IDOT contract 97872 bid tabulation
Project Number: E181-096 / /, section 24-00301-26-PW. Let by Illinois DOT on February 27, 2026, St. Clair, District 08. 3 bids received; low bid $4,689,431 by DMS Contracting, Inc..
- Owner
- Illinois DOT
- Letting
- 27 FEB 2026
- Pay items
- 154
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | DMS Contracting, Inc. | $4,689,431 | Low |
| 2 | Baxmeyer Construction, Inc. | $4,700,338 | 0.0% |
| 3 | Hank's Excavating & Landscaping, Inc. | $5,558,097 | +19% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. DMS Contracting, Inc. | 2. Baxmeyer Construction, Inc. | 3. Hank's Excavating & Landscaping, Inc. |
|---|---|---|---|---|---|---|
| 1 | EM veh P S LSC 20 3C (X0324085) | LF | 126 | $0.01 | $0.01 | $0.01 |
| 2 | Potholing (X1700066) | EACH | 50 | $665.50 | $750.00 | $815.00 |
| 3 | Temp pavt removal (X4400110) | SY | 846 | $15.25 | $4.50 | $17.00 |
| 4 | SHLDR rem SPL (X4404262) | SY | 846 | $11.75 | $11.65 | $12.00 |
| 5 | Pavt removal SPL (X4404400) | SY | 805 | $12.00 | $24.15 | $9.00 |
| 6 | CL B patch T1 9 SPL (X4420670) | SY | 5 | $2,110.00 | $456.00 | $700.00 |
| 7 | Rem C box cul end sec (X5010520) | EACH | 8 | $1,925.00 | $2,000.00 | $1,650.00 |
| 8 | Storm sewer removal (X5510100) | LF | 627 | $31.00 | $35.00 | $15.00 |
| 9 | Inlets SPL N1 (X6024242) | EACH | 1 | $15,300 | $16,300 | $18,000 |
| 10 | Inlets SPL N2 (X6024244) | EACH | 1 | $14,500 | $15,400 | $18,000 |
| 11 | Inlets SPL N3 (X6024246) | EACH | 1 | $10,550 | $10,600 | $10,500 |
| 12 | Sanitary manhole adj (X6026050) | EACH | 2 | $425.00 | $2,900.00 | $1,000.00 |
| 13 | Comb CC&G TB6.24 SPL (X6060052) | LF | 1,171 | $37.25 | $36.00 | $45.00 |
| 14 | Traf cont & prot SPL (X7010216) | LS | 1 | $260,000 | $68,000 | $60,000 |
| 15 | RRPM reflector removl (X7830050) | EACH | 397 | $10.35 | $4.50 | $19.00 |
| 16 | Rel EX TS cont/cab CM (X8950103) | EACH | 1 | $2,650.00 | $2,650.00 | $2,625.00 |
| 17 | Construction layout (Z0013798) | LS | 1 | $32,025 | $77,000 | $15,000 |
| 18 | Drainage STR removed (Z0018700) | EACH | 10 | $1,400.00 | $652.00 | $330.00 |
| 19 | Drill-grout #6 T-bar (Z0018911) | EACH | 3,121 | $11.80 | $0.01 | $18.00 |
| 20 | Rock fill - replace (Z0054402) | CY | 80 | $115.00 | $88.00 | $130.00 |
| 21 | Storm sew WM req 15 (Z0056610) | LF | 143 | $170.50 | $107.00 | $172.00 |
| 22 | Storm sew WM req 18 (Z0056612) | LF | 293 | $140.75 | $104.00 | $125.00 |
| 23 | Storm sew WM req 24 (Z0056616) | LF | 181 | $195.00 | $157.00 | $210.00 |
| 24 | Storm sew WM req 36 (Z0056622) | LF | 644 | $254.50 | $262.00 | $285.00 |
