IDOT contract 78A91 bid tabulation
Section 12-1(SLP-2,SR-1,GR-1). Let by Illinois DOT on March 7, 2025, Union, District 09. 3 bids received; low bid $359,872 by Sierra Bravo Contractors, LLC.
- Owner
- Illinois DOT
- Letting
- 07 MAR 2025
- Pay items
- 38
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Sierra Bravo Contractors, LLC | $359,872 | Low |
| 2 | E. T. Simonds Construction Company | $369,757 | +3.0% |
| 3 | Samron Midwest Contracting, Inc. | $371,742 | +3.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Sierra Bravo Contractors, LLC | 2. E. T. Simonds Construction Company | 3. Samron Midwest Contracting, Inc. |
|---|---|---|---|---|---|---|
| 1 | Timber curb removal (X0322329) | LF | 779 | $5.98 | $11.34 | $9.00 |
| 2 | Earth excavation (20200100) | CY | 1,099 | $26.76 | $25.64 | $35.00 |
| 3 | Furnished excavation (20400800) | CY | 872 | $39.16 | $60.72 | $50.00 |
| 4 | Seeding CL 2 (25000200) | ACRE | 0.10 | $38,225 | $38,225 | $20,000 |
| 5 | Seeding CL 7 (25000350) | ACRE | 0.10 | $1,540.00 | $1,540.00 | $1.00 |
| 6 | Nitrogen fert nutr (25000400) | LB | 9 | $4.40 | $4.40 | $0.01 |
| 7 | Phosphorus fert nutr (25000500) | LB | 9 | $4.40 | $4.40 | $0.01 |
| 8 | Potassium fert nutr (25000600) | LB | 9 | $4.40 | $4.40 | $0.01 |
| 9 | Agr ground limestone (25000700) | TON | 0.40 | $660.00 | $660.00 | $1,300.00 |
| 10 | Mulch method 2 (25100115) | ACRE | 0.10 | $3,850.00 | $3,850.00 | $4,800.00 |
| 11 | Erosion contr blanket (25100630) | SY | 296 | $7.70 | $7.70 | $3.50 |
| 12 | Temp eros contr seed (28000250) | LB | 12 | $10.02 | $25.65 | $0.01 |
| 13 | Perimeter eros bar (28000400) | LF | 330 | $5.08 | $7.09 | $7.00 |
| 14 | Stone riprap CL A4 (28100107) | SY | 694 | $64.38 | $37.50 | $35.00 |
| 15 | Filter fabric (28200200) | SY | 712 | $5.10 | $2.22 | $8.00 |
| 16 | Lime (30201500) | TON | 60 | $179.09 | $177.44 | $160.00 |
| 17 | Sub gran mat A 12 (31100910) | SY | 224 | $28.43 | $47.73 | $0.01 |
| 18 | Protective coat (42001300) | SY | 327 | $0.80 | $2.04 | $0.01 |
| 19 | Paved SHLD removal (44004250) | SY | 184 | $25.89 | $24.16 | $65.00 |
| 20 | Tie bars 3/4 (44213204) | EACH | 62 | $31.73 | $26.57 | $25.00 |
| 21 | PCC shoulders 10 (48300500) | SY | 148 | $163.00 | $131.20 | $100.00 |
| 22 | Conc HDWL for P drain (60100060) | EACH | 4 | $437.27 | $587.70 | $550.00 |
| 23 | Pipe underdrain 4 SP (60108100) | LF | 60 | $77.79 | $30.73 | $10.00 |
| 24 | Backslope drain T3 4 (60109640) | LF | 358 | $53.72 | $20.76 | $15.00 |
| 25 | Comb CC&G TB6.12 (60603800) | LF | 779 | $42.07 | $59.01 | $50.00 |
| 26 | SPBGR TY A 9FT posts (63000003) | LF | 862 | $47.09 | $44.00 | $42.00 |
| 27 | TR bar TRM T1 SPL tan (63100167) | EACH | 4 | $3,657.50 | $4,620.00 | $3,650.00 |
| 28 | Guardrail remov (63200310) | LF | 1,012 | $7.37 | $11.80 | $6.00 |
| 29 | Mobilization (67100100) | LS | 1 | $21,508 | $22,531 | $22,000 |
| 30 | Traf cont-prot 701316 (70100100) | EACH | 1 | $20,152 | $14,173 | $55,000 |
| 31 | Traf cont-prot 701306 (70100460) | LS | 1 | $660.00 | $4,617.21 | $0.01 |
| 32 | Temp BR traf signals (70106500) | EACH | 1 | $11,000 | $12,980 | $15,000 |
| 33 | Temp rumble strips (70106700) | EACH | 6 | $990.00 | $990.00 | $1,000.00 |
| 34 | Changeable message SN (70107025) | CAL DAY | 28 | $69.72 | $87.26 | $90.00 |
| 35 | Terminal marker - DA (72501000) | EACH | 4 | $46.20 | $55.00 | $50.00 |
| 36 | THPL PVT MK line 4 (78000200) | LF | 176 | $20.52 | $34.10 | $20.00 |
| 37 | Grdrail ref type A (78200005) | EACH | 14 | $13.20 | $11.00 | $13.00 |
| 38 | Uninter power sup ext (86200300) | EACH | 1 | $1.10 | $0.01 | $0.01 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.