IDOT contract 97894 bid tabulation
Belleville, section 22-00176-06-RS. Let by Illinois DOT on September 18, 2026, St. Clair, District 08. 5 bids received; low bid $4,145,137 by Hank's Excavating & Landscaping, Inc..
- Owner
- Illinois DOT
- Letting
- 18 SEP 2026
- Pay items
- 94
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Hank's Excavating & Landscaping, Inc. | $4,145,137 | Low |
| 2 | DMS Contracting, Inc. | $4,722,750 | +14% |
| 3 | Kinney Contractors, Inc. | $4,979,845 | +20% |
| 4 | Mayer Landscaping, Inc. | $5,075,053 | +22% |
| 5 | Keller Construction, Inc. | $5,253,087 | +27% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Hank's Excavating & Landscaping, Inc. | 2. DMS Contracting, Inc. | 3. Kinney Contractors, Inc. | 4. Mayer Landscaping, Inc. | 5. Keller Construction, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Green methyl PVT MKNG (XX009763) | SF | 16,130 | $6.30 | $11.61 | $12.00 | $12.55 | $11.55 |
| 2 | Methyl PVT MK line 24 (XX009764) | LF | 3,490 | $17.00 | $23.23 | $24.00 | $25.10 | $23.10 |
| 3 | Rem ped push-button (X1400031) | EACH | 6 | $168.00 | $168.93 | $175.00 | $182.50 | $168.00 |
| 4 | HMA surf rem var DP (X4401198) | SY | 1,571 | $6.00 | $6.22 | $6.20 | $6.70 | $6.18 |
| 5 | CL B patch T2 13 SPL (X4420113) | SY | 24 | $285.00 | $377.50 | $300.00 | $292.70 | $445.00 |
| 6 | CL B patch T4 8 SPL (X4420668) | SY | 649 | $270.00 | $212.50 | $248.00 | $363.00 | $516.00 |
| 7 | CL B patch T3 8 SPL (X4420695) | SY | 104 | $295.00 | $311.00 | $248.00 | $363.00 | $628.00 |
| 8 | CL B patch T3 13 SPL (X4421020) | SY | 118 | $245.00 | $359.15 | $295.00 | $292.70 | $360.00 |
| 9 | CL B patch T4 13 SPL (X4421023) | SY | 2,076 | $220.00 | $178.50 | $292.00 | $292.70 | $290.50 |
| 10 | Curb & gutter SPL (X6060044) | LF | 896 | $90.00 | $118.54 | $100.00 | $102.50 | $72.60 |
| 11 | Conc median SPL (X6060714) | SF | 553 | $90.00 | $99.68 | $45.00 | $85.70 | $83.00 |
| 12 | Stamp CLRD PCC med 6 (X6062206) | SF | 2,464 | $20.00 | $31.98 | $34.00 | $25.05 | $34.00 |
| 13 | Traf cont & prot SPL (X7010216) | LS | 1 | $140,000 | $364,362 | $386,400 | $276,897 | $165,150 |
| 14 | Handhole SPL (X8140105) | EACH | 6 | $3,675.00 | $3,695.28 | $4,000.00 | $5,676.35 | $3,675.00 |
| 15 | Handhole to BE adjust (X8140115) | EACH | 3 | $100.00 | $0.01 | $3,300.00 | $6,844.40 | $0.01 |
| 16 | Accessible ped signal (X8760200) | EACH | 8 | $1,905.00 | $1,916.26 | $2,000.00 | $2,070.45 | $1,905.75 |
| 17 | Concrete steps (Z0012450) | CY | 2.20 | $4,500.00 | $3,737.40 | $5,500.00 | $8,314.60 | $10,035 |
