IDOT contract 97863 bid tabulation

Mascoutah, section 21-00028-00-BT. Let by Illinois DOT on August 1, 2025, St. Clair, District 08. 2 bids received; low bid $1,251,808 by Baxmeyer Construction, Inc..

Owner
Illinois DOT
Letting
01 AUG 2025
Pay items
67
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Baxmeyer Construction, Inc.$1,251,808Low
2DMS Contracting, Inc.$1,458,183+16%
IDOT contract 97863: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Baxmeyer Construction, Inc.2. DMS Contracting, Inc.
1Ballast removal (XX009715)CY27$90.00$100.00
2Bioretension system (XX009716)SF1,194$28.00$27.00
3FL beacon P MTD SP in (X0325714)EACH2$9,150.00$26,437
4Fold down bollards (X0350805)EACH5$2,010.00$8,620.00
5Remov EX flar end sec (X5427602)EACH2$195.00$670.00
6SS cleaned 18 (X5538000)LF35$190.00$75.00
7Inlets SPL (X6024240)EACH1$2,800.00$3,200.00
8WD post & rail fence (X6640628)LF162$65.00$485.00
9Traf cont & prot SPL (X7010216)LS1$8,000.00$30,000
10Bollards (Z0004002)EACH10$950.00$2,000.00
11Construction layout (Z0013798)LS1$24,000$51,000
12Trainees (Z0076600)HR500$0.80$0.80
13Trainees TPG (Z0076604)HR500$15.00$15.00
14Tree remov acres (20100500)ACRE3$5,035.00$19,000
15Earth excavation (20200100)CY1,920$35.50$25.00
16Trench backfill (20800150)CY55$42.50$34.00
17Topsoil F & P 4 (21101615)SY7,649$14.50$12.00
18Seeding CL 1B (25000115)ACRE2$6,000.00$4,500.00
19Nitrogen fert nutr (25000400)LB143$6.50$3.00
20Phosphorus fert nutr (25000500)LB143$6.50$3.00
21Potassium fert nutr (25000600)LB143$6.50$3.00
22Mulch method 2 (25100115)ACRE2$3,700.00$5,000.00
23Erosion contr blanket (25100630)SY1,113$3.50$4.00
24Temp eros contr seed (28000250)LB158$10.50$12.00
25Temp ditch checks (28000305)LF168$37.50$15.00
26Perimeter eros bar (28000400)LF11,145$7.65$4.00
27Inlet & pipe protect (28000500)EACH6$455.00$450.00
28Stone riprap CL A3 (28100105)SY34$59.00$55.00
29Filter fabric (28200200)SY25$10.75$30.00
30Process mod soil 12 (30200650)SY7,339$3.60$0.01
31Lime (30201500)TON198$189.00$0.01
32Agg base cse A 6 (35100500)SY7,346$15.00$13.50
33Agg surf cse A 4 (40200300)SY72$22.50$25.00
34Bit matls PR CT (40600275)LB14,157$1.30$1.06
35HMA SC IL-9.5FG C N50 (40604000)TON1,061$183.50$196.69
36HMA SC IL-9.5 C N70 (40604052)TON9$1,775.00$634.49
37PCC PVT 8 jointed (42000301)SY660$104.00$115.00
38PCC driveway pavt 6 (42300200)SY36$249.00$200.00
39PC conc sidewalk 5 (42400200)SF2,124$15.25$12.50
40Detectable warnings (42400800)SF212$35.00$70.00
41Pavement rem (44000100)SY214$61.00$35.00
42Curb rem (44000300)LF303$17.00$27.00
43Sidewalk rem (44000600)SF14$76.00$60.00
44Bridge rail removal (50104000)LF148$12.15$30.00
45Pipe culvert remov (50105220)LF47$34.50$100.00
46Bicycle railing (50901720)LF148$240.50$672.63
47PRC flar end sec 12 (54213657)EACH2$1,175.00$2,320.00
48PRC flar end sec 18 (54213663)EACH1$1,550.00$2,820.00
49Storm sew CL A 1 12 (550A0050)LF107$59.00$130.00
50Storm sew CL A 1 18 (550A0090)LF82$72.00$135.00
51Man TA 4 dia T1F OL (60218300)EACH1$2,825.00$4,300.00
52Conc curb TB (60600605)LF561$55.00$34.00
53Comb CC&G TB6.18 (60604400)LF57$175.00$80.00
54Comb CC&G TB6.24 aep (60605100)LF359$111.00$80.00
55SPBGR TY A 6FT posts (63000001)LF13$130.50$331.92
56Non SPL waste disposl (66900200)CY75$118.50$222.66
57Soil disposal analy (66900530)EACH2$1,715.00$1,533.36
58Reg sub P-const plan (66901001)LS1$2,325.00$2,326.47
59Reg sub F con report (66901003)LS1$2,325.00$2,326.47
60Reg sub mon (66901006)CAL DAY5$1,260.00$1,258.41
61Mobilization (67100100)LS1$64,002$90,000
62Sign panel T1 (72000100)SF154$31.75$53.00
63Teles STL sin support (72800100)LF100$24.00$65.00
64Wood sin support (73000100)LF200$41.50$70.00
65Paint PVT MK line 4 (78001110)LF5,342$1.50$4.75
66Paint PVT MK line 12 (78001150)LF40$26.50$26.50
67Paint PVT MK line 24 (78001180)LF105$31.75$53.00
IDOT contract 97863: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of August 1, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy