IDOT contract 78A15 bid tabulation
Section 12CR-1. Let by Illinois DOT on June 13, 2025, Union, District 09. 2 bids received; low bid $793,569 by Sierra Bravo Contractors, LLC.
- Owner
- Illinois DOT
- Letting
- 13 JUN 2025
- Pay items
- 54
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Sierra Bravo Contractors, LLC | $793,569 | Low |
| 2 | E. T. Simonds Construction Company | $1,031,975 | +30% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Sierra Bravo Contractors, LLC | 2. E. T. Simonds Construction Company |
|---|---|---|---|---|---|
| 1 | Memb WTRPRF sys B STR (X5810103) | SY | 67 | $57.05 | $60.53 |
| 2 | Traf cont-prot BLR 21 (X7011800) | LS | 1 | $4,560.00 | $9,924.60 |
| 3 | Detour signing (X7200203) | LS | 1 | $4,560.00 | $16,534 |
| 4 | Construction layout (Z0013798) | LS | 1 | $9,000.00 | $17,095 |
| 5 | Rock fill - foundatn (Z0054517) | TON | 67 | $65.06 | $70.72 |
| 6 | Earth excavation (20200100) | CY | 239 | $32.54 | $52.44 |
| 7 | Furnished excavation (20400800) | CY | 230 | $39.96 | $71.45 |
| 8 | Porous gran embank (20700220) | CY | 194 | $96.23 | $108.20 |
| 9 | Seeding CL 2A (25000210) | ACRE | 0.40 | $8,670.00 | $8,092.00 |
| 10 | Seeding CL 7 (25000350) | ACRE | 0.40 | $2,670.00 | $2,492.00 |
| 11 | Nitrogen fert nutr (25000400) | LB | 36 | $1.98 | $1.85 |
| 12 | Phosphorus fert nutr (25000500) | LB | 36 | $1.98 | $1.85 |
| 13 | Potassium fert nutr (25000600) | LB | 36 | $1.98 | $1.85 |
| 14 | Agr ground limestone (25000700) | TON | 0.80 | $420.00 | $392.00 |
| 15 | Mulch method 2 (25100115) | ACRE | 0.40 | $5,910.00 | $5,516.00 |
| 16 | Temp eros contr seed (28000250) | LB | 40 | $7.92 | $6.95 |
| 17 | Perimeter eros bar (28000400) | LF | 133 | $6.60 | $13.43 |
| 18 | Stone riprap CL A4 (28100107) | SY | 263 | $84.68 | $68.73 |
| 19 | Filter fabric (28200200) | SY | 263 | $5.01 | $4.40 |
| 20 | Welded wire reinf (42000060) | SY | 115 | $27.48 | $22.94 |
| 21 | PCC PVT 10 (42000500) | SY | 115 | $357.92 | $317.18 |
| 22 | Pavement rem (44000100) | SY | 115 | $53.49 | $40.15 |
| 23 | PCC shoulders 8 (48300300) | SY | 365 | $147.33 | $152.98 |
| 24 | Rem exist struct (50100100) | EACH | 1 | $17,631 | $29,140 |
| 25 | Rem/disp uns matl-STR (50200450) | CY | 44 | $54.51 | $69.27 |
| 26 | Reinf bars, epoxy CTD (50800205) | LB | 12,660 | $3.08 | $2.04 |
| 27 | Steel railing TY CO-10 (50900207) | LF | 39 | $488.40 | $456.62 |
| 28 | Temp soil reten systm (52200020) | SF | 405 | $218.85 | $293.31 |
| 29 | Geotex retain wall (52200600) | SF | 45 | $59.23 | $247.61 |
| 30 | Conc box cul (54003000) | CY | 70 | $1,926.96 | $2,646.07 |
| 31 | PCBC 12X8 (54011208) | LF | 27 | $1,905.21 | $3,038.62 |
| 32 | Geocomposite wall DR (59100100) | SY | 67 | $24.07 | $39.45 |
| 33 | SPBGR TY A 6FT posts (63000001) | LF | 87.50 | $54.60 | $62.22 |
| 34 | LSG OV cul 18'9" span (63000360) | LF | 44 | $68.70 | $87.98 |
| 35 | Traf bar term T14 (63100119) | EACH | 2 | $8,010.00 | $9,055.20 |
| 36 | TR bar TRM T1 SPL tan (63100167) | EACH | 4 | $4,620.00 | $6,283.20 |
| 37 | Guardrail remov (63200310) | LF | 350 | $5.06 | $13.69 |
| 38 | Fur erect row markers (66600105) | EACH | 4 | $360.00 | $210.42 |
| 39 | Engr field office A (67000400) | CAL MO | 6 | $3,116.28 | $2,200.00 |
| 40 | Mobilization (67100100) | LS | 1 | $27,389 | $93,655 |
| 41 | Traf cont-prot 701321 (70100405) | EACH | 1 | $23,295 | $23,690 |
| 42 | Traf cont-prot 701201 (70100450) | LS | 1 | $1,440.00 | $12,744 |
| 43 | TR cont surveillance (70103815) | CAL DAY | 10 | $683.51 | $0.01 |
| 44 | Temp BR traf signals (70106500) | EACH | 1 | $30,750 | $47,203 |
| 45 | Temp rumble strips (70106700) | EACH | 6 | $900.00 | $1,263.70 |
| 46 | Changeable message SN (70107025) | CAL DAY | 34 | $113.86 | $77.51 |
| 47 | Temp conc barrier (70400100) | LF | 350 | $60.84 | $29.82 |
| 48 | Pin temp conc barrier (70400125) | EACH | 36 | $72.76 | $32.11 |
| 49 | Imp attn temp FRN TL2 (70600255) | EACH | 4 | $9,000.00 | $9,143.25 |
| 50 | Terminal marker - DA (72501000) | EACH | 4 | $50.40 | $56.00 |
| 51 | Paint PVT MK line 4 (78001110) | LF | 1,360 | $4.51 | $4.21 |
| 52 | Grdrail ref type A (78200005) | EACH | 16 | $14.40 | $11.20 |
| 53 | PVT MKG rem grinding (78300201) | SF | 227 | $36.00 | $33.60 |
| 54 | Uninter power sup ext (86200300) | EACH | 1 | $0.01 | $5,360.75 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.