| 25 | Temp pavement (Z0062456) | SY | 846 | $102.50 | $102.00 | $102.00 |
| 26 | Trainees (Z0076600) | HR | 2,500 | $0.80 | $0.80 | $0.80 |
| 27 | Trainees TPG (Z0076604) | HR | 2,500 | $15.00 | $15.00 | $15.00 |
| 28 | Tree remov 6-15 (20100110) | UNIT | 368 | $42.00 | $0.01 | $38.00 |
| 29 | Tree remov over 15 (20100210) | UNIT | 391 | $40.40 | $0.01 | $38.00 |
| 30 | Earth excavation (20200100) | CY | 5,985 | $19.25 | $21.75 | $48.00 |
| 31 | Rem & disp uns matl (20201200) | CY | 80 | $165.00 | $60.00 | $50.00 |
| 32 | Furnished excavation (20400800) | CY | 675 | $28.15 | $35.00 | $17.00 |
| 33 | Trench backfill (20800150) | CY | 1,699 | $45.00 | $40.00 | $55.00 |
| 34 | Seeding CL 2 (25000200) | ACRE | 3 | $3,850.00 | $4,700.00 | $8,000.00 |
| 35 | Nitrogen fert nutr (25000400) | LB | 280 | $5.00 | $5.60 | $2.50 |
| 36 | Phosphorus fert nutr (25000500) | LB | 280 | $5.00 | $5.60 | $2.50 |
| 37 | Potassium fert nutr (25000600) | LB | 280 | $5.00 | $5.60 | $2.50 |
| 38 | Mulch method 2 (25100115) | ACRE | 3 | $6,850.00 | $3,727.00 | $5,000.00 |
| 39 | Erosion contr blanket (25100630) | SY | 178 | $5.50 | $5.00 | $5.00 |
| 40 | Temp eros contr seed (28000250) | LB | 620 | $6.50 | $0.01 | $5.00 |
| 41 | Temp ditch checks (28000305) | LF | 312 | $19.00 | $29.00 | $11.00 |
| 42 | Perimeter eros bar (28000400) | LF | 293 | $7.85 | $9.25 | $6.00 |
| 43 | Inlet & pipe protect (28000500) | EACH | 55 | $91.50 | $0.01 | $230.00 |
| 44 | Stone riprap CL A4 (28100107) | SY | 384 | $61.50 | $78.50 | $125.00 |
| 45 | Filter fabric (28200200) | SY | 384 | $10.35 | $6.50 | $1.00 |
| 46 | Fab form conc rev mat (28500100) | SY | 94 | $160.00 | $140.00 | $90.00 |
| 47 | Process mod soil 12 (30200650) | SY | 13,962 | $2.50 | $6.50 | $9.25 |
| 48 | Lime (30201500) | TON | 279 | $172.00 | $180.00 | $175.00 |
| 49 | Sub gran mat A (31100100) | TON | 3,258 | $26.00 | $34.00 | $65.00 |
| 50 | Agg surf cse A (40200100) | TON | 30 | $60.50 | $55.00 | $80.00 |
| 51 | Aggregate-temp access (40201000) | TON | 639 | $37.00 | $0.01 | $45.00 |
| 52 | Welded wire reinf (42000060) | SY | 11,125 | $7.40 | $11.75 | $16.00 |
| 53 | PCC PVT 9 jointed (42000401) | SY | 11,125 | $72.85 | $85.50 | $107.00 |
| 54 | Protective coat (42001300) | SY | 13,539 | $0.01 | $0.01 | $1.30 |
| 55 | PCC driveway pavt 6 (42300200) | SY | 295 | $112.50 | $135.00 | $170.00 |
| 56 | PC conc sidewalk 4 (42400100) | SF | 8,367 | $7.85 | $8.50 | $12.00 |
| 57 | Detectable warnings (42400800) | SF | 137 | $48.55 | $46.80 | $115.00 |
| 58 | Pavement rem (44000100) | SY | 1,478 | $17.50 | $17.80 | $35.00 |
