IDOT contract 78789 bid tabulation
Section (28,29,100,101-2)SR-1,N-1. Let by Illinois DOT on September 19, 2025, White, District 09. 3 bids received; low bid $5,191,314 by Sierra Bravo Contractors, LLC.
- Owner
- Illinois DOT
- Letting
- 19 SEP 2025
- Pay items
- 115
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Sierra Bravo Contractors, LLC | $5,191,314 | Low |
| 2 | Samron Midwest Contracting, Inc. | $5,388,092 | +4.0% |
| 3 | E. T. Simonds Construction Company | $5,866,677 | +13% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Sierra Bravo Contractors, LLC | 2. Samron Midwest Contracting, Inc. | 3. E. T. Simonds Construction Company |
|---|---|---|---|---|---|---|
| 1 | Poly mod P C mortar (X0322194) | SF | 55 | $296.69 | $84.00 | $197.82 |
| 2 | Concrete pad removal (X1700114) | SF | 351 | $38.67 | $3.10 | $8.34 |
| 3 | Prof DMD GRND con PVT (X4202010) | SY | 2,048 | $15.94 | $15.40 | $19.44 |
| 4 | Gutter remov SPL (X4402720) | LF | 1,831 | $20.79 | $6.60 | $14.10 |
| 5 | Island removal (X4402805) | SF | 33 | $29.32 | $2.70 | $65.23 |
| 6 | Spray-appld box cul linr (X5430502) | SF | 5,476 | $103.49 | $56.80 | $108.98 |
| 7 | Fence removal (X6640104) | LF | 938 | $3.39 | $3.30 | $4.24 |
| 8 | Traf cont & prot SPL (X7010216) | LS | 1 | $7,951.97 | $0.01 | $168,772 |
| 9 | Traf cont-prot BLR 21 (X7011800) | LS | 1 | $5,617.50 | $6,000.00 | $18,954 |
| 10 | Detour signing (X7200203) | LS | 1 | $32,839 | $35,000 | $52,961 |
| 11 | STR rep con DP over 5 (Z0012755) | SF | 9 | $820.05 | $260.00 | $727.03 |
| 12 | Construction layout (Z0013798) | LS | 1 | $39,690 | $28,000 | $50,525 |
| 13 | Paint curb (Z0036200) | LF | 63 | $3.15 | $3.35 | $3.19 |
| 14 | Trainees (Z0076600) | HR | 1,000 | $0.80 | $0.80 | $0.80 |
| 15 | Trainees TPG (Z0076604) | HR | 1,000 | $15.00 | $15.00 | $15.00 |
| 16 | Tree remov acres (20100500) | ACRE | 3.50 | $11,686 | $15,500 | $12,197 |
| 17 | Earth excavation (20200100) | CY | 32,075 | $11.66 | $20.00 | $15.29 |
| 18 | Rem & disp uns matl (20201200) | CY | 6,435 | $14.64 | $30.00 | $16.91 |
| 19 | Furnished excavation (20400800) | CY | 29,080 | $21.17 | $24.00 | $22.27 |
| 20 | Porous gran embank (20700220) | CY | 558 | $71.40 | $92.00 | $85.38 |
| 21 | Trench backfill (20800150) | CY | 393 | $66.32 | $55.00 | $126.78 |
| 22 | Seeding CL 2A (25000210) | ACRE | 16.50 | $1,863.75 | $1,980.00 | $1,863.75 |
| 23 | Seeding CL 7 (25000350) | ACRE | 16.50 | $546.00 | $580.00 | $546.00 |
| 24 | Nitrogen fert nutr (25000400) | LB | 1,472 | $1.73 | $1.80 | $1.73 |
| 25 | Phosphorus fert nutr (25000500) | LB | 1,472 | $1.73 | $1.80 | $1.73 |
| 26 | Potassium fert nutr (25000600) | LB | 1,472 | $1.73 | $1.80 | $1.73 |
| 27 | Agr ground limestone (25000700) | TON | 32.70 | $367.50 | $390.00 | $367.50 |
| 28 | Mulch method 2 (25100115) | ACRE | 16.50 | $1,338.75 | $1,400.00 | $1,338.75 |
| 29 | Erosion contr blanket (25100630) | SY | 7,225 | $1.79 | $2.00 | $1.79 |
| 30 | Temp eros contr seed (28000250) | LB | 1,639 | $3.39 | $3.80 | $2.61 |
| 31 | Temp ditch checks (28000305) | LF | 2,263 | $12.40 | $13.00 | $23.97 |
| 32 | Perimeter eros bar (28000400) | LF | 7,271 | $4.70 | $3.10 | $8.08 |
| 33 | Inlet & pipe protect (28000500) | EACH | 10 | $278.31 | $143.00 | $388.52 |
| 34 | Stone riprap CL A4 (28100107) | SY | 1,717 | $35.62 | $59.00 | $55.47 |
