IDOT contract 97827 bid tabulation
Project Number: K9Xl-969 / /, section 19-00276-07-PW. Let by Illinois DOT on June 12, 2026, St. Clair, District 08. 3 bids received; low bid $649,527 by Hank's Excavating & Landscaping, Inc..
- Owner
- Illinois DOT
- Letting
- 12 JUN 2026
- Pay items
- 92
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Hank's Excavating & Landscaping, Inc. | $649,527 | Low |
| 2 | Baxmeyer Construction, Inc. | $910,220 | +40% |
| 3 | DMS Contracting, Inc. | $1,101,402 | +70% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Hank's Excavating & Landscaping, Inc. | 2. Baxmeyer Construction, Inc. | 3. DMS Contracting, Inc. |
|---|---|---|---|---|---|---|
| 1 | Inlet adj new lid SPL (X1200034) | EACH | 1 | $2,360.00 | $1,894.24 | $1,958.66 |
| 2 | Rem ped push-button (X1400031) | EACH | 2 | $2,940.00 | $3,025.53 | $3,664.78 |
| 3 | Potholing (X1700066) | EACH | 25 | $640.00 | $1,399.48 | $841.67 |
| 4 | CL B patch T4 8 SPL (X4420668) | SY | 40 | $295.00 | $342.76 | $610.00 |
| 5 | CL B patch T2 8 SPL (X4420669) | SY | 52 | $280.00 | $391.01 | $620.00 |
| 6 | Traf cont & prot SPL (X7010216) | LS | 1 | $7,425.00 | $6,510.29 | $72,172 |
| 7 | Handhole to BE adjust (X8140115) | EACH | 1 | $9,975.00 | $10,265 | $12,434 |
| 8 | Ped pushbutton post (X8760201) | EACH | 2 | $6,090.00 | $6,267.17 | $7,591.34 |
| 9 | Rel EX TS cont/cab CM (X8950103) | EACH | 1 | $36,750 | $37,819 | $45,810 |
| 10 | Drill-grout #6 T-bar (Z0018911) | EACH | 156 | $21.60 | $36.11 | $75.62 |
| 11 | Storm sew WM req 12 (Z0056608) | LF | 15 | $195.00 | $151.98 | $371.83 |
| 12 | Temporary fence (20101000) | LF | 75 | $10.00 | $20.11 | $67.01 |
| 13 | Earth excavation (20200100) | CY | 450 | $37.00 | $121.65 | $92.14 |
| 14 | Nitrogen fert nutr (25000400) | LB | 10 | $80.00 | $50.81 | $63.87 |
| 15 | Phosphorus fert nutr (25000500) | LB | 10 | $80.00 | $50.81 | $63.87 |
| 16 | Potassium fert nutr (25000600) | LB | 10 | $83.00 | $50.81 | $63.87 |
| 17 | Temp eros contr seed (28000250) | LB | 10 | $17.50 | $32.12 | $59.66 |
| 18 | Inlet & pipe protect (28000500) | EACH | 6 | $80.00 | $209.33 | $321.34 |
| 19 | Sub gran mat A (31100100) | TON | 695 | $41.50 | $42.69 | $60.15 |
| 20 | Agg surf course TY B (40200800) | TON | 4 | $100.00 | $168.71 | $665.21 |
| 21 | Welded wire reinf (42000060) | SY | 527 | $16.00 | $24.62 | $44.29 |
| 22 | PCC PVT 8 jointed (42000301) | SY | 487 | $97.00 | $140.79 | $203.66 |
| 23 | Protective coat (42001300) | SY | 751 | $1.00 | $3.06 | $1.70 |
| 24 | PCC driveway pavt 6 (42300200) | SY | 15 | $260.00 | $560.52 | $405.53 |
| 25 | PC conc sidewalk 4 (42400100) | SF | 2,349 | $13.00 | $19.92 | $12.82 |