| 59 | Drive pavement rem (44000200) | SY | 410 | $22.25 | $18.50 | $12.00 |
| 60 | Comb curb gutter rem (44000500) | LF | 1,561 | $11.45 | $13.25 | $16.00 |
| 61 | Sidewalk rem (44000600) | SF | 5,082 | $4.50 | $1.00 | $2.00 |
| 62 | Welded wire reinf (44200050) | SY | 261 | $12.65 | $24.50 | $10.00 |
| 63 | CL B patch T2 9 (44200956) | SY | 43 | $420.00 | $466.00 | $255.00 |
| 64 | CL B patch T3 9 (44200962) | SY | 230 | $430.00 | $312.00 | $200.00 |
| 65 | CL B patch T4 9 (44200964) | SY | 31 | $440.00 | $306.00 | $350.00 |
| 66 | Dowel bars 1 1/4 (44201298) | EACH | 685 | $24.35 | $20.00 | $32.00 |
| 67 | Saw cuts (44213200) | LF | 1,680 | $8.00 | $12.00 | $7.00 |
| 68 | Pipe culvert remov (50105220) | LF | 582 | $26.50 | $30.00 | $12.00 |
| 69 | Box cul end sec C2 (54001002) | EACH | 3 | $36,250 | $22,730 | $28,000 |
| 70 | Box cul end sec C3 (54001003) | EACH | 3 | $31,570 | $24,760 | $29,000 |
| 71 | PCBC 6X4 (54010604) | LF | 38 | $1,250.00 | $1,181.00 | $1,200.00 |
| 72 | PCBC 8X4 (54010804) | LF | 44 | $1,250.00 | $1,216.00 | $1,300.00 |
| 73 | PCBC 8X5 (54010805) | LF | 48 | $1,170.00 | $948.00 | $1,300.00 |
| 74 | P cul CL A 1 15 (542A0220) | LF | 138 | $95.55 | $69.00 | $95.00 |
| 75 | PRC flar end sec 12 (54213657) | EACH | 2 | $3,500.00 | $1,334.00 | $1,800.00 |
| 76 | PRC flar end sec 15 (54213660) | EACH | 12 | $3,500.00 | $1,510.00 | $2,000.00 |
| 77 | PRC flar end sec 24 (54213669) | EACH | 1 | $3,950.00 | $2,000.00 | $2,500.00 |
| 78 | Concrete collar (54248510) | CY | 9.60 | $535.00 | $1,453.00 | $3,000.00 |
| 79 | TRVRS pipe GRT con ES (54260315) | LF | 153 | $93.25 | $117.00 | $210.00 |
| 80 | Storm sew CL A 1 12 (550A0050) | LF | 16 | $93.00 | $93.00 | $135.00 |
| 81 | Storm sew CL A 1 15 (550A0070) | LF | 1,055 | $93.00 | $71.00 | $90.00 |
| 82 | Storm sew CL A 1 18 (550A0090) | LF | 216 | $152.50 | $76.00 | $98.00 |
| 83 | Storm sew CL A 1 36 (550A0160) | LF | 294 | $181.65 | $145.00 | $220.00 |
| 84 | Storm sew CL A 2 15 (550A0360) | LF | 776 | $127.30 | $83.00 | $128.00 |
| 85 | Storm sew CL A 2 18 (550A0380) | LF | 54 | $157.00 | $84.00 | $140.00 |
| 86 | Storm sew CL A 2 24 (550A0410) | LF | 209 | $142.85 | $112.00 | $135.00 |
| 87 | Storm sew CL A 2 36 (550A0450) | LF | 333 | $189.50 | $167.00 | $225.00 |
| 88 | Man TA 4 dia T3F&G (60218500) | EACH | 2 | $3,850.00 | $3,480.00 | $4,800.00 |
| 89 | Man TA 4 dia T24F&G (60219540) | EACH | 4 | $4,650.00 | $3,480.00 | $4,600.00 |
| 90 | Inlets TA T3F&G (60235700) | EACH | 7 | $2,500.00 | $2,200.00 | $2,500.00 |
| 91 | Inlets TA T24F&G (60237470) | EACH | 7 | $2,500.00 | $2,200.00 | $2,400.00 |