| 35 | Stone riprap CL A5 (28100109) | SY | 1,268 | $39.73 | $80.00 | $66.52 |
| 36 | Filter fabric (28200200) | SY | 2,985 | $3.23 | $1.50 | $5.73 |
| 37 | Sub gran mat A 12 (31100910) | SY | 2,564 | $25.04 | $21.00 | $34.76 |
| 38 | Agg base cse A 8 (35100700) | SY | 61 | $25.64 | $30.00 | $51.84 |
| 39 | Agg surf course TY B (40200800) | TON | 308 | $26.39 | $52.00 | $45.80 |
| 40 | Incidental HMA surf (40800050) | TON | 11 | $463.97 | $173.00 | $368.27 |
| 41 | PCC PVT 9 jointed (42000401) | SY | 2,048 | $200.00 | $95.00 | $164.07 |
| 42 | Pavement rem (44000100) | SY | 1,890 | $19.99 | $16.00 | $34.24 |
| 43 | Comb curb gutter rem (44000500) | LF | 24 | $28.28 | $28.00 | $24.68 |
| 44 | Paved ditch removal (44004000) | LF | 333 | $35.45 | $16.50 | $15.97 |
| 45 | Paved SHLD removal (44004250) | SY | 198 | $34.28 | $17.00 | $53.95 |
| 46 | Pavt patch T4 10 (44200126) | SY | 250 | $353.42 | $94.00 | $142.62 |
| 47 | Aggregate SHLDS B 8 (48101600) | SY | 5,975 | $24.71 | $17.00 | $23.33 |
| 48 | Aggregate SHLDS B 9 (48101610) | SY | 259 | $43.54 | $33.00 | $27.78 |
| 49 | Agg wedge SHLD type B (48102100) | TON | 34 | $52.33 | $24.00 | $54.04 |
| 50 | HMA shoulders 8 (48203029) | SY | 13,773 | $43.41 | $51.00 | $41.37 |
| 51 | PCC shoulders 9 (48300400) | SY | 437 | $129.95 | $110.00 | $185.33 |
| 52 | Rem exist struct (50100100) | EACH | 10 | $4,924.56 | $350.00 | $4,911.75 |
| 53 | Conc rem (50102400) | CY | 9.10 | $1,491.68 | $323.00 | $680.16 |
| 54 | Conc headwall removal (50104400) | EACH | 2 | $1,770.86 | $350.00 | $473.86 |
| 55 | Pipe culvert remov (50105220) | LF | 350 | $33.73 | $30.00 | $28.98 |
| 56 | Reinforcement bars (50800105) | LB | 25,980 | $2.06 | $1.80 | $2.38 |
| 57 | Temp soil reten systm (52200020) | SF | 311 | $248.38 | $500.00 | $256.55 |
| 58 | Expan bolts 3/4 (54002020) | EACH | 128 | $69.25 | $21.00 | $36.25 |
| 59 | Conc box cul (54003000) | CY | 142.30 | $1,368.10 | $2,200.00 | $2,517.51 |
| 60 | P cul CL A 2 18 (542A1063) | LF | 110 | $115.35 | $97.00 | $92.97 |
| 61 | P cul CL A 2 48 (542A1093) | LF | 126 | $390.82 | $380.00 | $271.71 |
| 62 | P cul CL A 3 30 (542A1915) | LF | 38 | $203.50 | $280.00 | $281.55 |
| 63 | P cul CL A 4 48 (542A2773) | LF | 25 | $436.34 | $650.00 | $538.72 |
| 64 | P cul CL D 2 24 (542D1069) | LF | 40 | $102.13 | $230.00 | $121.77 |
| 65 | PRC flar end sec 18 (54213663) | EACH | 4 | $2,116.51 | $2,000.00 | $1,814.76 |
| 66 | PRC flar end sec 30 (54213675) | EACH | 2 | $3,105.95 | $3,500.00 | $3,063.27 |
| 67 | PRC flar end sec 48 (54213693) | EACH | 6 | $5,178.56 | $3,800.00 | $3,988.94 |
| 68 | Concrete collar (54248510) | CY | 2.80 | $3,113.18 | $2,000.00 | $3,661.65 |
| 69 | Metal FL end sec 24" (54262724) | EACH | 2 | $785.91 | $700.00 | $1,193.27 |
| 70 | Insert cul lin 24 (54390180) | LF | 93 | $118.87 | $725.00 | $127.27 |
| 71 | Insert cul lin 48 (54390260) | LF | 153 | $229.38 | $790.00 | $249.24 |
| 72 | Remov inlets (60500060) | EACH | 3 | $2,361.13 | $340.00 | $736.24 |
| 73 | Class SI conc outlet (60600095) | CY | 79 | $1,346.82 | $1,350.00 | $715.17 |
| 74 | Concrete gutter TY A (60602500) | LF | 3,383 | $60.95 | $49.00 | $58.89 |
| 75 | Comb CC&G TM4.06 (60608552) | LF | 21 | $73.53 | $63.00 | $74.89 |
