IDOT contract 97865 bid tabulation
Millstadt, section 21-00014-00-SW. Let by Illinois DOT on April 24, 2026, St. Clair, District 08. 2 bids received; low bid $833,138 by Baxmeyer Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 24 APR 2026
- Pay items
- 56
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Baxmeyer Construction, Inc. | $833,138 | Low |
| 2 | DMS Contracting, Inc. | $1,071,849 | +29% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Baxmeyer Construction, Inc. | 2. DMS Contracting, Inc. |
|---|---|---|---|---|---|
| 1 | Solar-power FB as CMP (X0326899) | EACH | 2 | $10,500 | $11,000 |
| 2 | Potholing (X1700066) | EACH | 30 | $750.00 | $453.00 |
| 3 | Clearing & grubbing (X2010510) | LS | 1 | $6,325.00 | $12,500 |
| 4 | Storm sewer removal (X5510100) | LF | 210 | $28.00 | $135.00 |
| 5 | Inlets SPL N1 (X6024242) | EACH | 7 | $3,500.00 | $5,200.00 |
| 6 | Inlets SPL N2 (X6024244) | EACH | 12 | $2,900.00 | $4,585.00 |
| 7 | Fence (special) (X6640102) | LF | 52 | $143.00 | $150.00 |
| 8 | CH LK fence reloc (X6640306) | LF | 8 | $286.00 | $301.00 |
| 9 | Traf cont & prot SPL (X7010216) | LS | 1 | $9,800.00 | $28,500 |
| 10 | Construction layout (Z0013798) | LS | 1 | $12,620 | $11,000 |
| 11 | Earth excavation (20200100) | CY | 212 | $257.00 | $138.00 |
| 12 | Furnished excavation (20400800) | CY | 28 | $51.00 | $162.00 |
| 13 | Seeding CL 2A (25000210) | ACRE | 0.25 | $16,000 | $12,175 |
| 14 | Nitrogen fert nutr (25000400) | LB | 20 | $18.00 | $20.00 |
| 15 | Phosphorus fert nutr (25000500) | LB | 20 | $18.00 | $20.00 |
| 16 | Potassium fert nutr (25000600) | LB | 20 | $18.00 | $20.00 |
| 17 | Mulch method 2 (25100115) | ACRE | 0.25 | $13,550 | $14,500 |
| 18 | Temp eros contr seed (28000250) | LB | 50 | $9.50 | $18.50 |
| 19 | Perimeter eros bar (28000400) | LF | 580 | $8.50 | $9.00 |
| 20 | Inlet & pipe protect (28000500) | EACH | 35 | $316.00 | $280.00 |
| 21 | Agg base cse A (35100100) | TON | 329 | $86.00 | $77.60 |
| 22 | PCC base cse W 9 (35400400) | SY | 296 | $104.00 | $136.25 |
| 23 | Bit matls PR CT (40600275) | LB | 10 | $58.00 | $400.00 |
| 24 | Incidental HMA surf (40800050) | TON | 2 | $1,040.00 | $1,525.00 |
| 25 | PCC driveway pavt 6 (42300200) | SY | 204 | $160.00 | $207.00 |
| 26 | PCC driveway pavt 8 (42300400) | SY | 66 | $172.00 | $217.00 |
| 27 | PC conc sidewalk 4 (42400100) | SF | 12,377 | $7.80 | $9.95 |
| 28 | Detectable warnings (42400800) | SF | 276 | $40.00 | $116.00 |
| 29 | Pavement rem (44000100) | SY | 702 | $32.00 | $30.50 |
| 30 | Comb curb gutter rem (44000500) | LF | 347 | $12.00 | $29.40 |
| 31 | Sidewalk rem (44000600) | SF | 661 | $2.50 | $8.50 |
| 32 | CL D patch T2 8 (44201741) | SY | 13 | $355.00 | $433.00 |
| 33 | Pipe culvert remov (50105220) | LF | 169 | $26.00 | $67.50 |
| 34 | P cul CL D 1 12 (542D0217) | LF | 20 | $164.00 | $273.00 |
| 35 | PRC flar end sec 18 (54213663) | EACH | 1 | $1,700.00 | $3,650.00 |
| 36 | PRC flar end sec 21 (54213666) | EACH | 1 | $1,830.00 | $3,800.00 |
| 37 | Storm sew CL A 1 12 (550A0050) | LF | 682 | $67.00 | $144.00 |
| 38 | Storm sew CL A 1 15 (550A0070) | LF | 134 | $75.00 | $115.00 |
| 39 | Storm sew CL A 1 18 (550A0090) | LF | 381 | $79.00 | $147.00 |
| 40 | Storm sew CL A 1 21 (550A0110) | LF | 55 | $159.00 | $130.00 |
| 41 | Man TA 4 dia T24F&G (60219540) | EACH | 1 | $3,282.00 | $6,580.00 |
| 42 | Inlets TA T8G (60236200) | EACH | 6 | $1,864.00 | $3,550.00 |
| 43 | Inlets TB T24F&G (60240328) | EACH | 1 | $2,350.00 | $4,300.00 |
| 44 | Remov inlets (60500060) | EACH | 7 | $529.00 | $1,350.00 |
| 45 | Comb CC&G TB6.18 (60604400) | LF | 247 | $135.00 | $92.50 |
| 46 | Comb CC&G TY B-6.24 (60605000) | LF | 2,179 | $70.00 | $57.40 |
| 47 | Non SPL waste disposl (66900200) | CY | 33 | $156.00 | $265.00 |
| 48 | Soil disposal analy (66900530) | EACH | 1 | $1,270.00 | $1,535.00 |
| 49 | Reg sub P-const plan (66901001) | LS | 1 | $3,180.00 | $2,330.00 |
| 50 | Reg sub F con report (66901003) | LS | 1 | $1,060.00 | $2,330.00 |
| 51 | Reg sub mon (66901006) | CAL DAY | 1 | $1,430.00 | $1,240.00 |
| 52 | Mobilization (67100100) | LS | 1 | $24,037 | $50,000 |
| 53 | Sign panel T1 (72000100) | SF | 27 | $60.00 | $35.00 |
| 54 | Rem & rel sign panel asmbly TA (72400205) | EACH | 2 | $214.00 | $1,450.00 |
| 55 | Teles STL sin support (72800100) | LF | 64 | $25.00 | $20.00 |
| 56 | Paint PVT MK line 24 (78001180) | LF | 517 | $13.50 | $14.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 24, 2026. Compiled by Mirage Metrics.