| 92 | Inlets TB T3F&G (60240220) | EACH | 5 | $3,200.00 | $2,500.00 | $3,100.00 |
| 93 | Inlets TB T24F&G (60240328) | EACH | 19 | $2,850.00 | $2,500.00 | $2,900.00 |
| 94 | Inlets adjust (60260100) | EACH | 1 | $1,300.00 | $569.00 | $500.00 |
| 95 | Comb CC&G TY B-6.24 (60605000) | LF | 5,187 | $35.00 | $49.25 | $54.00 |
| 96 | Paved ditch TA-15 (60615400) | LF | 50 | $236.00 | $184.00 | $325.00 |
| 97 | Mobilization (67100100) | LS | 1 | $142,500 | $265,448 | $75,000 |
| 98 | Short term pavt mking (70300100) | LF | 3,000 | $5.25 | $3.20 | $3.00 |
| 99 | SHRT TRM pavt MK rem (70300150) | SF | 1,000 | $15.85 | $3.60 | $5.55 |
| 100 | Temp PVT MK LTR & sym paint (70300211) | SF | 94 | $3.20 | $12.70 | $48.00 |
| 101 | Temp PVT MK line 4 - paint (70300221) | LF | 29,241 | $0.80 | $1.10 | $1.50 |
| 102 | Temp PVT MK line 24 - paint (70300281) | LF | 70 | $3.20 | $12.70 | $20.00 |
| 103 | Sign panel T1 (72000100) | SF | 16 | $75.00 | $51.00 | $36.50 |
| 104 | Sign panel T2 (72000200) | SF | 47 | $76.10 | $55.00 | $45.55 |
| 105 | Remov sin pan assy TA (72400100) | EACH | 3 | $595.00 | $128.00 | $285.00 |
| 106 | Remov sign panel T1 (72400310) | SF | 7.50 | $15.85 | $16.00 | $15.75 |
| 107 | Remov sign panel T2 (72400320) | SF | 25 | $15.85 | $16.00 | $15.75 |
| 108 | Reloc sin pan assy TA (72400500) | EACH | 4 | $1,110.00 | $350.00 | $105.00 |
| 109 | Reloc sin pan assy TB (72400600) | EACH | 1 | $2,375.00 | $350.00 | $210.00 |
| 110 | Teles STL sin support (72800100) | LF | 109 | $53.00 | $34.00 | $19.95 |
| 111 | Polyurea PM T1 LTR-SY (78008200) | SF | 962 | $67.60 | $68.00 | $67.20 |
| 112 | Polyurea PM T1 LN 4 (78008210) | LF | 25,827 | $3.70 | $3.70 | $3.70 |
| 113 | Polyurea PM T1 LN 8 (78008240) | LF | 238 | $29.50 | $30.00 | $29.40 |
| 114 | Polyurea PM T1 LN 12 (78008250) | LF | 2,160 | $33.80 | $34.00 | $33.60 |
| 115 | Polyurea PM T1 LN 24 (78008270) | LF | 581 | $67.60 | $68.00 | $67.20 |
| 116 | Raised refl pavt MKR (78100100) | EACH | 541 | $48.00 | $45.00 | $78.75 |
| 117 | PVT MKG rem WTR blast (78300202) | SF | 27,761 | $1.05 | $3.80 | $4.05 |
| 118 | Undrgrd C PVC 1 (81028320) | LF | 172 | $17.00 | $17.00 | $16.80 |
| 119 | Undrgrd C PVC 1 1/2 (81028340) | LF | 690 | $17.00 | $17.00 | $16.80 |
| 120 | Undrgrd C PVC 2 1/2 (81028360) | LF | 109 | $26.40 | $26.00 | $26.25 |
| 121 | Undrgrd C PVC 3 1/2 (81028380) | LF | 210 | $37.00 | $37.00 | $36.75 |
| 122 | Undrgrd C PVC 4 (81028390) | LF | 6 | $105.60 | $106.00 | $105.00 |
| 123 | Handhole (81400100) | EACH | 4 | $1,320.00 | $1,321.00 | $1,312.50 |
