IDOT contract 97860 bid tabulation
Sauget, section 16-00015-01-PV. Let by Illinois DOT on August 1, 2025, St. Clair, District 08. 2 bids received; low bid $607,366 by Hank's Excavating & Landscaping, Inc..
- Owner
- Illinois DOT
- Letting
- 01 AUG 2025
- Pay items
- 64
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Hank's Excavating & Landscaping, Inc. | $607,366 | Low |
| 2 | DMS Contracting, Inc. | $929,175 | +53% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Hank's Excavating & Landscaping, Inc. | 2. DMS Contracting, Inc. |
|---|---|---|---|---|---|
| 1 | Gas marker post rem (XX009536) | EACH | 1 | $285.00 | $2,800.00 |
| 2 | Sawcut & seal new JTS (X0327771) | LF | 567 | $27.00 | $26.90 |
| 3 | Bollard removal (X0350810) | EACH | 1 | $285.00 | $2,200.00 |
| 4 | Inlet adj new lid SPL (X1200034) | EACH | 2 | $1,700.00 | $2,800.00 |
| 5 | Potholing (X1700066) | EACH | 4 | $2,700.00 | $990.50 |
| 6 | Furnished excav SPL (X2040805) | CY | 10 | $400.00 | $835.00 |
| 7 | Island pavement rem (X4402800) | SY | 25 | $350.00 | $702.00 |
| 8 | Water valves adj SPL (X5619210) | EACH | 5 | $525.00 | $985.00 |
| 9 | Traf cont & prot SPL (X7010216) | LS | 1 | $32,000 | $135,725 |
| 10 | Construction layout (Z0013798) | LS | 1 | $8,500.00 | $27,655 |
| 11 | Earth excavation (20200100) | CY | 58 | $155.00 | $185.00 |
| 12 | Perimeter eros bar (28000400) | LF | 50 | $12.35 | $120.50 |
| 13 | Sub gran mat A 4 (31100300) | SY | 35 | $31.50 | $115.00 |
| 14 | Sub gran mat A 6 (31100500) | SY | 115 | $128.00 | $71.10 |
| 15 | Sub gran mat A 10 (31100900) | SY | 75 | $96.00 | $109.00 |
| 16 | HMA base cse 10 (35501324) | SY | 75 | $317.50 | $373.00 |
| 17 | Bit matls PR CT (40600275) | LB | 21 | $50.50 | $50.75 |
| 18 | Bit matls tack CT (40600290) | LB | 590 | $5.70 | $5.75 |
| 19 | Mix CR JTS flangewys (40600400) | TON | 0.17 | $1,050.00 | $1,060.00 |
| 20 | HMA SC IL-9.5 D N90 (40604064) | TON | 111 | $253.00 | $255.00 |
| 21 | Incidental HMA surf (40800050) | TON | 1 | $695.00 | $702.00 |
| 22 | PC conc sidewalk 4 (42400100) | SF | 268 | $32.00 | $29.15 |
| 23 | Pavement rem (44000100) | SY | 52 | $85.00 | $106.25 |
| 24 | HMA surf rem 1 1/2 (44000155) | SY | 1,130 | $18.60 | $18.75 |
| 25 | Comb curb gutter rem (44000500) | LF | 501 | $13.75 | $35.10 |
| 26 | HMA shoulders 8 (48203029) | SY | 80 | $135.00 | $136.00 |
| 27 | Man adjust (60255500) | EACH | 3 | $1,345.00 | $308.00 |
| 28 | Comb CC&G TY B-6.24 (60605000) | LF | 220 | $144.25 | $168.00 |
| 29 | Comb CC&G TM6.24 (60610400) | LF | 49 | $194.00 | $190.00 |
| 30 | Island pavement 6 (60625600) | SY | 15 | $250.00 | $1,150.00 |
| 31 | Mobilization (67100100) | LS | 1 | $100,000 | $149,250 |
| 32 | TR cont & prot 701602 (70102632) | LS | 1 | $5,500.00 | $93,350 |
| 33 | Changeable message SN (70107025) | CAL DAY | 60 | $80.50 | $140.00 |
| 34 | Short term pavt mking (70300100) | LF | 1,274 | $3.75 | $1.00 |
| 35 | SHRT TRM pavt MK rem (70300150) | SF | 305 | $0.75 | $1.00 |
| 36 | Sign panel T1 (72000100) | SF | 5 | $152.25 | $153.50 |
| 37 | Rem & rel sign panel T1 (72400735) | SF | 3 | $100.00 | $2,965.00 |
| 38 | THPL PVT MK LTR & sym (78000100) | SF | 301 | $12.60 | $12.75 |
| 39 | THPL PVT MK line 6 (78000400) | LF | 2,548 | $3.15 | $3.20 |
| 40 | THPL PVT MK line 8 (78000500) | LF | 415 | $6.30 | $6.35 |
| 41 | THPL PVT MK line 12 (78000600) | LF | 544 | $7.35 | $7.45 |
| 42 | THPL PVT MK line 24 (78000650) | LF | 180 | $10.50 | $10.60 |
| 43 | PVT MKG rem WTR blast (78300202) | SF | 3,368 | $1.50 | $1.50 |
| 44 | Undrgrd C PVC 1 1/4 (81028330) | LF | 90 | $68.25 | $69.00 |
| 45 | Undrgrd C CNC 2 1/2 (81028760) | LF | 21 | $147.00 | $148.35 |
| 46 | Undrgrd C CNC 4 (81028790) | LF | 210 | $73.50 | $74.20 |
| 47 | DBL handhole PCC (81400720) | EACH | 1 | $6,825.00 | $6,900.00 |
| 48 | Main EX TR sig instal (85000200) | EACH | 1 | $7,875.00 | $7,950.00 |
| 49 | Elcbl C signal 14 2C (87301215) | LF | 830 | $6.30 | $6.50 |
| 50 | Elcbl C signal 14 5C (87301245) | LF | 1,410 | $8.40 | $8.50 |
| 51 | Elcbl C signal 14 7C (87301255) | LF | 1,500 | $9.45 | $9.55 |
| 52 | Elcbl C lead 14 1PR (87301305) | LF | 1,860 | $4.20 | $4.25 |
| 53 | Elcbl C egrdc 6 1C (87301900) | LF | 610 | $8.40 | $8.50 |
| 54 | TS post 15 (87501100) | EACH | 1 | $3,722.25 | $3,755.00 |
| 55 | Conc FDN TY A (87800100) | LF | 3 | $724.50 | $731.25 |
| 56 | Drill EX foundation (87900100) | EACH | 1 | $3,675.00 | $3,710.00 |
| 57 | Drill EX handhole (87900200) | EACH | 2 | $420.00 | $423.85 |
| 58 | SH LED 1F 3S BM (88030050) | EACH | 1 | $2,047.50 | $2,070.00 |
| 59 | SH LED 1F 5S BM (88030100) | EACH | 1 | $2,520.00 | $2,550.00 |
| 60 | Det loop T1 (88600100) | LF | 2,400 | $32.55 | $32.85 |
| 61 | Mod EX contr (89502200) | EACH | 1 | $1,575.00 | $1,600.00 |
| 62 | Remov EX TS equip (89502375) | EACH | 1 | $7,402.50 | $7,470.00 |
| 63 | Remov EX DBL handhole (89502382) | EACH | 1 | $2,625.00 | $2,650.00 |
| 64 | Remov EX conc FDN (89502385) | EACH | 1 | $840.00 | $850.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of August 1, 2025. Compiled by Mirage Metrics.