RankBidderTotal bidAgainst the low bid
1Hank's Excavating & Landscaping, Inc.$4,145,137Low
2DMS Contracting, Inc.$4,722,750+14%
3Kinney Contractors, Inc.$4,979,845+20%
4Mayer Landscaping, Inc.$5,075,053+22%
5Keller Construction, Inc.$5,253,087+27%
IDOT contract 97894: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Hank's Excavating & Landscaping, Inc.2. DMS Contracting, Inc.3. Kinney Contractors, Inc.4. Mayer Landscaping, Inc.5. Keller Construction, Inc.
1Green methyl PVT MKNG (XX009763)SF16,130$6.30$11.61$12.00$12.55$11.55
2Methyl PVT MK line 24 (XX009764)LF3,490$17.00$23.23$24.00$25.10$23.10
3Rem ped push-button (X1400031)EACH6$168.00$168.93$175.00$182.50$168.00
4HMA surf rem var DP (X4401198)SY1,571$6.00$6.22$6.20$6.70$6.18
5CL B patch T2 13 SPL (X4420113)SY24$285.00$377.50$300.00$292.70$445.00
6CL B patch T4 8 SPL (X4420668)SY649$270.00$212.50$248.00$363.00$516.00
7CL B patch T3 8 SPL (X4420695)SY104$295.00$311.00$248.00$363.00$628.00
8CL B patch T3 13 SPL (X4421020)SY118$245.00$359.15$295.00$292.70$360.00
9CL B patch T4 13 SPL (X4421023)SY2,076$220.00$178.50$292.00$292.70$290.50
10Curb & gutter SPL (X6060044)LF896$90.00$118.54$100.00$102.50$72.60
11Conc median SPL (X6060714)SF553$90.00$99.68$45.00$85.70$83.00
12Stamp CLRD PCC med 6 (X6062206)SF2,464$20.00$31.98$34.00$25.05$34.00
13Traf cont & prot SPL (X7010216)LS1$140,000$364,362$386,400$276,897$165,150
14Handhole SPL (X8140105)EACH6$3,675.00$3,695.28$4,000.00$5,676.35$3,675.00
15Handhole to BE adjust (X8140115)EACH3$100.00$0.01$3,300.00$6,844.40$0.01
16Accessible ped signal (X8760200)EACH8$1,905.00$1,916.26$2,000.00$2,070.45$1,905.75
17Concrete steps (Z0012450)CY2.20$4,500.00$3,737.40$5,500.00$8,314.60$10,035
18Conc step remov (Z0012455)EACH3$500.00$632.80$1,000.00$397.60$105.00
19Construction layout (Z0013798)LS1$55,000$18,965$75,000$57,037$20,000
20Trainees (Z0076600)HR2,000$0.80$0.80$0.80$0.80$0.80
21Trainees TPG (Z0076604)HR2,000$15.00$15.00$15.00$15.00$15.00
22Topsoil F & P 4 (21101615)SY1,377$20.00$18.64$15.00$30.45$45.70
23Seeding CL 1A (25000110)ACRE0.50$16,000$7,527.50$10,500$21,145$7,000.00
24Nitrogen fert nutr (25000400)LB45$2.30$45.60$5.50$1.25$7.85
25Phosphorus fert nutr (25000500)LB45$2.30$45.60$5.50$1.25$7.85
26Potassium fert nutr (25000600)LB45$2.30$45.60$5.50$1.25$7.85
27Mulch method 1 (25100105)ACRE0.50$16,000$13,581$6,600.00$20,666$9,150.00
28Inlet & pipe protect (28000500)EACH58$250.00$394.02$220.00$577.00$160.00
29Agg base cse B (35101500)CY147$150.00$98.57$110.00$162.70$123.40
30Agg base cse B 4 (35101600)SY2,841$14.00$17.32$41.60$29.00$44.20
31Aggregate-temp access (40201000)TON100$42.00$153.51$60.00$50.95$88.00
32Temporary ramp (40600990)SY300$0.01$0.01$0.01$0.01$0.01
33HMA SC IL-9.5 C N70 (40604052)TON5,807$142.55$153.97$140.00$154.85$142.55
34Bit matls tack CT (40800029)LB24,061$2.00$2.09$2.20$2.25$2.08
35Incidental HMA surf (40800050)TON182$300.00$300.90$290.00$325.10$299.25
36PCC PVT 8 jointed (42000301)SY148$220.00$318.62$152.00$199.20$262.32
37PCC driveway pavt 8 (42300400)SY87$225.00$141.00$152.00$280.95$300.92
38PC conc sidewalk 4 (42400100)SF13,972$17.00$17.37$14.00$17.50$28.75
39PC conc sidewalk 6 (42400300)SF6,360$17.50$23.76$14.00$18.95$30.00
40Detectable warnings (42400800)SF1,491$46.50$101.53$48.00$71.70$54.55
41Pavement rem (44000100)SY773$40.00$44.76$50.00$48.70$39.90
42HMA surf rem 2 (44000157)SY49,603$6.20$6.22$6.00$6.70$6.18
43Drive pavement rem (44000200)SY149$24.00$42.72$32.00$30.70$44.10
44Curb rem (44000300)LF3,464$23.00$14.86$22.00$22.55$13.12
45Sidewalk rem (44000600)SF16,828$3.50$2.27$5.00$3.00$3.41