| 124 | DBL handhole (81400300) | EACH | 1 | $2,650.00 | $2,643.00 | $2,625.00 |
| 125 | Elcbl C signal 14 2C (87301215) | LF | 228 | $4.20 | $4.25 | $4.20 |
| 126 | Elcbl C signal 14 3C (87301225) | LF | 228 | $4.50 | $4.50 | $4.45 |
| 127 | Elcbl C signal 14 5C (87301245) | LF | 1,915 | $4.75 | $4.75 | $4.75 |
| 128 | Elcbl C signal 14 7C (87301255) | LF | 503 | $5.80 | $5.80 | $5.75 |
| 129 | Elcbl C lead 14 1PR (87301305) | LF | 2,851 | $3.70 | $3.70 | $3.70 |
| 130 | Elcbl C serv 6 3C (87301815) | LF | 222 | $10.55 | $10.50 | $10.50 |
| 131 | Elcbl C egrdc 6 1C (87301900) | LF | 1,937 | $4.25 | $4.25 | $4.20 |
| 132 | TS post A 16 (87502700) | EACH | 1 | $2,320.00 | $2,325.00 | $2,310.00 |
| 133 | S maa & P 20 (87700140) | EACH | 1 | $13,500 | $13,531 | $13,440 |
| 134 | S maa & P 48 (87700280) | EACH | 1 | $24,800 | $24,840 | $24,675 |
| 135 | S maa & P 55 (87700320) | EACH | 1 | $26,400 | $26,427 | $26,250 |
| 136 | Conc FDN TY A (87800100) | LF | 3 | $395.95 | $396.00 | $395.00 |
| 137 | Conc FDN TY D (87800200) | LF | 3 | $1,160.00 | $1,163.00 | $1,155.00 |
| 138 | Conc FDN TY E 30D (87800400) | LF | 10 | $369.55 | $370.00 | $367.50 |
| 139 | Conc FDN TY E 36D (87800415) | LF | 28 | $438.20 | $439.00 | $435.75 |
| 140 | SH P LED 1F 3S BM (88040070) | EACH | 4 | $950.30 | $951.00 | $945.00 |
| 141 | SH P LED 1F 3S mam (88040090) | EACH | 6 | $1,003.00 | $1,004.00 | $997.50 |
| 142 | SH P LED 1F 5S BM (88040150) | EACH | 1 | $1,505.00 | $1,506.00 | $1,496.25 |
| 143 | SH P LED 1F 5S mam (88040160) | EACH | 1 | $1,640.00 | $1,639.00 | $1,627.50 |
| 144 | Ped SH P LED 1F BM CT (88102825) | EACH | 2 | $792.00 | $793.00 | $787.50 |
| 145 | TS backplate plastic (88200300) | EACH | 7 | $237.50 | $238.00 | $236.25 |
| 146 | Ind L det amp cdccodd (88500520) | EACH | 11 | $290.35 | $291.00 | $288.75 |
| 147 | Det loop T1 (88600100) | LF | 1,376 | $16.90 | $20.25 | $16.80 |
| 148 | Ped push-button (88800100) | EACH | 2 | $1,005.00 | $1,004.00 | $997.50 |
| 149 | Rel EM veh PR SY comp (89501420) | EACH | 1 | $1,900.50 | $1,903.00 | $1,890.00 |
| 150 | Rem elcbl FR con (89502300) | LF | 3,464 | $2.10 | $2.10 | $2.10 |
| 151 | Remov EX TS equip (89502375) | EACH | 3 | $5,300.00 | $5,285.00 | $5,250.00 |
| 152 | Remov EX handhole (89502380) | EACH | 4 | $475.00 | $476.00 | $472.50 |
| 153 | Remov EX DBL handhole (89502382) | EACH | 1 | $950.00 | $951.00 | $945.00 |
| 154 | Remov EX conc FDN (89502385) | EACH | 4 | $690.00 | $687.00 | $682.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of February 27, 2026. Compiled by Mirage Metrics.