| 26 | Detectable warnings (42400800) | SF | 30 | $48.00 | $58.88 | $151.93 |
| 27 | Pavement rem (44000100) | SY | 33 | $53.00 | $155.30 | $128.20 |
| 28 | Drive pavement rem (44000200) | SY | 23 | $39.00 | $96.56 | $116.54 |
| 29 | Comb curb gutter rem (44000500) | LF | 483 | $17.50 | $26.38 | $20.53 |
| 30 | Sidewalk rem (44000600) | SF | 1,882 | $4.50 | $3.86 | $10.87 |
| 31 | Dowel bars 1 1/4 (44201298) | EACH | 60 | $31.00 | $60.83 | $100.86 |
| 32 | Saw cuts (44213200) | LF | 419 | $12.00 | $21.36 | $15.91 |
| 33 | Tie bars 1 1/4 (44213208) | EACH | 60 | $25.00 | $60.00 | $99.76 |
| 34 | Storm sew CL A 1 12 (550A0050) | LF | 75 | $123.00 | $118.45 | $175.15 |
| 35 | Storm sewer rem 12 (55100500) | LF | 10 | $49.00 | $79.63 | $268.03 |
| 36 | Water valves adjust (56109210) | EACH | 3 | $65.00 | $640.00 | $1,249.39 |
| 37 | Man TA 4 dia T1F CL (60218400) | EACH | 1 | $11,500 | $4,477.77 | $6,738.41 |
| 38 | Inlets TA T24F&G (60237470) | EACH | 2 | $2,300.00 | $2,847.36 | $3,688.56 |
| 39 | Inlets TB T24F&G (60240328) | EACH | 2 | $4,500.00 | $3,221.54 | $4,151.90 |
| 40 | Man adjust (60255500) | EACH | 2 | $900.00 | $1,385.42 | $1,408.95 |
| 41 | Remov inlets (60500060) | EACH | 1 | $750.00 | $806.42 | $1,340.18 |
| 42 | Rem inlet- main flow (60500090) | EACH | 2 | $1,000.00 | $1,204.58 | $1,340.17 |
| 43 | Comb CC&G TY B-6.24 (60605000) | LF | 459 | $64.00 | $244.42 | $68.13 |
| 44 | Mobilization (67100100) | LS | 1 | $48,000 | $77,083 | $155,561 |
| 45 | Short term pavt mking (70300100) | LF | 103 | $6.50 | $27.27 | $2.29 |
| 46 | SHRT TRM pavt MK rem (70300150) | SF | 34 | $8.00 | $20.17 | $0.65 |
| 47 | Temp PVT MK LTR & sym paint (70300211) | SF | 62 | $4.20 | $4.32 | $5.24 |
| 48 | Temp PVT MK line 4 - paint (70300221) | LF | 1,658 | $2.90 | $2.97 | $3.60 |
| 49 | Temp PVT MK line 6 - paint (70300241) | LF | 320 | $3.15 | $3.24 | $3.93 |
| 50 | Temp PVT MK line 12 - paint (70300261) | LF | 133 | $4.20 | $4.32 | $5.24 |
| 51 | Sign panel T1 (72000100) | SF | 7 | $59.00 | $144.01 | $132.24 |
| 52 | Remov sign panel T1 (72400310) | SF | 1.50 | $57.75 | $59.43 | $71.99 |
| 53 | Reloc sin pan assy TA (72400500) | EACH | 1 | $300.00 | $800.58 | $1,874.09 |
| 54 | Teles STL sin support (72800100) | LF | 30 | $28.00 | $42.67 | $52.55 |
| 55 | PT PVT MK LTRS & symb (78001100) | SF | 62 | $7.35 | $7.56 | $9.16 |
| 56 | Paint PVT MK line 4 (78001110) | LF | 1,658 | $4.20 | $4.32 | $5.24 |
| 57 | Paint PVT MK line 6 (78001130) | LF | 320 | $6.30 | $6.48 | $7.85 |
| 58 | Paint PVT MK line 12 (78001150) | LF | 133 | $7.35 | $7.56 | $9.16 |
| 59 | PVT MKG rem WTR blast (78300202) | SF | 1,416 | $4.75 | $4.86 | $5.89 |