| 76 | Comb CC&G TM4.24 (60608582) | LF | 45 | $84.12 | $68.00 | $59.25 |
| 77 | Conc median surf 4 (60618300) | SF | 205 | $11.77 | $9.00 | $19.73 |
| 78 | Box cul to BE cleaned (60905305) | LF | 48 | $220.97 | $160.00 | $330.31 |
| 79 | Guardrail remov (63200310) | LF | 534 | $8.16 | $11.00 | $19.45 |
| 80 | Shoulder rum strip 8 (64200108) | LF | 25,318 | $0.41 | $0.61 | $0.71 |
| 81 | Fur erect row markers (66600105) | EACH | 56 | $194.86 | $270.00 | $177.26 |
| 82 | Perm surv MKRS T2 (66700305) | EACH | 9 | $868.71 | $380.00 | $1,738.80 |
| 83 | Engr field office A (67000400) | CAL MO | 12 | $2,905.35 | $2,000.00 | $2,200.00 |
| 84 | Mobilization (67100100) | LS | 1 | $305,157 | $319,000 | $383,781 |
| 85 | Traf cont-prot 701201 (70100450) | LS | 1 | $22,995 | $50,000 | $63,702 |
| 86 | Traf cont-prot 701326 (70100500) | LS | 1 | $16,376 | $0.01 | $25,597 |
| 87 | TR cont surveillance (70103815) | CAL DAY | 8 | $914.57 | $470.00 | $0.01 |
| 88 | Changeable message SN (70107025) | CAL DAY | 98 | $87.16 | $118.00 | $77.71 |
| 89 | SHRT TRM pavt MK rem (70300150) | SF | 337 | $4.14 | $0.01 | $7.15 |
| 90 | Temp PVT MK L4 T4 tape (70307120) | LF | 820 | $6.70 | $0.01 | $2.45 |
| 91 | Temp PVT MK L24 T4 tape (70307210) | LF | 31 | $12.28 | $0.01 | $4.82 |
| 92 | Sign panel T1 (72000100) | SF | 6 | $108.99 | $110.00 | $62.61 |
| 93 | Mod ureth PM line 4 (78009004) | LF | 36,270 | $0.79 | $0.85 | $0.80 |
| 94 | Mod ureth PM line 8 (78009008) | LF | 124 | $5.25 | $5.60 | $5.32 |
| 95 | Mod ureth PM line 12 (78009012) | LF | 451 | $10.50 | $11.00 | $10.63 |
| 96 | Mod ureth PM line 24 (78009024) | LF | 31 | $21.00 | $22.00 | $21.27 |
| 97 | GRV RCSD PVT MRKG 5 (78011025) | LF | 1,141 | $5.25 | $6.00 | $5.32 |
| 98 | GRV RCSD PVT MRKG 9 (78011045) | LF | 124 | $8.40 | $9.00 | $8.51 |
| 99 | GRV RCSD PVT MRKG 13 (78011065) | LF | 451 | $9.45 | $10.00 | $9.57 |
| 100 | GRV RCSD PVT MRKG 25 (78011125) | LF | 31 | $10.50 | $11.00 | $10.63 |
| 101 | Raised refl pavt MKR (78100100) | EACH | 53 | $118.65 | $125.00 | $217.80 |
| 102 | Curb reflectors (78200020) | EACH | 11 | $12.60 | $13.00 | $5.78 |
| 103 | Raised ref PVT MK rem (78300200) | EACH | 6 | $87.62 | $35.00 | $46.05 |
| 104 | Elect serv install (80400100) | EACH | 1 | $4,864.86 | $5,200.00 | $4,913.51 |
| 105 | Undrgrd C CNC 2 (81028750) | LF | 116 | $21.39 | $23.00 | $21.60 |
| 106 | UD 2#8 #8G xlpuse 3/4 (81603000) | LF | 550 | $12.43 | $13.00 | $12.56 |
| 107 | Lum LED rdwy G (82110007) | EACH | 3 | $961.54 | $1,020.00 | $971.16 |
| 108 | LT cont PM 240V 60 (82500310) | EACH | 1 | $9,036.56 | $10,000 | $9,126.93 |
| 109 | LT P A 40MH 15MA (83008600) | EACH | 3 | $6,822.90 | $7,250.00 | $6,891.13 |
| 110 | LP F M 15BC 8 5/8X6 (83600356) | EACH | 3 | $1,523.81 | $1,600.00 | $1,539.05 |
| 111 | Bkwy dev cou SS SCRN (83800650) | EACH | 12 | $208.49 | $220.00 | $210.58 |
| 112 | Rem LT unit salv (84200500) | EACH | 2 | $545.74 | $580.00 | $551.20 |
| 113 | Remov lighting contr (84500110) | EACH | 1 | $545.74 | $580.00 | $551.20 |
| 114 | Remov elect serv inst (84500120) | EACH | 1 | $545.74 | $580.00 | $551.20 |
| 115 | Reloc EX FL beacon (89501510) | EACH | 1 | $1,091.48 | $1,200.00 | $1,102.40 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of September 19, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way