IDOT contract 46949 bid tabulation
Section ELDON. Let by Illinois DOT on July 31, 2026, Clinton, District 08. 4 bids received; low bid $2,907,718 by McCarthy Improvement Company.
- Owner
- Illinois DOT
- Letting
- 31 JUL 2026
- Pay items
- 58
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | McCarthy Improvement Company | $2,907,718 | Low |
| 2 | Baxmeyer Construction, Inc. | $3,144,338 | +8.0% |
| 3 | DMS Contracting, Inc. | $3,238,326 | +11% |
| 4 | Keller Construction, Inc. | $3,347,775 | +15% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. McCarthy Improvement Company | 2. Baxmeyer Construction, Inc. | 3. DMS Contracting, Inc. | 4. Keller Construction, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Rem EX parking blocks (X0301339) | EACH | 40 | $44.00 | $139.50 | $79.50 | $28.35 |
| 2 | Concrete pad (X0321309) | SY | 8 | $180.00 | $394.00 | $705.50 | $580.00 |
| 3 | Tie down anchor (X0321810) | EACH | 494 | $200.00 | $151.50 | $243.45 | $178.15 |
| 4 | Rem tie down anchor (X0321811) | EACH | 623 | $18.50 | $84.00 | $19.50 | $10.50 |
| 5 | PC conc sidewalk 4 SP (X4240420) | SF | 395 | $18.00 | $20.00 | $21.90 | $34.00 |
| 6 | Retaining wall SPL (X5220090) | SF | 22 | $542.00 | $552.50 | $1,850.00 | $800.00 |
| 7 | Pipe drains 4 SPL (X6011605) | LF | 50 | $85.00 | $98.00 | $112.00 | $53.80 |
| 8 | Fill EX storm sewers (X6050205) | CY | 8.50 | $865.00 | $706.50 | $660.00 | $406.35 |
| 9 | Traf cont & prot SPL (X7010216) | LS | 1 | $12,700 | $7,000.00 | $8,000.00 | $6,930.00 |
| 10 | Concrete steps (Z0012450) | CY | 1 | $8,200.00 | $4,090.00 | $4,530.00 | $5,250.00 |
| 11 | Construction layout (Z0013798) | LS | 1 | $21,300 | $35,400 | $20,225 | $10,000 |
| 12 | Paint curb (Z0036200) | LF | 3,844 | $2.25 | $5.25 | $5.50 | $2.10 |
| 13 | Trainees TPG (Z0076604) | HR | 1,000 | $15.00 | $15.00 | $15.00 | $15.00 |
| 14 | Trench backfill (20800150) | CY | 217 | $64.50 | $65.00 | $130.00 | $107.00 |
| 15 | Seeding CL 1A (25000110) | ACRE | 0.30 | $31,000 | $11,500 | $15,825 | $6,980.00 |
| 16 | Nitrogen fert nutr (25000400) | LB | 27 | $2.00 | $12.00 | $10.50 | $9.00 |
| 17 | Phosphorus fert nutr (25000500) | LB | 27 | $2.00 | $12.00 | $10.50 | $9.00 |
| 18 | Potassium fert nutr (25000600) | LB | 27 | $2.00 | $12.00 | $10.50 | $9.00 |
| 19 | Mulch method 2 (25100115) | ACRE | 0.30 | $19,000 | $5,450.00 | $6,925.00 | $9,680.00 |
| 20 | Perimeter eros bar (28000400) | LF | 1,353 | $8.50 | $8.50 | $6.75 | $4.65 |
| 21 | Agg base cse A (35100100) | TON | 50 | $33.00 | $85.75 | $86.00 | $70.25 |
| 22 | Bit matls PR CT (40600275) | LB | 3,442 | $3.25 | $1.05 | $1.10 | $1.05 |
| 23 | Bit matls tack CT (40600290) | LB | 1,721 | $3.25 | $1.05 | $1.10 | $1.05 |
| 24 | HMA BC IL-9.5FG N50 (40602965) | TON | 856 | $171.00 | $167.00 | $175.00 | $166.00 |
| 25 | HMA SC IL-9.5 C N50 (40604050) | TON | 856 | $171.00 | $167.00 | $175.00 | $166.00 |