| 18 | Conc step remov (Z0012455) | EACH | 3 | $500.00 | $632.80 | $1,000.00 | $397.60 | $105.00 |
| 19 | Construction layout (Z0013798) | LS | 1 | $55,000 | $18,965 | $75,000 | $57,037 | $20,000 |
| 20 | Trainees (Z0076600) | HR | 2,000 | $0.80 | $0.80 | $0.80 | $0.80 | $0.80 |
| 21 | Trainees TPG (Z0076604) | HR | 2,000 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 22 | Topsoil F & P 4 (21101615) | SY | 1,377 | $20.00 | $18.64 | $15.00 | $30.45 | $45.70 |
| 23 | Seeding CL 1A (25000110) | ACRE | 0.50 | $16,000 | $7,527.50 | $10,500 | $21,145 | $7,000.00 |
| 24 | Nitrogen fert nutr (25000400) | LB | 45 | $2.30 | $45.60 | $5.50 | $1.25 | $7.85 |
| 25 | Phosphorus fert nutr (25000500) | LB | 45 | $2.30 | $45.60 | $5.50 | $1.25 | $7.85 |
| 26 | Potassium fert nutr (25000600) | LB | 45 | $2.30 | $45.60 | $5.50 | $1.25 | $7.85 |
| 27 | Mulch method 1 (25100105) | ACRE | 0.50 | $16,000 | $13,581 | $6,600.00 | $20,666 | $9,150.00 |
| 28 | Inlet & pipe protect (28000500) | EACH | 58 | $250.00 | $394.02 | $220.00 | $577.00 | $160.00 |
| 29 | Agg base cse B (35101500) | CY | 147 | $150.00 | $98.57 | $110.00 | $162.70 | $123.40 |
| 30 | Agg base cse B 4 (35101600) | SY | 2,841 | $14.00 | $17.32 | $41.60 | $29.00 | $44.20 |
| 31 | Aggregate-temp access (40201000) | TON | 100 | $42.00 | $153.51 | $60.00 | $50.95 | $88.00 |
| 32 | Temporary ramp (40600990) | SY | 300 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 33 | HMA SC IL-9.5 C N70 (40604052) | TON | 5,807 | $142.55 | $153.97 | $140.00 | $154.85 | $142.55 |
| 34 | Bit matls tack CT (40800029) | LB | 24,061 | $2.00 | $2.09 | $2.20 | $2.25 | $2.08 |
| 35 | Incidental HMA surf (40800050) | TON | 182 | $300.00 | $300.90 | $290.00 | $325.10 | $299.25 |
| 36 | PCC PVT 8 jointed (42000301) | SY | 148 | $220.00 | $318.62 | $152.00 | $199.20 | $262.32 |
| 37 | PCC driveway pavt 8 (42300400) | SY | 87 | $225.00 | $141.00 | $152.00 | $280.95 | $300.92 |
| 38 | PC conc sidewalk 4 (42400100) | SF | 13,972 | $17.00 | $17.37 | $14.00 | $17.50 | $28.75 |
| 39 | PC conc sidewalk 6 (42400300) | SF | 6,360 | $17.50 | $23.76 | $14.00 | $18.95 | $30.00 |
| 40 | Detectable warnings (42400800) | SF | 1,491 | $46.50 | $101.53 | $48.00 | $71.70 | $54.55 |
| 41 | Pavement rem (44000100) | SY | 773 | $40.00 | $44.76 | $50.00 | $48.70 | $39.90 |
| 42 | HMA surf rem 2 (44000157) | SY | 49,603 | $6.20 | $6.22 | $6.00 | $6.70 | $6.18 |
| 43 | Drive pavement rem (44000200) | SY | 149 | $24.00 | $42.72 | $32.00 | $30.70 | $44.10 |
| 44 | Curb rem (44000300) | LF | 3,464 | $23.00 | $14.86 | $22.00 | $22.55 | $13.12 |
| 45 | Sidewalk rem (44000600) | SF | 16,828 | $3.50 | $2.27 | $5.00 | $3.00 | $3.41 |
| 46 | Concrete collar (54248510) | CY | 0.60 | $1,500.00 | $1,241.52 | $2,600.00 | $2,275.15 | $8,350.00 |
| 47 | Storm sewer rem 12 (55100500) | LF | 5 | $245.00 | $159.12 | $125.00 | $190.45 | $210.00 |
| 48 | Water valves adjust (56109210) | EACH | 4 | $180.00 | $1,635.38 | $775.00 | $145.90 | $710.00 |
| 49 | Dom met VLTS adj (56500300) | EACH | 6 | $400.00 | $789.94 | $600.00 | $145.90 | $710.00 |
| 50 | Inlets TA T3F&G (60235700) | EACH | 2 | $2,800.00 | $3,379.99 | $3,000.00 | $4,016.45 | $7,585.00 |
| 51 | Inlets adjust (60260100) | EACH | 2 | $1,300.00 | $827.58 | $660.00 | $1,452.35 | $930.00 |
| 52 | Inlets adj new T1F OL (60260300) | EACH | 1 | $1,800.00 | $1,877.39 | $3,000.00 | $1,931.45 | $1,550.00 |
| 53 | Inlets adj new T4F&G (60260600) | EACH | 2 | $2,300.00 | $2,402.65 | $1,700.00 | $2,473.35 | $2,050.00 |
| 54 | Fill inlets (60500305) | EACH | 2 | $600.00 | $790.27 | $700.00 | $1,441.00 | $1,260.00 |
| 55 | Conc curb TB (60600605) | LF | 2,943 | $85.00 | $91.30 | $95.00 | $103.40 | $93.85 |
| 56 | Comb CC&G TB6.12 (60603800) | LF | 176 | $95.00 | $125.87 | $104.00 | $109.75 | $104.60 |
| 57 | Comb CC&G TB6.18 (60604400) | LF | 262 | $100.00 | $101.51 | $110.00 | $110.95 | $101.90 |
| 58 | Mobilization (67100100) | LS | 1 | $160,000 | $212,940 | $333,000 | $178,553 | $407,755 |
| 59 | TR cont surveillance (70103815) | CAL DAY | 10 | $100.00 | $2,084.28 | $1,600.00 | $1.00 | $378.00 |
| 60 | Temp PVT MK line 4 - paint (70300221) | LF | 47,255 | $0.01 | $0.42 | $0.40 | $0.45 | $0.01 |
| 61 | Temp PVT MK line 12 - paint (70300261) | LF | 380 | $0.01 | $3.17 | $3.00 | $3.40 | $0.01 |
| 62 | Sign panel T1 (72000100) | SF | 515 | $27.55 | $27.71 | $75.00 | $36.40 | $26.25 |
| 63 | Remov sin pan assy TA (72400100) | EACH | 21 | $65.50 | $915.91 | $200.00 | $62.55 | $215.16 |
| 64 | Reloc sin pan assy TA (72400500) | EACH | 2 | $220.50 | $679.68 | $500.00 | $72.95 | $586.54 |
| 65 | Metal post TY A (72900100) | LF | 872 | $16.80 | $16.89 | $30.00 | $13.05 | $15.91 |
| 66 | THPL PVT MK LTR & sym (78000100) | SF | 3,686 | $18.90 | $19.00 | $20.00 | $20.55 | $18.90 |
| 67 | THPL PVT MK line 4 (78000200) | LF | 43,003 | $0.70 | $0.71 | $0.72 | $0.75 | $0.70 |
| 68 | THPL PVT MK line 8 (78000500) | LF | 4,345 | $4.20 | $4.22 | $4.30 | $4.55 | $4.20 |
| 69 | THPL PVT MK line 12 (78000600) | LF | 542 | $6.30 | $6.33 | $6.60 | $6.85 | $6.30 |
| 70 | THPL PVT MK line 24 (78000650) | LF | 224 | $12.60 | $12.67 | $13.20 | $13.70 | $12.60 |
| 71 | PVT MKG rem WTR blast (78300202) | SF | 16,130 | $1.05 | $1.06 | $1.00 | $1.15 | $0.01 |
| 72 | Undrgrd C PVC 1 (81028320) | LF | 198 | $63.00 | $63.35 | $66.00 | $68.45 | $63.00 |
| 73 | Undrgrd C PVC 1 1/2 (81028340) | LF | 52 | $42.00 | $42.23 | $44.00 | $45.65 | $42.00 |
| 74 | Undrgrd C PVC 2 (81028350) | LF | 56 | $47.25 | $47.51 | $49.00 | $51.35 | $47.25 |
| 75 | Undrgrd C PVC 2 1/2 (81028360) | LF | 131 | $126.00 | $126.70 | $132.00 | $136.90 | $126.00 |
| 76 | Undrgrd C PVC 3 1/2 (81028380) | LF | 61 | $78.75 | $79.18 | $82.00 | $85.55 | $78.75 |
| 77 | DBL handhole (81400300) | EACH | 1 | $3,675.00 | $3,695.28 | $3,800.00 | $3,992.55 | $3,675.00 |
| 78 | Elcbl C signal 14 2C (87301215) | LF | 1,077 | $2.45 | $2.48 | $2.55 | $2.70 | $2.47 |
| 79 | Elcbl C signal 14 3C (87301225) | LF | 1,319 | $3.20 | $3.22 | $3.30 | $3.50 | $3.20 |
| 80 | Elcbl C signal 14 5C (87301245) | LF | 2,038 | $5.30 | $5.33 | $5.50 | $5.75 | $5.30 |
| 81 | Elcbl C lead 14 1PR (87301305) | LF | 1,144 | $2.75 | $2.75 | $2.80 | $2.95 | $2.73 |
| 82 | Elcbl C egrdc 6 1C (87301900) | LF | 1,064 | $3.15 | $3.17 | $3.30 | $3.40 | $3.15 |
| 83 | TS post 15 (87501100) | EACH | 1 | $3,900.00 | $3,959.22 | $4,000.00 | $4,277.75 | $3,937.50 |
| 84 | Ped push-but post T1 (87600100) | EACH | 5 | $2,785.00 | $2,797.85 | $3,000.00 | $3,022.95 | $2,782.50 |
| 85 | Conc FDN TY A (87800100) | LF | 3 | $404.25 | $406.48 | $400.00 | $439.20 | $404.25 |
| 86 | SH P LED 3F 3S BM (88040355) | EACH | 1 | $3,192.00 | $3,209.61 | $3,300.00 | $3,467.85 | $3,192.00 |
| 87 | Ped SH LED 2F BM CDT (88102747) | EACH | 2 | $3,675.00 | $3,695.28 | $3,800.00 | $3,992.60 | $3,675.00 |
| 88 | TS backplate (88200100) | EACH | 3 | $315.00 | $316.74 | $330.00 | $342.20 | $315.00 |
| 89 | Det loop T1 (88600100) | LF | 1,368 | $36.75 | $36.95 | $35.00 | $39.95 | $36.75 |
| 90 | Ped push-button (88800100) | EACH | 8 | $315.00 | $316.74 | $330.00 | $342.20 | $315.00 |
| 91 | Mod EX contr (89502200) | EACH | 1 | $2,100.00 | $2,111.59 | $2,200.00 | $2,281.45 | $2,100.00 |
| 92 | Remov EX TS equip (89502375) | EACH | 1 | $6,378.75 | $6,413.94 | $6,600.00 | $6,929.95 | $6,378.75 |
| 93 | Remov EX handhole (89502380) | EACH | 5 | $1,575.00 | $1,583.69 | $1,650.00 | $1,711.10 | $1,575.00 |
| 94 | Remov EX conc FDN (89502385) | EACH | 1 | $750.75 | $754.89 | $800.00 | $815.65 | $750.75 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of September 18, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.