IDOT contract 78844 bid tabulation
Section 3CR-1;4CR-1. Let by Illinois DOT on March 7, 2025, Hardin, District 09. 3 bids received; low bid $897,358 by Sierra Bravo Contractors, LLC.
- Owner
- Illinois DOT
- Letting
- 07 MAR 2025
- Pay items
- 50
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Sierra Bravo Contractors, LLC | $897,358 | Low |
| 2 | Samron Midwest Contracting, Inc. | $909,688 | +1.0% |
| 3 | E. T. Simonds Construction Company | $1,262,484 | +41% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Sierra Bravo Contractors, LLC | 2. Samron Midwest Contracting, Inc. | 3. E. T. Simonds Construction Company |
|---|---|---|---|---|---|---|
| 1 | Memb WTRPRF sys B STR (X5810103) | SY | 225 | $40.00 | $27.00 | $98.11 |
| 2 | Traf cont-prot BLR 21 (X7011800) | LS | 1 | $5,250.00 | $8,660.84 | $12,959 |
| 3 | Detour signing (Z0016702) | LS | 1 | $15,713 | $22,000 | $16,461 |
| 4 | Rock fill - foundatn (Z0054517) | TON | 129 | $44.34 | $20.00 | $65.04 |
| 5 | Tree remov 6-15 (20100110) | UNIT | 51 | $132.54 | $90.00 | $114.60 |
| 6 | Tree remov acres (20100500) | ACRE | 0.10 | $33,799 | $1,600.00 | $92,547 |
| 7 | Earth excavation (20200100) | CY | 1,685 | $15.52 | $30.00 | $52.39 |
| 8 | Rock excavation (20200200) | CY | 19 | $198.73 | $300.00 | $1,094.46 |
| 9 | Porous gran embank (20700220) | CY | 915 | $61.16 | $36.00 | $85.15 |
| 10 | Seeding CL 2A (25000210) | ACRE | 0.45 | $8,925.00 | $5,700.00 | $9,350.00 |
| 11 | Seeding CL 7 (25000350) | ACRE | 0.45 | $420.00 | $410.00 | $440.00 |
| 12 | Nitrogen fert nutr (25000400) | LB | 41 | $4.20 | $2.00 | $4.40 |
| 13 | Phosphorus fert nutr (25000500) | LB | 41 | $4.20 | $2.00 | $4.40 |
| 14 | Potassium fert nutr (25000600) | LB | 41 | $4.20 | $2.00 | $4.40 |
| 15 | Agr ground limestone (25000700) | TON | 0.90 | $299.26 | $1,000.00 | $313.50 |
| 16 | Mulch method 2 (25100115) | ACRE | 0.45 | $8,925.00 | $6,000.00 | $9,350.00 |
| 17 | Temp eros contr seed (28000250) | LB | 45 | $6.10 | $2.00 | $12.39 |
| 18 | Perimeter eros bar (28000400) | LF | 596 | $5.93 | $7.00 | $12.29 |
| 19 | Stone riprap CL A4 (28100107) | SY | 28 | $83.07 | $95.00 | $83.87 |
| 20 | Stone riprap CL A5 (28100109) | SY | 150 | $87.77 | $60.00 | $80.46 |
| 21 | Filter fabric (28200200) | SY | 178 | $5.52 | $4.00 | $3.68 |
| 22 | Aggregate ditch (28300400) | TON | 70 | $68.07 | $50.00 | $74.40 |
| 23 | Welded wire reinf (42000060) | SY | 371 | $11.79 | $9.00 | $21.55 |
| 24 | PCC PVT 10 (42000500) | SY | 371 | $196.15 | $135.00 | $232.91 |
| 25 | Pavement rem (44000100) | SY | 371 | $30.07 | $10.00 | $53.10 |
| 26 | Paved SHLD removal (44004250) | SY | 60 | $25.78 | $6.00 | $82.50 |
| 27 | Agg wedge SHLD type B (48102100) | TON | 4 | $84.45 | $72.00 | $310.15 |
| 28 | PCC shoulders 10 (48300500) | SY | 124 | $152.20 | $180.00 | $279.38 |
| 29 | Rem exist struct N1 (50100300) | EACH | 1 | $15,960 | $30,000 | $22,046 |
| 30 | Rem exist struct N2 (50100400) | EACH | 1 | $15,960 | $20,000 | $13,309 |
| 31 | Rem/disp uns matl-STR (50200450) | CY | 108 | $39.66 | $20.00 | $45.55 |
| 32 | Reinf bars, epoxy CTD (50800205) | LB | 12,560 | $2.57 | $2.00 | $2.00 |
| 33 | Temp soil reten systm (52200020) | SF | 333 | $147.91 | $0.01 | $270.00 |
| 34 | Box cul end sec C2 (54001002) | EACH | 2 | $49,050 | $55,000 | $46,874 |
| 35 | Conc box cul (54003000) | CY | 69.30 | $1,770.87 | $2,000.00 | $2,160.44 |
| 36 | PCBC 6X4 (54010604) | LF | 74 | $682.06 | $1,200.00 | $1,075.33 |
| 37 | PCBC 12X6 (54011206) | LF | 64 | $1,348.01 | $1,900.00 | $1,837.89 |
| 38 | Geocomposite wall DR (59100100) | SY | 225 | $15.08 | $9.00 | $58.94 |
| 39 | Fur erect row markers (66600105) | EACH | 16 | $196.35 | $600.00 | $205.70 |
| 40 | Engr field office A (67000400) | CAL MO | 6 | $2,749.65 | $2,000.00 | $2,200.00 |
| 41 | Mobilization (67100100) | LS | 1 | $53,840 | $54,000 | $105,156 |
| 42 | Traf cont-prot 701316 (70100100) | EACH | 1 | $20,790 | $16,000 | $16,320 |
| 43 | Traf cont-prot 701201 (70100450) | LS | 1 | $735.00 | $1,750.00 | $10,083 |
| 44 | TR cont surveillance (70103815) | CAL DAY | 10 | $620.87 | $0.01 | $0.01 |
| 45 | Temp BR traf signals (70106500) | EACH | 1 | $15,750 | $8,000.00 | $24,000 |
| 46 | Temp rumble strips (70106700) | EACH | 6 | $945.00 | $1,200.00 | $990.00 |
| 47 | Changeable message SN (70107025) | CAL DAY | 84 | $99.34 | $135.00 | $86.75 |
| 48 | Paint PVT MK line 4 (78001110) | LF | 1,341 | $4.24 | $5.00 | $4.44 |
| 49 | PVT MKG rem grinding (78300201) | SF | 427 | $16.80 | $11.00 | $17.60 |
| 50 | Uninter power sup ext (86200300) | EACH | 1 | $0.01 | $0.01 | $0.01 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.