| 60 | Locate undergr cable (80300100) | LF | 1,490 | $10.50 | $10.81 | $13.09 |
| 61 | Undrgrd C galvs 2 1/2 (81028210) | LF | 75 | $52.50 | $54.03 | $65.44 |
| 62 | Undrgrd C galvs 3 (81028220) | LF | 85 | $60.90 | $62.67 | $75.91 |
| 63 | Undrgrd C PVC 1 (81028320) | LF | 35 | $47.25 | $48.62 | $58.90 |
| 64 | Undrgrd C PVC 1 1/2 (81028340) | LF | 197 | $26.25 | $27.01 | $32.72 |
| 65 | Undrgrd C PVC 2 1/2 (81028360) | LF | 3 | $157.50 | $162.08 | $196.33 |
| 66 | Undrgrd C PVC 4 (81028390) | LF | 8 | $210.00 | $216.11 | $261.77 |
| 67 | Handhole (81400100) | EACH | 1 | $5,040.00 | $5,186.62 | $6,282.48 |
| 68 | DBL handhole (81400300) | EACH | 1 | $15,750 | $16,208 | $19,633 |
| 69 | Elcbl C signal 14 2C (87301215) | LF | 797 | $5.25 | $5.40 | $6.54 |
| 70 | Elcbl C signal 14 3C (87301225) | LF | 856 | $5.75 | $5.94 | $7.20 |
| 71 | Elcbl C signal 14 5C (87301245) | LF | 1,175 | $6.55 | $6.75 | $8.18 |
| 72 | Elcbl C signal 14 7C (87301255) | LF | 244 | $10.50 | $10.81 | $13.09 |
| 73 | Elcbl C lead 14 1PR (87301305) | LF | 2,047 | $5.00 | $5.13 | $6.22 |
| 74 | Elcbl C serv 6 2C (87301805) | LF | 58 | $6.10 | $6.27 | $7.59 |
| 75 | Elcbl C egrdc 6 1C (87301900) | LF | 623 | $4.20 | $4.32 | $5.24 |
| 76 | TS post A 16 (87502700) | EACH | 1 | $3,990.00 | $4,106.08 | $4,973.63 |
| 77 | Conc FDN TY A (87800100) | LF | 8 | $787.50 | $810.41 | $981.64 |
| 78 | Conc FDN TY D (87800200) | LF | 3 | $4,725.00 | $4,862.46 | $5,889.83 |
| 79 | Drill EX handhole (87900200) | EACH | 4 | $0.01 | $0.01 | $0.01 |
| 80 | SH P LED 1F 3S BM (88040070) | EACH | 1 | $2,940.00 | $3,025.53 | $3,664.78 |
| 81 | SH P LED 1F 5S BM (88040150) | EACH | 1 | $3,990.00 | $4,106.08 | $4,973.63 |
| 82 | Ind L det amp cdccodd (88500520) | EACH | 3 | $787.50 | $810.41 | $981.64 |
| 83 | Det loop T1 (88600100) | LF | 397 | $39.90 | $67.24 | $49.74 |
| 84 | Ped push-button (88800100) | EACH | 4 | $892.50 | $918.47 | $1,112.52 |
| 85 | Reloc EX sig head (89500100) | EACH | 1 | $1,758.75 | $1,809.92 | $2,192.32 |
| 86 | Reloc EX ped sig head (89500200) | EACH | 2 | $1,575.00 | $1,620.82 | $1,963.28 |
| 87 | Mod EX contr (89502200) | EACH | 1 | $5,775.00 | $5,943.01 | $7,198.68 |
| 88 | Rem elcbl FR con (89502300) | LF | 4,525 | $5.25 | $5.40 | $6.54 |
| 89 | Remov EX TS equip (89502375) | EACH | 1 | $7,875.00 | $8,104.10 | $9,816.38 |
| 90 | Remov EX handhole (89502380) | EACH | 1 | $2,625.00 | $2,701.37 | $3,272.13 |
| 91 | Remov EX DBL handhole (89502382) | EACH | 1 | $26,250 | $27,014 | $32,721 |
| 92 | Remov EX conc FDN (89502385) | EACH | 2 | $787.50 | $810.41 | $981.64 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 12, 2026. Compiled by Mirage Metrics.