IDOT contract 97843 bid tabulation

Glen Carbon, section 21-00031-00-RS. Let by Illinois DOT on January 17, 2025, Madison, District 08. 2 bids received; low bid $949,494 by Keller Construction, Inc..

Owner
Illinois DOT
Letting
17 JAN 2025
Pay items
62
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Keller Construction, Inc.$949,494Low
2Christ Bros. Asphalt, Inc.$990,345+4.0%
IDOT contract 97843: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Keller Construction, Inc.2. Christ Bros. Asphalt, Inc.
1Landscaping, special (X0327618)LS1$19,268$25,000
2Potholing (X1700066)EACH15$785.00$1,418.00
3Traf cont & prot SPL (X7010216)LS1$47,000$59,275
4Relocate sign SPL (X7240502)EACH1$1,606.50$5,000.00
5Handhole to BE adjust (X8140115)EACH3$0.01$2,500.00
6Rel EX LP W/luminaire (X8440110)EACH1$0.01$2,000.00
7Det loop repl (X8860105)LF362$8.40$8.00
8Construction layout (Z0013798)LS1$10,000$27,000
9Tree remov 6-15 (20100110)UNIT52$137.50$85.00
10Tree remov over 15 (20100210)UNIT136$123.70$85.00
11Earth excavation (20200100)CY1,155$54.32$61.66
12Rem & disp uns matl (20201200)CY50$29.80$107.87
13Seeding CL 1A (25000110)ACRE0.25$20,658$10,000
14Nitrogen fert nutr (25000400)LB25$68.25$10.00
15Phosphorus fert nutr (25000500)LB25$68.25$10.00
16Potassium fert nutr (25000600)LB25$68.25$10.00
17Mulch method 2 (25100115)ACRE0.25$33,050$10,000
18Temp eros contr seed (28000250)LB50$8.24$10.00
19Perimeter eros bar (28000400)LF140$10.30$15.00
20Inlet & pipe protect (28000500)EACH3$170.19$200.00
21Sub gran mat A (31100100)TON1,296$41.90$63.63
22Agg base cse A (35100100)TON389$49.10$63.63
23Bit matls PR CT (40600275)LB4,999$1.85$1.77
24Bit matls tack CT (40600290)LB2,490$4.40$3.19
25Long joint sealant (40600370)LF1,350$10.05$6.57
26HMA BC IL-19.0 N70 (40603085)TON871$156.75$149.28
27HMA SC IL-9.5 C N70 (40604052)TON433$156.75$149.28
28PCC PVT 8 jointed (42000301)SY250$208.80$100.00
29PCC driveway pavt 8 (42300400)SY190$141.35$200.00
30PC conc sidewalk 4 (42400100)SF12,638$8.25$10.00
31Detectable warnings (42400800)SF168$63.00$75.00
32Pavement rem (44000100)SY2,469$16.05$12.63
33HMA surf rem 1 3/4 (44000156)SY2,201$15.85$15.09
34Drive pavement rem (44000200)SY187$39.80$25.00
35Curb rem (44000300)LF9$65.80$15.00
36Comb curb gutter rem (44000500)LF214$19.05$15.00
37Water valves adjust (56109210)EACH4$680.00$200.00
38Comb CC&G TM6.12 (60609200)LF142$96.25$50.00
39Comb CC&G TM6.18 (60609800)LF46$83.85$75.00
40Comb CC&G TM6.24 (60610400)LF27$130.00$100.00
41Non SPL waste disposl (66900200)CY100$81.50$196.82
42Soil disposal analy (66900530)EACH1$1,890.00$1,400.00
43Reg sub P-const plan (66901001)LS1$2,310.00$2,200.00
44Reg sub F con report (66901003)LS1$2,310.00$2,200.00
45Reg sub mon (66901006)CAL DAY2$1,249.50$1,260.00
46Mobilization (67100100)LS1$96,000$78,823
47Sign panel T1 (72000100)SF13$38.85$100.00
48Reloc sin pan assy TA (72400500)EACH5$783.30$200.00
49Teles STL sin support (72800100)LF32$18.90$25.00
50PT PVT MK LTRS & symb (78001100)SF146$5.10$4.73
51Paint PVT MK line 4 (78001110)LF4,036$0.51$0.49
52Paint PVT MK line 24 (78001180)LF485$3.86$3.59
53Locate undergr cable (80300100)LF273$5.25$5.00
54Undrgrd C PVC 2 (81028350)LF5$472.50$450.00
55Elcbl C signal 14 5C (87301245)LF59$2.10$2.00
56Elcbl C lead 14 1PR (87301305)LF100$1.58$1.50
57Elcbl C egrdc 6 1C (87301900)LF24$2.63$2.50
58Conc FDN TY A (87800100)LF3$735.00$700.00
59Drill EX handhole (87900200)EACH1$393.75$375.00
60Reloc EX TS equip (89501250)EACH1$1,706.25$1,625.00
61Rem elcbl FR con (89502300)LF100$0.01$0.01
62Remov EX conc FDN (89502385)EACH1$525.00$500.00
IDOT contract 97843: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of January 17, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy