IDOT contract 97853 bid tabulation

Edwardsville, section 21-00111-02-BT. Let by Illinois DOT on January 17, 2025, Madison, District 08. 4 bids received; low bid $531,755 by Keller Construction, Inc..

Owner
Illinois DOT
Letting
17 JAN 2025
Pay items
54
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Keller Construction, Inc.$531,755Low
2RCS Construction, Inc.$550,163+3.0%
3Stutz Excavating, Inc.$605,531+14%
4Hank's Excavating & Landscaping, Inc.$720,255+35%
IDOT contract 97853: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Keller Construction, Inc.2. RCS Construction, Inc.3. Stutz Excavating, Inc.4. Hank's Excavating & Landscaping, Inc.
1Bollard removal (X0350810)EACH1$355.00$480.84$325.00$300.00
2PC conc sidewalk 5 SP (X4240430)SF16,780$7.00$8.50$8.00$10.00
3Man adj new T1F CL SP (X6025800)EACH4$1,585.00$2,061.26$2,000.00$865.00
4San MH adj new T1F CL (X6026056)EACH2$1,705.00$2,061.26$1,850.00$865.00
5San MH rec new T1F CL (X6026057)EACH2$3,435.00$1,764.71$1,650.00$3,845.00
6Man reconst SPL (X6028000)EACH3$1,330.00$6,392.16$6,250.00$3,535.00
7Rem RE-erect EX sign (X7240600)EACH6$120.00$65.00$71.25$600.00
8Gas valve adjusted (Z0001110)EACH1$575.00$140.00$350.00$535.00
9Construction layout (Z0013798)LS1$9,000.00$18,500$15,350$5,000.00
10Earth excavation (20200100)CY2,105$21.00$28.44$38.00$45.00
11Trench backfill (20800150)CY10$61.00$89.33$152.50$57.75
12Seeding CL 1A (25000110)ACRE0.75$7,455.00$10,000$8,800.00$3,500.00
13Nitrogen fert nutr (25000400)LB68$26.25$2.00$7.60$2.30
14Phosphorus fert nutr (25000500)LB68$26.25$2.00$7.60$2.30
15Potassium fert nutr (25000600)LB68$26.25$2.00$7.60$2.30
16Mulch method 2 (25100115)ACRE0.75$3,517.50$5,000.00$4,300.00$6,750.00
17Erosion contr blanket (25100630)SY3,466$5.75$2.96$1.75$1.30
18Temp eros contr seed (28000250)LB128$6.55$2.00$4.55$7.50
19Perimeter eros bar (28000400)LF1,507$0.01$3.34$3.50$3.75
20Inlet filters (28000510)EACH18$400.00$484.75$320.00$575.00
21Agg base cse B 4 (35101600)SY398$11.00$8.45$13.15$16.00
22Agg base cse B 6 (35101800)SY2,060$13.65$11.57$15.00$14.50
23Aggregate-temp access (40201000)TON100$0.01$50.00$59.00$44.00
24PCC driveway pavt 6 (42300200)SY352$89.25$100.00$98.00$112.00
25PC conc sidewalk 4 (42400100)SF60$40.00$12.00$19.00$37.00
26Detectable warnings (42400800)SF136$69.00$40.00$55.50$58.00
27Drive pavement rem (44000200)SY353$17.50$12.55$17.15$32.00
28Comb curb gutter rem (44000500)LF157$25.50$6.73$11.30$47.00
29Sidewalk rem (44000600)SF2,820$2.15$1.79$1.90$2.25
30Temp soil reten systm (52200020)SF165$0.01$40.00$55.80$37.00
31Storm sew CL A 1 12 (550A0050)LF23$131.50$96.88$175.00$167.00
32Storm sewer rem 4 (55100100)LF19$53.45$69.08$32.60$77.00
33Storm sewer rem 12 (55100500)LF17$59.75$77.21$32.45$90.00
34Storm sewer rem 18 (55100900)LF14$72.50$93.75$32.75$99.00
35Pipe underdrain 4 SP (60108100)LF28$52.00$67.69$42.00$50.00
36Inlets TA T20F&G (60237420)EACH1$6,315.00$2,930.62$3,000.00$2,450.00
37Man adjust (60255500)EACH6$1,330.00$849.00$775.00$900.00
38Valve box adj (60266600)EACH3$388.50$150.00$2,500.00$480.00
39Remov inlets (60500060)EACH2$515.00$760.04$725.00$600.00
40Concrete gutter TY A (60602500)LF13$82.00$150.00$142.50$200.00
41Comb CC&G TY B-6.24 (60605000)LF157$76.00$75.00$66.45$91.00
42Non SPL waste disposl (66900200)CY867$51.15$60.00$92.25$200.00
43Soil disposal analy (66900530)EACH2$1,417.50$675.00$2,100.00$1,470.00
44Reg sub P-const plan (66901001)LS1$2,467.50$2,350.00$2,550.00$2,310.00
45Reg sub F con report (66901003)LS1$2,572.50$2,450.00$2,550.00$2,310.00
46Reg sub mon (66901006)CAL DAY4$1,044.75$995.00$1,435.00$1,300.00
47Mobilization (67100100)LS1$60,000$30,000$36,550$16,500
48TR cont & prot 701602 (70102632)LS1$17,000$20,000$11,875$7,750.00
49TR cont & prot 701801 (70102640)LS1$3,000.00$950.00$1,045.00$3,400.00
50Sign panel T1 (72000100)SF17.20$28.35$27.00$30.00$83.50
51Teles STL sin support (72800100)LF134$25.20$24.00$26.35$24.00
52Paint PVT MK line 4 (78001110)LF734$13.15$5.00$5.50$5.25
53Mod ureth PM line 4 (78009004)LF46$26.25$4.00$4.40$4.20
54Mod ureth PM line 24 (78009024)LF526$31.50$25.00$27.40$26.25
IDOT contract 97853: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of January 17, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy