IDOT contract 97866 bid tabulation
Columbia, section 21-00053-01-PV. Let by Illinois DOT on July 31, 2026, Monroe, District 08. 4 bids received; low bid $1,072,824 by Mayer Landscaping, Inc..
- Owner
- Illinois DOT
- Letting
- 31 JUL 2026
- Pay items
- 63
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Mayer Landscaping, Inc. | $1,072,824 | Low |
| 2 | Hank's Excavating & Landscaping, Inc. | $1,140,035 | +6.0% |
| 3 | DMS Contracting, Inc. | $1,199,799 | +12% |
| 4 | Baxmeyer Construction, Inc. | $1,235,468 | +15% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Mayer Landscaping, Inc. | 2. Hank's Excavating & Landscaping, Inc. | 3. DMS Contracting, Inc. | 4. Baxmeyer Construction, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | R R FL beacon A comp (X1400326) | EACH | 2 | $9,676.85 | $8,875.00 | $8,950.00 | $8,355.00 |
| 2 | HMA surf rem var DP (X4401198) | SY | 1,477 | $19.35 | $17.75 | $17.90 | $17.15 |
| 3 | Trench drain (X6010202) | EACH | 1 | $6,651.35 | $8,765.00 | $16,300 | $6,465.00 |
| 4 | Inlets SPL N1 (X6024242) | EACH | 1 | $3,665.15 | $2,800.00 | $3,500.00 | $5,075.00 |
| 5 | Traf cont & prot SPL (X7010216) | LS | 1 | $71,056 | $10,500 | $15,500 | $44,725 |
| 6 | Loc undergr utilities (X8030106) | LF | 70 | $59.05 | $130.00 | $95.00 | $145.00 |
| 7 | SS 1 wat MN 12 (Z0056648) | LF | 86 | $85.75 | $117.00 | $118.00 | $102.00 |
| 8 | Trainees (Z0076600) | HR | 500 | $0.80 | $0.80 | $0.80 | $0.80 |
| 9 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 | $15.00 | $15.00 |
| 10 | Earth excavation (20200100) | CY | 2,168 | $39.55 | $61.00 | $25.25 | $39.35 |
| 11 | Trench backfill (20800150) | CY | 208 | $45.55 | $50.00 | $97.50 | $30.85 |
| 12 | Seeding CL 1 (25000100) | ACRE | 0.60 | $6,225.45 | $8,875.00 | $12,000 | $5,160.00 |
| 13 | Nitrogen fert nutr (25000400) | LB | 54 | $1.25 | $2.30 | $10.00 | $13.50 |
| 14 | Phosphorus fert nutr (25000500) | LB | 54 | $1.25 | $2.30 | $10.00 | $13.50 |
| 15 | Potassium fert nutr (25000600) | LB | 54 | $1.25 | $2.30 | $10.00 | $13.50 |
| 16 | Mulch method 2 (25100115) | ACRE | 0.60 | $5,073.45 | $8,350.00 | $8,725.00 | $5,450.00 |
| 17 | Temp eros contr seed (28000250) | LB | 54 | $9.85 | $8.00 | $11.75 | $18.85 |
| 18 | Perimeter eros bar (28000400) | LF | 469 | $4.45 | $5.65 | $9.00 | $9.30 |
| 19 | Inlet & pipe protect (28000500) | EACH | 21 | $316.00 | $184.00 | $400.00 | $310.00 |
| 20 | Sub gran mat A 12 (31100910) | SY | 2,960 | $16.85 | $23.00 | $18.60 | $16.90 |
| 21 | Sub gran mat B 3 (31101191) | SY | 354 | $8.70 | $22.00 | $10.00 | $26.00 |
| 22 | Sub gran mat B 4 (31101200) | SY | 1,372 | $12.45 | $16.00 | $16.25 | $16.50 |
| 23 | Agg base cse B 4 (35101600) | SY | 335 | $23.40 | $25.00 | $27.00 | $22.00 |
| 24 | Agg base cse B 8 (35102000) | SY | 45 | $36.55 | $48.00 | $66.00 | $35.00 |
| 25 | PCC base cse W 6 (35400100) | SY | 708 | $60.75 | $88.00 | $66.00 | $50.50 |
| 26 | Agg surf cse A 6 (40200500) | SY | 43 | $36.40 | $48.00 | $35.55 | $33.25 |
| 27 | Aggregate-temp access (40201000) | TON | 750 | $43.50 | $40.00 | $36.55 | $62.00 |
| 28 | Bit matls PR CT (40600275) | LB | 6,391 | $1.85 | $1.70 | $1.70 | $2.75 |
