RCS Construction, Inc.: IDOT bid record

RCS Construction, Inc. submitted 29 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 12 JUN 2026, and was the low bidder on 9 of them (31%). When it was not low, its total sat a median +11% above the low bid.

Owner
Illinois DOT
Low bid volume
$6,929,828
Latest bid
12 JUN 2026
Data through
18 SEP 2026
29Bids
9Low bids
31Win rate, percent
+11%Median gap to the low bid when not low, 20 bids

By year

YearBidsLow bidsWin rate
202114536%
20224250%
2023200%
20244125%
20253133%
2026200%
RCS Construction, Inc., IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 0823626%
District 065360%
District 09100%
RCS Construction, Inc., IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Trainees TPGZ0076604HR1313 (100%)$15.00$15.00
Temp eros contr seed28000250LB1211 (92%)$1.50$5.00
TraineesZ0076600HR1111 (100%)$0.80$0.80
Nitrogen fert nutr25000400LB139 (69%)$2.00$3.00
Potassium fert nutr25000600LB139 (69%)$2.00$3.00
Phosphorus fert nutr25000500LB139 (69%)$2.00$3.00
Drive pavement rem44000200SY138 (62%)$15.00$20.00
Detectable warnings42400800SF117 (64%)$40.00$37.00
Inlet & pipe protect28000500EACH136 (46%)$125.00$200.00
Perimeter eros bar28000400LF96 (67%)$3.50$3.50
Sidewalk rem44000600SF135 (38%)$3.45$3.00
PCC driveway pavt 642300200SY85 (63%)$93.75$100.00
RCS Construction, Inc., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

RCS Construction, Inc., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
12 JUN 202697896District 08Worden, section 24-00013-00-SW2 of 3$327,927+11%
27 FEB 202676U78District 08Section (X-3)PP3 of 4$1,117,643+24%
19 SEP 202597868District 08Granite City, section 22-00200-00-SW3 of 5$691,552+13%
19 SEP 202597874District 08Project Number: 2S5Z-990 / /, section 23-00008-00-PV1 of 5$2,566,151Low, 0.0% under the second
17 JAN 202597853District 08Edwardsville, section 21-00111-02-BT2 of 4$550,163+3.0%
20 SEP 202476R46District 09Section 132TS-12 of 3$2,041,227+4.0%
08 MAR 202497830District 08Highland, section 19-00061-01-PV1 of 4$1,549,285Low, 6.0% under the second
19 JAN 202476R91District 08Section 60-8WS-12 of 4$744,775+1.0%
19 JAN 202476T30District 06Section (53,54,55)PP4 of 5$249,844+32%
04 AUG 202376R47District 08Section 406N-12 of 2$181,064+27%
20 JAN 202376R71District 08Section (101,3 of 3$681,031+32%
17 JUN 202297763District 08America Central Port Dist, section 18-00003-00-PV2 of 5$3,340,623+1.0%
29 APR 202276P92District 08Section 201PP-11 of 2$90,961Low, 31% under the second
29 APR 202297774District 08Alton, section 17-00231-02-SW1 of 2$442,744Low, 0.0% under the second
11 MAR 202276P85District 08Section 102PP-14 of 5$448,697+83%
05 NOV 202176P84District 08Section (60Z,261,1)PP-12 of 2$353,379+3.0%
17 SEP 202197758District 08Bethalto, section 17-00032-00-BR2 of 3$1,421,146+8.0%
17 SEP 202197760District 08Bethalto, section 17-00022-01-WR6 of 6$1,667,150+21%
17 SEP 202197762District 08Edwardsville, section 18-00111-01-BT4 of 6$928,186+11%
17 SEP 202197764District 08Granite City, section 18-00197-01-RS1 of 4$769,306Low, 1.0% under the second
11 JUN 202172M84District 06Section 1261 of 1$341,990Low
11 JUN 202172M86District 06Section 1012 of 4$237,725+10%
11 JUN 202176L96District 08Section 101RS-LOT-12 of 2$2,539,249+12%
11 JUN 202176M36District 08Section 60-8PS-23 of 3$88,728+63%
11 JUN 202197754District 08East Alton, section 18-00052-00-PV2 of 2$1,138,562+2.0%
RCS Construction, Inc.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy