IDOT contract 78813 bid tabulation
. Let by Illinois DOT on November 7, 2025, Perry, District 09. 3 bids received; low bid $2,731,937 by Samron Midwest Contracting, Inc..
- Owner
- Illinois DOT
- Letting
- 07 NOV 2025
- Pay items
- 121
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Samron Midwest Contracting, Inc. | $2,731,937 | Low |
| 2 | E. T. Simonds Construction Company | $3,045,603 | +11% |
| 3 | Sierra Bravo Contractors, LLC | $3,110,394 | +14% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Samron Midwest Contracting, Inc. | 2. E. T. Simonds Construction Company | 3. Sierra Bravo Contractors, LLC |
|---|---|---|---|---|---|---|
| 1 | Mowing (X2503100) | UNIT | 88 | $80.00 | $39.80 | $44.04 |
| 2 | STR refl CR CTRL TRTMT (X4430200) | LF | 17,454 | $1.00 | $0.95 | $1.00 |
| 3 | Box culvert removal (X5400005) | LF | 6 | $500.00 | $867.47 | $798.61 |
| 4 | Memb WTRPRF sys B STR (X5810103) | SY | 220 | $8.00 | $42.12 | $38.78 |
| 5 | Traf cont-prot BLR 21 (X7011800) | LS | 1 | $8,000.00 | $16,373 | $12,968 |
| 6 | Detour signing (X7200203) | LS | 1 | $13,000 | $31,983 | $9,870.00 |
| 7 | Rem RE-erect EX sign (X7240600) | EACH | 2 | $29,000 | $33,626 | $44,034 |
| 8 | Construction layout (Z0013798) | LS | 1 | $21,500 | $47,405 | $34,860 |
| 9 | Rock fill - foundatn (Z0054517) | TON | 210 | $35.00 | $46.57 | $42.87 |
| 10 | Trainees (Z0076600) | HR | 500 | $0.80 | $0.80 | $0.80 |
| 11 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 | $15.00 |
| 12 | Tree remov 6-15 (20100110) | UNIT | 72 | $48.00 | $51.55 | $47.45 |
| 13 | Tree remov over 15 (20100210) | UNIT | 390 | $48.00 | $60.70 | $55.89 |
| 14 | Earth excavation (20200100) | CY | 16,304 | $18.00 | $12.97 | $11.43 |
| 15 | Porous gran embank (20700220) | CY | 459 | $47.00 | $81.58 | $75.11 |
| 16 | Porous gran backfill (20900110) | CY | 58 | $58.00 | $84.04 | $77.37 |
| 17 | Seeding CL 1 (25000100) | ACRE | 14.50 | $2,500.00 | $1,983.76 | $1,942.50 |
| 18 | Seeding CL 7 (25000350) | ACRE | 14.50 | $500.00 | $482.54 | $472.50 |
| 19 | Nitrogen fert nutr (25000400) | LB | 1,305 | $2.00 | $1.77 | $1.73 |
| 20 | Phosphorus fert nutr (25000500) | LB | 1,305 | $2.00 | $1.77 | $1.73 |
| 21 | Potassium fert nutr (25000600) | LB | 1,305 | $2.00 | $1.77 | $1.73 |
| 22 | Agr ground limestone (25000700) | TON | 29 | $135.00 | $134.04 | $131.25 |
| 23 | Mulch method 2 (25100115) | ACRE | 14.50 | $1,500.00 | $1,474.41 | $1,443.75 |
| 24 | Erosion contr blanket (25100630) | SY | 16,167 | $1.50 | $2.04 | $2.00 |
| 25 | Temp eros contr seed (28000250) | LB | 1,450 | $1.60 | $3.03 | $2.79 |
| 26 | Temp ditch checks (28000305) | LF | 630 | $10.00 | $17.43 | $16.04 |
| 27 | Perimeter eros bar (28000400) | LF | 3,339 | $3.00 | $5.12 | $4.72 |
| 28 | Inlet & pipe protect (28000500) | EACH | 43 | $100.00 | $189.59 | $174.54 |
| 29 | Stone riprap CL A4 (28100107) | SY | 37 | $60.00 | $64.61 | $59.48 |
| 30 | Stone dump rip CL A4 (28100707) | SY | 48 | $70.00 | $56.50 | $52.02 |
| 31 | Filter fabric (28200200) | SY | 85 | $5.00 | $2.64 | $2.44 |
| 32 | Agg base cse A (35100100) | TON | 492 | $27.00 | $39.40 | $36.28 |
| 33 | Agg surf cse A (40200100) | TON | 982 | $27.00 | $42.35 | $38.99 |
| 34 | Aggregate-temp access (40201000) | TON | 250 | $78.00 | $62.76 | $57.78 |
| 35 | Bit matls PR CT (40600275) | LB | 310 | $0.01 | $0.01 | $0.01 |
| 36 | Bit matls tack CT (40600290) | LB | 22,446 | $0.01 | $0.01 | $0.01 |
| 37 | Long joint sealant (40600370) | LF | 9,364 | $3.50 | $3.45 | $3.62 |
| 38 | Matl transfer device (40600405) | TON | 4,388 | $2.20 | $3.89 | $4.08 |
| 39 | HMA surf rem butt JT (40600982) | SY | 173 | $15.00 | $25.46 | $26.73 |
| 40 | Temporary ramp (40600990) | SY | 136 | $10.00 | $27.71 | $29.10 |
| 41 | HMA BC IL-9.5FG N70 (40602970) | TON | 1,753 | $86.00 | $89.88 | $94.37 |
| 42 | HMA BC IL-19.0 N70 (40603085) | TON | 330 | $102.00 | $84.00 | $88.20 |
| 43 | HMA SC IL-9.5 C N70 (40604052) | TON | 2,305 | $90.00 | $85.93 | $90.23 |
| 44 | Incidental HMA surf (40800050) | TON | 191 | $250.00 | $182.98 | $192.13 |
| 45 | PCC driveway pavt 6 (42300200) | SY | 249 | $98.00 | $113.95 | $134.57 |
| 46 | HMA surf rem 1 1/2 (44000155) | SY | 24,702 | $1.75 | $1.44 | $1.51 |
| 47 | Drive pavement rem (44000200) | SY | 151 | $12.00 | $17.23 | $15.87 |
| 48 | Paved SHLD removal (44004250) | SY | 488 | $15.00 | $14.99 | $15.74 |
| 49 | Welded wire reinf (44200050) | SY | 532 | $15.00 | $15.67 | $14.43 |
| 50 | CL C patch T1 12 (44201373) | SY | 5 | $175.00 | $350.00 | $539.90 |
| 51 | CL C patch T2 12 (44201377) | SY | 26 | $170.00 | $345.00 | $378.35 |
| 52 | CL C patch T3 12 (44201381) | SY | 85 | $165.00 | $341.16 | $304.12 |
| 53 | CL C patch T4 12 (44201383) | SY | 637 | $160.00 | $294.71 | $284.78 |
| 54 | Tie bars 3/4 (44213204) | EACH | 109 | $20.00 | $59.70 | $20.72 |
| 55 | Aggregate SHLDS A (48100100) | TON | 115 | $31.00 | $32.26 | $33.87 |
| 56 | Aggregate SHLDS A 8 (48100700) | SY | 5,818 | $20.00 | $13.60 | $14.28 |
| 57 | HMA shoulders 8 (48203029) | SY | 9,697 | $39.00 | $40.80 | $42.84 |
| 58 | Rem exist struct N1 (50100300) | EACH | 1 | $8,000.00 | $7,803.35 | $7,184.02 |