| 29 | Bit matls tack CT (40600290) | LB | 2,200 | $3.30 | $3.00 | $3.05 | $3.25 |
| 30 | Temporary ramp (40600990) | SY | 44 | $0.01 | $0.01 | $0.01 | $27.25 |
| 31 | HMA BC IL-19.0 N50 (40603080) | TON | 821 | $171.75 | $157.00 | $158.60 | $190.50 |
| 32 | HMA SC IL-9.5 C N50 (40604050) | TON | 526 | $171.75 | $157.00 | $158.60 | $175.00 |
| 33 | Incidental HMA surf (40800050) | TON | 20 | $286.30 | $262.00 | $265.00 | $272.00 |
| 34 | PCC driveway pavt 6 (42300200) | SY | 335 | $113.15 | $116.00 | $175.70 | $162.00 |
| 35 | PC conc sidewalk 4 (42400100) | SF | 5,975 | $8.40 | $7.50 | $16.30 | $10.00 |
| 36 | Detectable warnings (42400800) | SF | 20 | $79.45 | $56.00 | $195.00 | $51.00 |
| 37 | Pavement rem (44000100) | SY | 1,201 | $9.15 | $17.00 | $22.95 | $12.85 |
| 38 | Drive pavement rem (44000200) | SY | 345 | $15.05 | $13.00 | $28.85 | $29.50 |
| 39 | Comb curb gutter rem (44000500) | LF | 10 | $72.75 | $69.00 | $65.95 | $95.00 |
| 40 | Sidewalk rem (44000600) | SF | 129 | $10.95 | $3.00 | $10.00 | $23.00 |
| 41 | Paved SHLD removal (44004250) | SY | 174 | $17.30 | $35.00 | $21.30 | $31.00 |
| 42 | Pavt patch T2 10 (44200120) | SY | 28 | $195.95 | $345.00 | $223.00 | $580.00 |
| 43 | Pipe culvert remov (50105220) | LF | 131 | $36.65 | $3.00 | $25.00 | $23.00 |
| 44 | PRC flar end sec 15 (54213660) | EACH | 1 | $1,973.45 | $2,100.00 | $2,850.00 | $1,770.00 |
| 45 | SS RG CL A 1 12 (550A2320) | LF | 986 | $56.05 | $70.00 | $72.25 | $68.50 |
| 46 | SS RG CL A 1 15 (550A2330) | LF | 236 | $73.05 | $83.00 | $95.50 | $91.50 |
| 47 | Pipe drains 10 (60100935) | LF | 19 | $127.20 | $84.00 | $134.70 | $48.75 |
| 48 | Man TA 4 dia T1F OL (60218300) | EACH | 1 | $4,446.65 | $2,900.00 | $5,220.00 | $3,825.00 |
| 49 | Man TA 4 dia T3F&G (60218500) | EACH | 1 | $4,446.65 | $2,900.00 | $7,025.00 | $3,825.00 |
| 50 | Inlets TA T3F&G (60235700) | EACH | 6 | $1,634.05 | $2,400.00 | $3,830.00 | $2,520.00 |
| 51 | Inlets TA T8G (60236200) | EACH | 1 | $1,634.00 | $2,400.00 | $3,450.00 | $2,520.00 |
| 52 | Inlets TB T3F&G (60240220) | EACH | 8 | $1,963.70 | $2,700.00 | $4,250.00 | $2,900.00 |
| 53 | Comb CC&G TY B-6.24 (60605000) | LF | 2,623 | $43.40 | $49.00 | $40.50 | $61.00 |
| 54 | Mobilization (67100100) | LS | 1 | $34,000 | $40,000 | $78,210 | $57,274 |
| 55 | Short term pavt mking (70300100) | LF | 130 | $2.85 | $2.65 | $2.60 | $5.50 |
| 56 | SHRT TRM pavt MK rem (70300150) | SF | 43 | $12.90 | $18.30 | $43.50 | $11.50 |
| 57 | Temp PVT MK line 4 - paint (70300221) | LF | 2,687 | $1.35 | $1.40 | $1.40 | $1.30 |
| 58 | Temp PVT MK line 24 - paint (70300281) | LF | 72 | $14.30 | $14.45 | $14.50 | $13.50 |
| 59 | Sign panel T1 (72000100) | SF | 39 | $31.50 | $29.00 | $29.00 | $27.25 |
| 60 | Metal post TY B (72900200) | LF | 68 | $34.35 | $31.50 | $31.75 | $29.50 |
| 61 | THPL PVT MK line 4 (78000200) | LF | 2,687 | $2.30 | $2.30 | $2.30 | $2.25 |
| 62 | THPL PVT MK line 24 (78000650) | LF | 72 | $19.20 | $19.35 | $19.50 | $18.25 |
| 63 | PVT MKG rem WTR blast (78300202) | SF | 54 | $18.30 | $18.65 | $18.75 | $17.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of July 31, 2026. Compiled by Mirage Metrics.