| 26 | Welded wire reinf (42000060) | SY | 17,820 | $11.50 | $16.75 | $15.50 | $14.00 |
| 27 | PCC PVT 8 (42000300) | SY | 17,820 | $78.75 | $91.90 | $83.25 | $101.55 |
| 28 | Protective coat (42001300) | SY | 17,820 | $0.25 | $0.01 | $0.01 | $0.01 |
| 29 | Detectable warnings (42400800) | SF | 18 | $97.00 | $50.25 | $180.80 | $84.00 |
| 30 | Pavement rem (44000100) | SY | 17,814 | $8.00 | $8.15 | $7.35 | $8.66 |
| 31 | HMA surf rem 4 (44000165) | SY | 7,650 | $10.00 | $9.75 | $10.25 | $9.75 |
| 32 | Sidewalk rem (44000600) | SF | 188 | $2.50 | $4.50 | $19.00 | $8.92 |
| 33 | CL D patch T1 4 (44201690) | SY | 7 | $775.00 | $396.00 | $530.00 | $750.00 |
| 34 | JT CR RT PCC pav/SHLD (45200100) | LF | 1,400 | $11.00 | $6.00 | $4.70 | $5.05 |
| 35 | JT or crack filling (45200300) | LB | 399 | $6.50 | $13.75 | $10.80 | $6.65 |
| 36 | Pipe culvert remov (50105220) | LF | 79 | $18.00 | $25.00 | $46.00 | $14.70 |
| 37 | Pipe handrail (50901760) | LF | 35 | $200.00 | $0.01 | $1,375.00 | $0.01 |
| 38 | STR rep con DP = < 5 (53212754) | SF | 5 | $750.00 | $450.00 | $741.00 | $1,400.00 |
| 39 | P cul CL A 1 18 (542A0223) | LF | 55 | $162.00 | $91.00 | $138.50 | $102.50 |
| 40 | PRC flar end sec 18 (54213663) | EACH | 4 | $3,200.00 | $2,025.00 | $3,850.00 | $2,635.00 |
| 41 | Storm sew CL A 1 12 (550A0050) | LF | 343 | $124.00 | $68.00 | $86.25 | $68.25 |
| 42 | Storm sew CL A 1 18 (550A0090) | LF | 509 | $135.00 | $90.00 | $105.75 | $77.75 |
| 43 | Storm sewer rem 12 (55100500) | LF | 115 | $41.00 | $23.50 | $42.25 | $26.25 |
| 44 | Storm sewer rem 18 (55100900) | LF | 506 | $37.00 | $25.50 | $20.50 | $23.10 |
| 45 | CB TA 4 dia T1F OL (60200105) | EACH | 4 | $6,500.00 | $3,570.00 | $5,300.00 | $4,190.00 |
| 46 | Inlets TA T1F OL (60234200) | EACH | 4 | $4,300.00 | $2,515.00 | $2,650.00 | $3,530.00 |
| 47 | Remov inlets (60500060) | EACH | 4 | $1,100.00 | $540.00 | $850.00 | $1,050.00 |
| 48 | Fill inlets (60500305) | EACH | 4 | $2,200.00 | $1,570.00 | $1,550.00 | $815.00 |
| 49 | Mobilization (67100100) | LS | 1 | $173,001 | $161,828 | $301,250 | $299,300 |
| 50 | Sign panel T1 (72000100) | SF | 18 | $17.00 | $53.00 | $60.85 | $52.50 |
| 51 | Teles STL sin support (72800100) | LF | 108 | $9.00 | $25.65 | $29.60 | $25.50 |
| 52 | THPL PVT MK LTR & sym (78000100) | SF | 36 | $33.00 | $37.00 | $38.75 | $31.50 |
| 53 | THPL PVT MK line 4 (78000200) | LF | 3,221 | $4.25 | $3.35 | $3.50 | $4.20 |
| 54 | THPL PVT MK line 12 (78000600) | LF | 846 | $11.00 | $6.60 | $6.90 | $10.50 |
| 55 | Mod ureth PM LTR-sym (78009000) | SF | 780 | $25.00 | $39.00 | $40.95 | $24.15 |
| 56 | Mod ureth PM line 4 (78009004) | LF | 8,645 | $4.50 | $4.75 | $5.00 | $4.41 |
| 57 | Mod ureth PM line 6 (78009006) | LF | 192 | $7.50 | $5.25 | $5.50 | $7.35 |
| 58 | Mod ureth PM line 12 (78009012) | LF | 403 | $13.00 | $8.50 | $8.85 | $12.60 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of July 31, 2026. Compiled by Mirage Metrics.