46Concrete collar (54248510)CY0.60$1,500.00$1,241.52$2,600.00$2,275.15$8,350.00
47Storm sewer rem 12 (55100500)LF5$245.00$159.12$125.00$190.45$210.00
48Water valves adjust (56109210)EACH4$180.00$1,635.38$775.00$145.90$710.00
49Dom met VLTS adj (56500300)EACH6$400.00$789.94$600.00$145.90$710.00
50Inlets TA T3F&G (60235700)EACH2$2,800.00$3,379.99$3,000.00$4,016.45$7,585.00
51Inlets adjust (60260100)EACH2$1,300.00$827.58$660.00$1,452.35$930.00
52Inlets adj new T1F OL (60260300)EACH1$1,800.00$1,877.39$3,000.00$1,931.45$1,550.00
53Inlets adj new T4F&G (60260600)EACH2$2,300.00$2,402.65$1,700.00$2,473.35$2,050.00
54Fill inlets (60500305)EACH2$600.00$790.27$700.00$1,441.00$1,260.00
55Conc curb TB (60600605)LF2,943$85.00$91.30$95.00$103.40$93.85
56Comb CC&G TB6.12 (60603800)LF176$95.00$125.87$104.00$109.75$104.60
57Comb CC&G TB6.18 (60604400)LF262$100.00$101.51$110.00$110.95$101.90
58Mobilization (67100100)LS1$160,000$212,940$333,000$178,553$407,755
59TR cont surveillance (70103815)CAL DAY10$100.00$2,084.28$1,600.00$1.00$378.00
60Temp PVT MK line 4 - paint (70300221)LF47,255$0.01$0.42$0.40$0.45$0.01
61Temp PVT MK line 12 - paint (70300261)LF380$0.01$3.17$3.00$3.40$0.01
62Sign panel T1 (72000100)SF515$27.55$27.71$75.00$36.40$26.25
63Remov sin pan assy TA (72400100)EACH21$65.50$915.91$200.00$62.55$215.16
64Reloc sin pan assy TA (72400500)EACH2$220.50$679.68$500.00$72.95$586.54
65Metal post TY A (72900100)LF872$16.80$16.89$30.00$13.05$15.91
66THPL PVT MK LTR & sym (78000100)SF3,686$18.90$19.00$20.00$20.55$18.90
67THPL PVT MK line 4 (78000200)LF43,003$0.70$0.71$0.72$0.75$0.70
68THPL PVT MK line 8 (78000500)LF4,345$4.20$4.22$4.30$4.55$4.20
69THPL PVT MK line 12 (78000600)LF542$6.30$6.33$6.60$6.85$6.30
70THPL PVT MK line 24 (78000650)LF224$12.60$12.67$13.20$13.70$12.60
71PVT MKG rem WTR blast (78300202)SF16,130$1.05$1.06$1.00$1.15$0.01
72Undrgrd C PVC 1 (81028320)LF198$63.00$63.35$66.00$68.45$63.00
73Undrgrd C PVC 1 1/2 (81028340)LF52$42.00$42.23$44.00$45.65$42.00
74Undrgrd C PVC 2 (81028350)LF56$47.25$47.51$49.00$51.35$47.25
75Undrgrd C PVC 2 1/2 (81028360)LF131$126.00$126.70$132.00$136.90$126.00
76Undrgrd C PVC 3 1/2 (81028380)LF61$78.75$79.18$82.00$85.55$78.75
77DBL handhole (81400300)EACH1$3,675.00$3,695.28$3,800.00$3,992.55$3,675.00
78Elcbl C signal 14 2C (87301215)LF1,077$2.45$2.48$2.55$2.70$2.47
79Elcbl C signal 14 3C (87301225)LF1,319$3.20$3.22$3.30$3.50$3.20
80Elcbl C signal 14 5C (87301245)LF2,038$5.30$5.33$5.50$5.75$5.30
81Elcbl C lead 14 1PR (87301305)LF1,144$2.75$2.75$2.80$2.95$2.73
82Elcbl C egrdc 6 1C (87301900)LF1,064$3.15$3.17$3.30$3.40$3.15
83TS post 15 (87501100)EACH1$3,900.00$3,959.22$4,000.00$4,277.75$3,937.50
84Ped push-but post T1 (87600100)EACH5$2,785.00$2,797.85$3,000.00$3,022.95$2,782.50
85Conc FDN TY A (87800100)LF3$404.25$406.48$400.00$439.20$404.25
86SH P LED 3F 3S BM (88040355)EACH1$3,192.00$3,209.61$3,300.00$3,467.85$3,192.00
87Ped SH LED 2F BM CDT (88102747)EACH2$3,675.00$3,695.28$3,800.00$3,992.60$3,675.00
88TS backplate (88200100)EACH3$315.00$316.74$330.00$342.20$315.00
89Det loop T1 (88600100)LF1,368$36.75$36.95$35.00$39.95$36.75
90Ped push-button (88800100)EACH8$315.00$316.74$330.00$342.20$315.00
91Mod EX contr (89502200)EACH1$2,100.00$2,111.59$2,200.00$2,281.45$2,100.00
92Remov EX TS equip (89502375)EACH1$6,378.75$6,413.94$6,600.00$6,929.95$6,378.75
93Remov EX handhole (89502380)EACH5$1,575.00$1,583.69$1,650.00$1,711.10$1,575.00
94Remov EX conc FDN (89502385)EACH1$750.75$754.89$800.00$815.65$750.75
IDOT contract 97894: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of September 18, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy