IDOT contract 78C03 bid tabulation

Section 8CR-1. Let by Illinois DOT on January 16, 2026, Saline, District 09. 3 bids received; low bid $449,516 by Sierra Bravo Contractors, LLC.

Owner
Illinois DOT
Letting
16 JAN 2026
Pay items
43
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Sierra Bravo Contractors, LLC$449,516Low
2Samron Midwest Contracting, Inc.$458,338+2.0%
3E. T. Simonds Construction Company$551,334+23%
IDOT contract 78C03: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Sierra Bravo Contractors, LLC2. Samron Midwest Contracting, Inc.3. E. T. Simonds Construction Company
1Memb WTRPRF sys B STR (X5810103)SY87$39.22$21.00$65.26
2Traf cont-prot BLR 21 (X7011800)LS1$5,873.28$800.00$3,700.96
3Detour signing (X7200203)LS1$6,300.00$7,000.00$10,270
4Construction layout (Z0013798)LS1$4,347.00$7,000.00$4,132.56
5Rock fill - foundatn (Z0054517)TON99$52.54$35.00$89.58
6Tree remov 6-15 (20100110)UNIT168$104.77$45.00$64.56
7Tree remov over 15 (20100210)UNIT152$98.13$50.00$71.35
8Earth excavation (20200100)CY345$23.45$25.00$43.72
9Channel excavation (20300100)CY107$54.94$35.00$44.23
10Furnished excavation (20400800)CY480$40.68$44.00$34.11
11Porous gran embank (20700220)CY419$69.69$60.00$91.37
12Seeding CL 2 (25000200)ACRE0.25$12,311$11,500$12,898
13Seeding CL 7 (25000350)ACRE0.25$918.76$0.01$962.52
14Nitrogen fert nutr (25000400)LB24$1.73$2.00$1.82
15Phosphorus fert nutr (25000500)LB24$1.73$2.00$1.82
16Potassium fert nutr (25000600)LB24$1.73$2.00$1.82
17Agr ground limestone (25000700)TON0.50$367.50$1,400.00$385.00
18Erosion contr blanket (25100630)SY1,210$2.05$1.25$2.15
19Temp eros contr seed (28000250)LB25$5.69$4.00$25.53
20Perimeter eros bar (28000400)LF427$5.19$0.01$7.23
21Stone riprap CL A4 (28100107)SY75$56.88$80.00$88.25
22Filter fabric (28200200)SY75$4.91$8.00$6.68
23Welded wire reinf (42000060)SY127$21.13$8.00$14.17
24PCC PVT 10 (42000500)SY127$270.08$200.00$299.99
25Pavement rem (44000100)SY127$32.80$7.00$29.12
26PCC shoulders 8 (48300300)SY30$342.86$275.00$253.05
27Rem exist struct (50100100)EACH1$20,827$27,000$10,598
28Rem/disp uns matl-STR (50200450)CY57$63.59$30.00$66.15
29Reinf bars, epoxy CTD (50800205)LB3,200$2.04$2.50$2.38
30Conc box cul (54003000)CY35.40$1,986.44$2,000.00$3,575.84
31PCBC 11X8 (54011108)LF55$1,603.66$2,500.00$2,117.29
32Geocomposite wall DR (59100100)SY87$17.08$7.00$0.01
33Guardrail remov (63200310)LF500$7.22$7.00$7.20
34Engr field office A (67000400)CAL MO2$2,500.00$2,700.00$1,800.00
35Mobilization (67100100)LS1$26,223$26,000$40,900
36Traf cont-prot 701316 (70100100)EACH1$18,598$13,000$13,995
37Traf cont-prot 701201 (70100450)LS1$2,281.86$1,800.00$3,029.90
38TR cont surveillance (70103815)CAL DAY3$0.01$0.01$0.01
39Temp BR traf signals (70106500)EACH1$7,087.50$11,250$9,900.00
40Temp rumble strips (70106700)EACH6$787.50$900.00$1,151.09
41Changeable message SN (70107025)CAL DAY34$85.00$90.00$58.15
42Paint PVT MK line 4 (78001110)LF176$18.43$11.00$29.37
43Uninter power sup ext (86200300)EACH1$0.01$0.01$0.01
IDOT contract 78C03: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of January 16, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy