IDOT contract 97886 bid tabulation
Fairview Heights, section 24-00035-01-RS. Let by Illinois DOT on February 27, 2026, St. Clair, District 08. 2 bids received; low bid $1,199,255 by Keeley & Sons, Inc..
- Owner
- Illinois DOT
- Letting
- 27 FEB 2026
- Pay items
- 32
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Keeley & Sons, Inc. | $1,199,255 | Low |
| 2 | Hank's Excavating & Landscaping, Inc. | $1,276,699 | +6.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Keeley & Sons, Inc. | 2. Hank's Excavating & Landscaping, Inc. |
|---|---|---|---|---|---|
| 1 | Bit matl PR CT (LR403200) | TON | 19 | $739.50 | $761.25 |
| 2 | Seal coat agg (LR403600) | TON | 133 | $157.08 | $161.70 |
| 3 | PC conc sidewalk 4 SP (X4240420) | SF | 1,690 | $21.85 | $45.00 |
| 4 | CL B patch T4 8 SPL (X4420668) | SY | 422 | $273.85 | $155.00 |
| 5 | CL B patch T2 8 SPL (X4420669) | SY | 478 | $273.85 | $265.00 |
| 6 | CL B patch T1 8 SPL (X4420694) | SY | 206 | $273.85 | $632.00 |
| 7 | CL B patch T3 8 SPL (X4420695) | SY | 420 | $273.85 | $248.00 |
| 8 | Comb CC&G TB6.24 SPL (X6060052) | LF | 631 | $67.85 | $110.00 |
| 9 | Traf cont & prot SPL (X7010216) | LS | 1 | $31,315 | $30,000 |
| 10 | Det loop repl (X8860105) | LF | 1,722 | $14.95 | $15.50 |
| 11 | Construction layout (Z0013798) | LS | 1 | $31,600 | $7,000.00 |
| 12 | Trainees (Z0076600) | HR | 500 | $0.80 | $0.80 |
| 13 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 |
| 14 | Bit matls tack CT (40600290) | LB | 8,178 | $0.77 | $0.80 |
| 15 | PCC surf rem butt JT (40600985) | SY | 514 | $35.70 | $36.75 |
| 16 | HMA BC IL-9.5FG N70 (40602970) | TON | 761 | $171.36 | $176.40 |
| 17 | HMA SC IL-9.5FG D N70 (40604012) | TON | 849 | $187.68 | $193.20 |
| 18 | Detectable warnings (42400800) | SF | 253 | $87.80 | $67.00 |
| 19 | Comb curb gutter rem (44000500) | LF | 631 | $13.15 | $55.00 |
| 20 | Sidewalk rem (44000600) | SF | 1,565 | $3.95 | $3.50 |
| 21 | Welded wire reinf (44200050) | SY | 842 | $18.85 | $31.00 |
| 22 | Dowel bars 1 1/4 (44201298) | EACH | 1,179 | $34.15 | $33.00 |
| 23 | Saw cuts (44213200) | LF | 8,123 | $5.85 | $8.50 |
| 24 | Tie bars 3/4 (44213204) | EACH | 1,179 | $16.85 | $29.00 |
| 25 | Man adjust (60255500) | EACH | 8 | $687.90 | $330.00 |
| 26 | Inlets adjust (60260100) | EACH | 3 | $587.00 | $400.00 |
| 27 | VV adjust (60265700) | EACH | 5 | $557.10 | $140.00 |
| 28 | Mobilization (67100100) | LS | 1 | $72,145 | $30,000 |
| 29 | THPL PVT MK LTR & sym (78000100) | SF | 86 | $19.89 | $20.50 |
| 30 | THPL PVT MK line 4 (78000200) | LF | 6,014 | $1.28 | $1.30 |
| 31 | THPL PVT MK line 12 (78000600) | LF | 336 | $8.93 | $9.25 |
| 32 | THPL PVT MK line 24 (78000650) | LF | 51 | $17.85 | $18.40 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of February 27, 2026. Compiled by Mirage Metrics.