IDOT contract 97843 bid tabulation
Glen Carbon, section 21-00031-00-RS. Let by Illinois DOT on January 17, 2025, Madison, District 08. 2 bids received; low bid $949,494 by Keller Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 17 JAN 2025
- Pay items
- 62
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Keller Construction, Inc. | $949,494 | Low |
| 2 | Christ Bros. Asphalt, Inc. | $990,345 | +4.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Keller Construction, Inc. | 2. Christ Bros. Asphalt, Inc. |
|---|---|---|---|---|---|
| 1 | Landscaping, special (X0327618) | LS | 1 | $19,268 | $25,000 |
| 2 | Potholing (X1700066) | EACH | 15 | $785.00 | $1,418.00 |
| 3 | Traf cont & prot SPL (X7010216) | LS | 1 | $47,000 | $59,275 |
| 4 | Relocate sign SPL (X7240502) | EACH | 1 | $1,606.50 | $5,000.00 |
| 5 | Handhole to BE adjust (X8140115) | EACH | 3 | $0.01 | $2,500.00 |
| 6 | Rel EX LP W/luminaire (X8440110) | EACH | 1 | $0.01 | $2,000.00 |
| 7 | Det loop repl (X8860105) | LF | 362 | $8.40 | $8.00 |
| 8 | Construction layout (Z0013798) | LS | 1 | $10,000 | $27,000 |
| 9 | Tree remov 6-15 (20100110) | UNIT | 52 | $137.50 | $85.00 |
| 10 | Tree remov over 15 (20100210) | UNIT | 136 | $123.70 | $85.00 |
| 11 | Earth excavation (20200100) | CY | 1,155 | $54.32 | $61.66 |
| 12 | Rem & disp uns matl (20201200) | CY | 50 | $29.80 | $107.87 |
| 13 | Seeding CL 1A (25000110) | ACRE | 0.25 | $20,658 | $10,000 |
| 14 | Nitrogen fert nutr (25000400) | LB | 25 | $68.25 | $10.00 |
| 15 | Phosphorus fert nutr (25000500) | LB | 25 | $68.25 | $10.00 |
| 16 | Potassium fert nutr (25000600) | LB | 25 | $68.25 | $10.00 |
| 17 | Mulch method 2 (25100115) | ACRE | 0.25 | $33,050 | $10,000 |
| 18 | Temp eros contr seed (28000250) | LB | 50 | $8.24 | $10.00 |
| 19 | Perimeter eros bar (28000400) | LF | 140 | $10.30 | $15.00 |
| 20 | Inlet & pipe protect (28000500) | EACH | 3 | $170.19 | $200.00 |
| 21 | Sub gran mat A (31100100) | TON | 1,296 | $41.90 | $63.63 |
| 22 | Agg base cse A (35100100) | TON | 389 | $49.10 | $63.63 |
| 23 | Bit matls PR CT (40600275) | LB | 4,999 | $1.85 | $1.77 |
| 24 | Bit matls tack CT (40600290) | LB | 2,490 | $4.40 | $3.19 |
| 25 | Long joint sealant (40600370) | LF | 1,350 | $10.05 | $6.57 |
| 26 | HMA BC IL-19.0 N70 (40603085) | TON | 871 | $156.75 | $149.28 |
| 27 | HMA SC IL-9.5 C N70 (40604052) | TON | 433 | $156.75 | $149.28 |
| 28 | PCC PVT 8 jointed (42000301) | SY | 250 | $208.80 | $100.00 |
| 29 | PCC driveway pavt 8 (42300400) | SY | 190 | $141.35 | $200.00 |
| 30 | PC conc sidewalk 4 (42400100) | SF | 12,638 | $8.25 | $10.00 |
| 31 | Detectable warnings (42400800) | SF | 168 | $63.00 | $75.00 |
| 32 | Pavement rem (44000100) | SY | 2,469 | $16.05 | $12.63 |
| 33 | HMA surf rem 1 3/4 (44000156) | SY | 2,201 | $15.85 | $15.09 |
| 34 | Drive pavement rem (44000200) | SY | 187 | $39.80 | $25.00 |
| 35 | Curb rem (44000300) | LF | 9 | $65.80 | $15.00 |
| 36 | Comb curb gutter rem (44000500) | LF | 214 | $19.05 | $15.00 |
| 37 | Water valves adjust (56109210) | EACH | 4 | $680.00 | $200.00 |
| 38 | Comb CC&G TM6.12 (60609200) | LF | 142 | $96.25 | $50.00 |
| 39 | Comb CC&G TM6.18 (60609800) | LF | 46 | $83.85 | $75.00 |
| 40 | Comb CC&G TM6.24 (60610400) | LF | 27 | $130.00 | $100.00 |
| 41 | Non SPL waste disposl (66900200) | CY | 100 | $81.50 | $196.82 |
| 42 | Soil disposal analy (66900530) | EACH | 1 | $1,890.00 | $1,400.00 |
| 43 | Reg sub P-const plan (66901001) | LS | 1 | $2,310.00 | $2,200.00 |
| 44 | Reg sub F con report (66901003) | LS | 1 | $2,310.00 | $2,200.00 |
| 45 | Reg sub mon (66901006) | CAL DAY | 2 | $1,249.50 | $1,260.00 |
| 46 | Mobilization (67100100) | LS | 1 | $96,000 | $78,823 |
| 47 | Sign panel T1 (72000100) | SF | 13 | $38.85 | $100.00 |
| 48 | Reloc sin pan assy TA (72400500) | EACH | 5 | $783.30 | $200.00 |
| 49 | Teles STL sin support (72800100) | LF | 32 | $18.90 | $25.00 |
| 50 | PT PVT MK LTRS & symb (78001100) | SF | 146 | $5.10 | $4.73 |
| 51 | Paint PVT MK line 4 (78001110) | LF | 4,036 | $0.51 | $0.49 |
| 52 | Paint PVT MK line 24 (78001180) | LF | 485 | $3.86 | $3.59 |
| 53 | Locate undergr cable (80300100) | LF | 273 | $5.25 | $5.00 |
| 54 | Undrgrd C PVC 2 (81028350) | LF | 5 | $472.50 | $450.00 |
| 55 | Elcbl C signal 14 5C (87301245) | LF | 59 | $2.10 | $2.00 |
| 56 | Elcbl C lead 14 1PR (87301305) | LF | 100 | $1.58 | $1.50 |
| 57 | Elcbl C egrdc 6 1C (87301900) | LF | 24 | $2.63 | $2.50 |
| 58 | Conc FDN TY A (87800100) | LF | 3 | $735.00 | $700.00 |
| 59 | Drill EX handhole (87900200) | EACH | 1 | $393.75 | $375.00 |
| 60 | Reloc EX TS equip (89501250) | EACH | 1 | $1,706.25 | $1,625.00 |
| 61 | Rem elcbl FR con (89502300) | LF | 100 | $0.01 | $0.01 |
| 62 | Remov EX conc FDN (89502385) | EACH | 1 | $525.00 | $500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 17, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.