IDOT contract 95990 bid tabulation
Project Number: Bpca-404 / /, section 21-00133-00-BR. Let by Illinois DOT on January 16, 2026, Lawrence, District 07. 3 bids received; low bid $799,799 by C-Hill Civil Contractors, Inc..
- Owner
- Illinois DOT
- Letting
- 16 JAN 2026
- Pay items
- 40
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | C-Hill Civil Contractors, Inc. | $799,799 | Low |
| 2 | Samron Midwest Contracting, Inc. | $806,731 | +1.0% |
| 3 | Kieffer Bros. Construction Co., Inc. | $969,508 | +21% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. C-Hill Civil Contractors, Inc. | 2. Samron Midwest Contracting, Inc. | 3. Kieffer Bros. Construction Co., Inc. |
|---|---|---|---|---|---|---|
| 1 | Seeding CL 2 SPL (X2501000) | ACRE | 0.95 | $5,000.00 | $5,000.00 | $10,473 |
| 2 | Inlets SPL N1 (X6024242) | EACH | 1 | $4,000.00 | $3,600.00 | $5,080.58 |
| 3 | Inlets SPL N2 (X6024244) | EACH | 1 | $4,000.00 | $3,600.00 | $4,607.29 |
| 4 | Traf barrier term SPL (X6310087) | EACH | 1 | $2,244.00 | $2,200.00 | $2,565.20 |
| 5 | Traf bar term T6A mod (X6310188) | EACH | 2 | $5,712.00 | $5,600.00 | $6,528.93 |
| 6 | Tree remov over 15 (20100210) | UNIT | 40 | $62.00 | $80.00 | $159.00 |
| 7 | Earth excavation (20200100) | CY | 810 | $16.25 | $25.00 | $21.20 |
| 8 | Channel excavation (20300100) | CY | 220 | $35.00 | $25.00 | $45.79 |
| 9 | Furnished excavation (20400800) | CY | 690 | $46.00 | $35.00 | $39.64 |
| 10 | Trench backfill (20800150) | CY | 8 | $81.00 | $130.00 | $83.21 |
| 11 | Stone dump rip CL A4 (28100807) | TON | 260 | $76.00 | $64.00 | $98.90 |
| 12 | Agg base cse B (35101400) | TON | 1,510 | $49.00 | $46.00 | $55.54 |
| 13 | Agg surf course TY B (40200800) | TON | 105 | $57.00 | $46.00 | $60.84 |
| 14 | Bit matls PR CT (40600275) | LB | 4,030 | $1.00 | $1.00 | $1.17 |
| 15 | Bit matls tack CT (40600290) | LB | 2,535 | $0.50 | $0.40 | $0.58 |
| 16 | HMA BC IL-19.0 N70 (40603085) | TON | 400 | $150.00 | $150.00 | $171.99 |
| 17 | HMA SC IL-9.5 C N70 (40604052) | TON | 800 | $163.00 | $160.00 | $186.56 |
| 18 | Pavement rem (44000100) | SY | 2,660 | $8.00 | $9.00 | $14.10 |
| 19 | Aggregate SHLDS B (48101200) | TON | 240 | $63.00 | $55.00 | $60.84 |
| 20 | Rem exist struct (50100100) | EACH | 1 | $10,000 | $10,000 | $20,935 |
| 21 | Conc struct (50300225) | CY | 35.20 | $775.00 | $1,000.00 | $1,081.20 |
| 22 | Concrete encasement (50300280) | CY | 3.50 | $1,000.00 | $1,000.00 | $2,538.70 |
| 23 | P P conc DK BM 17 DP (50400305) | SF | 1,230 | $119.00 | $119.75 | $140.93 |
| 24 | Reinf bars, epoxy CTD (50800205) | LB | 5,140 | $2.10 | $2.50 | $4.61 |
| 25 | Steel railing TY SM (50901050) | LF | 86 | $244.00 | $240.00 | $279.84 |
| 26 | Fur STL pile HP12X53 (51201600) | LF | 612 | $43.00 | $45.00 | $3.82 |
| 27 | Driving piles (51202305) | LF | 612 | $1.00 | $0.01 | $2.65 |
| 28 | Test pile ST HP12X53 (51203600) | EACH | 1 | $32,000 | $25,000 | $47,700 |
| 29 | Pile shoes (51204650) | EACH | 9 | $159.00 | $150.00 | $189.21 |
| 30 | Name plates (51500100) | EACH | 1 | $880.00 | $800.00 | $1,184.55 |
| 31 | P cul CL D 1 18 (542D0223) | LF | 140 | $48.00 | $46.00 | $72.93 |
| 32 | P cul CL D 1 30 (542D0235) | LF | 100 | $85.00 | $78.00 | $132.98 |
| 33 | Storm sew CL B 1 18 (550B0090) | LF | 350 | $53.00 | $59.00 | $62.28 |
| 34 | Contr low-streng matl (59300100) | CY | 46 | $138.00 | $150.00 | $219.42 |
| 35 | Inlets TB T1F OL (60240210) | EACH | 1 | $6,000.00 | $3,600.00 | $4,030.12 |
| 36 | SPBGR TY A 6FT posts (63000001) | LF | 237.50 | $28.50 | $28.00 | $32.65 |
| 37 | Traf bar term T6A (63100087) | EACH | 2 | $5,000.00 | $4,700.00 | $5,480.20 |
| 38 | TR bar TRM T1 SPL tan (63100167) | EACH | 3 | $4,100.00 | $4,100.00 | $4,780.60 |
| 39 | Mobilization (67100100) | LS | 1 | $30,260 | $48,000 | $44,070 |
| 40 | Terminal marker - DA (72501000) | EACH | 4 | $51.00 | $52.00 | $58.30 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 16, 2026. Compiled by Mirage Metrics.