 | 13 (50%) | $2.35 | $0.01 |
| Nitrogen fert nutr | 25000400 | LB | 25 | 13 (52%) | $2.30 | $3.00 |
| Potassium fert nutr | 25000600 | LB | 25 | 13 (52%) | $2.30 | $3.00 |
| Phosphorus fert nutr | 25000500 | LB | 25 | 13 (52%) | $2.30 | $3.00 |
| Sidewalk rem | 44000600 | SF | 24 | 11 (46%) | $2.00 | $3.00 |
| THPL PVT MK line 4 | 78000200 | LF | 21 | 11 (52%) | $1.50 | $0.88 |
| Perimeter eros bar | 28000400 | LF | 18 | 11 (61%) | $3.00 | $3.50 |
| Bit matls PR CT | 40600275 | LB | 18 | 11 (61%) | $1.80 | $0.01 |
| Drive pavement rem | 44000200 | SY | 29 | 10 (34%) | $20.00 | $20.00 |
| Mulch method 2 | 25100115 | ACRE | 21 | 10 (48%) | $3,846.00 | $2,805.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| DMS Contracting, Inc. | 25 | 9 of 25 |
| Stutz Excavating, Inc. | 21 | 12 of 21 |
| Baxmeyer Construction, Inc. | 17 | 12 of 17 |
| Keller Construction, Inc. | 9 | 3 of 9 |
| Keeley & Sons, Inc. | 7 | 3 of 7 |
| RCS Construction, Inc. | 7 | 5 of 7 |
| Kinney Contractors, Inc. | 3 | 2 of 3 |
| The Kilian Corporation | 3 | 2 of 3 |
| G. M. Sipes Construction, Inc. | 2 | 1 of 2 |
| Mayer Landscaping, Inc. | 2 | 1 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 SEP 2026 | 76V43 | District 08 | Section DIST | 4 of 4 | $5,390,900 | +148% |
| 18 SEP 2026 | 97894 | District 08 | Belleville, section 22-00176-06-RS | 1 of 5 | $4,145,137 | Low, 14% under the second |
| 31 JUL 2026 | 97866 | District 08 | Columbia, section 21-00053-01-PV | 2 of 4 | $1,140,035 | +6.0% |
| 12 JUN 2026 | 97827 | District 08 | Project Number: K9Xl-969 / /, section 19-00276-07-PW | 1 of 3 | $649,527 | Low, 40% under the second |
| 12 JUN 2026 | 97899 | District 08 | East St. Louis, section 22-00235-01-RS | 1 of 1 | $1,579,164 | Low |
| 27 FEB 2026 | 76U78 | District 08 | Section (X-3)PP | 4 of 4 | $1,215,673 | +35% |
| 27 FEB 2026 | 97872 | District 08 | Project Number: E181-096 / /, section 24-00301-26-PW | 3 of 3 | $5,558,097 | +19% |
| 27 FEB 2026 | 97882 | District 08 | Granite City, section 21-00189-01-RS | 2 of 2 | $2,865,779 | +3.0% |
| 27 FEB 2026 | 97886 | District 08 | Fairview Heights, section 24-00035-01-RS | 2 of 2 | $1,276,699 | +6.0% |
| 16 JAN 2026 | 97876 | District 08 | Collinsville, section 22-00098-02-SP | 1 of 3 | $790,083 | Low, 8.0% under the second |
| 16 JAN 2026 | 97881 | District 08 | East Alton, section 22-00053-00-RS | 2 of 3 | $1,276,267 | +2.0% |
| 16 JAN 2026 | 97883 | District 08 | Edwardsville, section 23-00111-05-BT | 2 of 3 | $1,148,371 | +1.0% |
| 19 SEP 2025 | 97869 | District 08 | City Of Madison, section 19-00064-00-RS | 2 of 4 | $3,833,317 | +1.0% |
| 19 SEP 2025 | 97874 | District 08 | Project Number: 2S5Z-990 / /, section 23-00008-00-PV | 5 of 5 | $3,037,733 | +18% |
| 01 AUG 2025 | 97860 | District 08 | Sauget, section 16-00015-01-PV | 1 of 2 | $607,366 | Low, 53% under the second |
| 17 JAN 2025 | 76M34 | District 08 | Section (122-1,2)PP | 2 of 4 | $336,325 | +23% |
| 17 JAN 2025 | 97853 | District 08 | Edwardsville, section 21-00111-02-BT | 4 of 4 | $720,255 | +35% |
| 08 NOV 2024 | 97372 | District 08 | Project Number: Smtq-413 / /, section 95-00301-03-PV | 3 of 4 | $14,497,404 | +6.0% |
| 20 SEP 2024 | 76T73 | District 08 | Section (51,117)TR | 2 of 5 | $112,407 | +15% |
| 14 JUN 2024 | 76T47 | District 08 | Section 82-1-I | 1 of 4 | $124,250 | Low, 44% under the second |
| 26 APR 2024 | 76T51 | District 08 | Section 82DM | 3 of 6 | $314,500 | +25% |
| 08 MAR 2024 | 97809 | District 08 | Columbia, section 18-00055-00-BR | 4 of 4 | $834,936 | +29% |
| 19 JAN 2024 | 97803 | District 08 | Fairview Heights, section 17-00042-02-RS | 2 of 4 | $551,620 | +3.0% |
| 19 JAN 2024 | 97824 | District 08 | Granite City, section 19-00197-02-RS | 1 of 3 | $938,631 | Low, 4.0% under the second |
| 04 AUG 2023 | 97810 | District 08 | Columbia, section 16-00053-00-PV | 3 of 3 | $1,360,593 | +12% |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.