| 59 | Rem exist struct N2 (50100400) | EACH | 1 | $9,000.00 | $12,485 | $11,494 |
| 60 | Pipe culvert remov (50105220) | LF | 1,460 | $9.00 | $15.43 | $14.21 |
| 61 | Structure excavation (50200100) | CY | 354 | $21.00 | $44.08 | $40.59 |
| 62 | Rem/disp uns matl-STR (50200450) | CY | 179 | $22.00 | $51.09 | $47.04 |
| 63 | Reinforcement bars (50800105) | LB | 4,980 | $2.00 | $2.63 | $1.83 |
| 64 | Box cul end sec C1 (54001001) | EACH | 2 | $14,000 | $18,805 | $17,312 |
| 65 | Box cul end sec C2 (54001002) | EACH | 2 | $14,000 | $24,319 | $22,388 |
| 66 | Box cul end sec C3 (54001003) | EACH | 2 | $14,000 | $18,591 | $17,115 |
| 67 | Conc box cul (54003000) | CY | 24.90 | $1,800.00 | $2,250.62 | $1,862.38 |
| 68 | PCBC 4X2 (54010402) | LF | 64 | $800.00 | $780.57 | $718.62 |
| 69 | PCBC 4X3 (54010403) | LF | 80 | $700.00 | $695.46 | $640.26 |
| 70 | PCBC 10X4 (54011004) | LF | 54 | $1,000.00 | $1,343.71 | $1,237.07 |
| 71 | P cul CL A 1 18 (542A0223) | LF | 81 | $80.00 | $105.05 | $96.72 |
| 72 | P cul CL A 1 24 (542A0229) | LF | 98 | $95.00 | $116.35 | $107.11 |
| 73 | P cul CL A 1 30 (542A0235) | LF | 63 | $115.00 | $164.57 | $151.51 |
| 74 | P cul CL A 1 eqrs 21 (542A5476) | LF | 89 | $154.00 | $210.37 | $193.67 |
| 75 | P cul CL D 1 15 (542D0220) | LF | 571 | $41.00 | $78.82 | $72.56 |
| 76 | P cul CL D 1 18 (542D0223) | LF | 656 | $43.00 | $78.84 | $72.58 |
| 77 | P cul CL D 1 24 (542D0229) | LF | 335 | $51.00 | $91.60 | $84.33 |
| 78 | P cul CL D 1 eqrs 24 (542D5479) | LF | 88 | $96.00 | $117.29 | $107.99 |
| 79 | End sections 15 (54213450) | EACH | 27 | $200.00 | $496.99 | $457.55 |
| 80 | End sections 18 (54213453) | EACH | 32 | $215.00 | $507.00 | $466.76 |
| 81 | End sections 24 (54213459) | EACH | 14 | $400.00 | $975.65 | $898.22 |
| 82 | PRC flar end sec 18 (54213663) | EACH | 2 | $2,800.00 | $1,805.41 | $1,662.11 |
| 83 | PRC flar end sec 24 (54213669) | EACH | 4 | $3,150.00 | $2,156.62 | $1,985.46 |
| 84 | PRC flar end sec 30 (54213675) | EACH | 2 | $3,500.00 | $2,521.70 | $2,321.56 |
| 85 | End sec eqv R-S 24 (54214299) | EACH | 4 | $710.00 | $1,148.04 | $1,056.92 |
| 86 | PRC FL end S EQ RS 21 (54214506) | EACH | 4 | $3,200.00 | $2,016.72 | $1,856.65 |
| 87 | FL inlt BX med 542546 (54244405) | EACH | 1 | $4,800.00 | $4,975.89 | $4,580.97 |
| 88 | Geocomposite wall DR (59100100) | SY | 220 | $8.00 | $23.76 | $21.88 |
| 89 | Inlets TA T8G (60236200) | EACH | 1 | $2,800.00 | $2,970.00 | $2,734.28 |
| 90 | Shoulder rum strip 8 (64200108) | LF | 17,454 | $0.38 | $0.36 | $0.36 |
| 91 | Fur erect row markers (66600105) | EACH | 22 | $222.00 | $446.14 | $241.43 |
| 92 | Perm surv MKRS T2 (66700305) | EACH | 5 | $450.00 | $575.00 | $927.74 |
| 93 | Non SPL waste disposl (66900200) | CY | 355 | $55.00 | $81.56 | $75.09 |
| 94 | Soil disposal analy (66900530) | EACH | 3 | $1,350.00 | $1,528.03 | $1,260.00 |
| 95 | Reg sub P-const plan (66901001) | LS | 1 | $3,400.00 | $2,573.52 | $4,200.00 |
| 96 | Reg sub mon (66901006) | CAL DAY | 6 | $1,150.00 | $1,340.38 | $1,050.00 |
| 97 | Engr field office A (67000400) | CAL MO | 12 | $1,700.00 | $2,200.00 | $2,897.39 |
| 98 | Mobilization (67100100) | LS | 1 | $160,000 | $109,400 | $186,397 |
| 99 | Traf cont-prot 701316 (70100100) | EACH | 1 | $18,000 | $13,397 | $14,931 |
| 100 | Traf cont-prot 701201 (70100450) | LS | 1 | $9,300.00 | $0.01 | $11,676 |
| 101 | Traf cont-prot 701306 (70100460) | LS | 1 | $12,000 | $46,573 | $41,956 |
| 102 | Traf cont-prot 701326 (70100500) | LS | 1 | $0.01 | $0.01 | $29,060 |
| 103 | Traf cont-prot 701336 (70100600) | LS | 1 | $0.01 | $4,473.65 | $17,239 |
| 104 | TR cont & prot 701501 (70102620) | LS | 1 | $5,000.00 | $19,108 | $20,064 |
| 105 | Temp BR traf signals (70106500) | EACH | 1 | $15,000 | $4,950.00 | $11,235 |
| 106 | Temp rumble strips (70106700) | EACH | 6 | $1,500.00 | $1,766.89 | $787.50 |
| 107 | Changeable message SN (70107025) | CAL DAY | 112 | $70.00 | $81.80 | $92.72 |
| 108 | Short term pavt mking (70300100) | LF | 2,877 | $1.50 | $2.40 | $2.52 |
| 109 | SHRT TRM pavt MK rem (70300150) | SF | 959 | $2.00 | $0.01 | $1.69 |
| 110 | Temp PVT MK LTR & sym paint (70300211) | SF | 36 | $0.01 | $0.01 | $2.63 |
| 111 | Temp PVT MK line 4 - paint (70300221) | LF | 24,595 | $0.01 | $0.01 | $0.22 |
| 112 | Temp PVT MK line 12 - paint (70300261) | LF | 262 | $0.01 | $0.01 | $0.65 |
| 113 | Temp PVT MK line 24 - paint (70300281) | LF | 40 | $0.01 | $0.01 | $3.15 |
| 114 | THPL PVT MK LTR & sym (78000100) | SF | 36 | $5.00 | $4.83 | $4.73 |
| 115 | THPL PVT MK line 4 (78000200) | LF | 24,595 | $0.75 | $0.79 | $0.78 |
| 116 | THPL PVT MK line 12 (78000600) | LF | 262 | $2.45 | $2.39 | $2.34 |
| 117 | THPL PVT MK line 24 (78000650) | LF | 40 | $5.15 | $4.77 | $4.67 |
| 118 | Raised refl pavt MKR (78100100) | EACH | 175 | $45.00 | $42.89 | $42.00 |
| 119 | Raised ref PVT MK rem (78300200) | EACH | 175 | $16.00 | $6.49 | $6.81 |
| 120 | PVT MKG rem grinding (78300201) | SF | 8,580 | $0.01 | $0.01 | $0.95 |
| 121 | Uninter power sup ext (86200300) | EACH | 1 | $0.01 | $0.01 | $0.01 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of November 7, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.