Depew and Owen Builders, Inc.: IDOT bid record

Depew and Owen Builders, Inc. submitted 21 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 23 SEP 2022, and was the low bidder on 13 of them (62%). When it was not low, its total sat a median +6.0% above the low bid.

Owner
Illinois DOT
Low bid volume
$6,177,744
Latest bid
23 SEP 2022
Data through
18 SEP 2026
21Bids
13Low bids
62Win rate, percent
+6.0%Median gap to the low bid when not low, 8 bids

By year

YearBidsLow bidsWin rate
202111545%
202210880%
Depew and Owen Builders, Inc., IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 0715853%
District 0833100%
District 062150%
District 0511100%
Depew and Owen Builders, Inc., IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Terminal marker - DA72501000EACH1513 (87%)$40.00$47.85
Rem exist struct50100100EACH1511 (73%)$10,000$50,000
Name plates51500100EACH1610 (63%)$412.90$773.24
Earth excavation20200100CY158 (53%)$15.00$48.00
Contr low-streng matl59300100CY88 (100%)$97.50$260.00
Reinf bars, epoxy CTD50800205LB157 (47%)$2.00$2.50
Conc struct50300225CY176 (35%)$700.00$1,260.00
Channel excavation20300100CY166 (38%)$17.00$35.00
Seeding CL 2 SPLX2501000ACRE106 (60%)$5,025.00$9,000.00
Driving piles51202305LF155 (33%)$1.00$0.10
Steel railing TY S150900205LF115 (45%)$145.00$171.15
Concrete encasement50300280CY94 (44%)$700.00$1,200.00
Depew and Owen Builders, Inc., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Depew and Owen Builders, Inc., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
23 SEP 202291597District 05Project Number: J9Jx-577 / /, section 07-08119-01-BR1 of 3$1,158,188Low, 43% under the second
17 JUN 202276P78District 08Section 17BR-11 of 2$420,588Low, 1.0% under the second
17 JUN 202293789District 06Project Number: 9Exr-862 / /, section 19-07116-00-BR2 of 3$805,488+5.0%
17 JUN 202295914District 07Project Number: 6Hil-452 / /, section 18-20122-00-BR1 of 1$392,688Low
17 JUN 202295916District 07Project Number: 8Gm5-575 / /, section 19-07132-00-BR1 of 1$299,988Low
29 APR 202293781District 06Project Number: 5Fm7-562 / /, section 19-11115-00-BR1 of 3$399,988Low, 7.0% under the second
11 MAR 202295907District 07Project Number: 7Crw-135 / /, section 18-00287-00-BR1 of 3$939,488Low, 11% under the second
11 MAR 202295910District 07Project Number: Eswg-850 / /, section 17-00098-00-BR2 of 2$969,888+6.0%
21 JAN 202295898District 07Project Number: Bq7G-886 / /, section 04-12114-00-BR1 of 4$238,588Low, 14% under the second
21 JAN 202295906District 07Project Number: Gjzp-832 / /, section 18-08137-00-BR1 of 2$520,888Low, 11% under the second
05 NOV 202174995District 07Section D75 of 5$588,888+21%
11 JUN 202195894District 07Project Number: J0J7-421 / /, section 19-00124-00-BR1 of 3$418,488Low, 9.0% under the second
11 JUN 202195896District 07Project Number: L3Z9-012 / /, section 17-18119-00-BR1 of 4$296,588Low, 17% under the second
23 APR 202195895District 07Project Number: 6G85-256 / /, section 18-06117-00-BR1 of 2$318,888Low, 4.0% under the second
05 MAR 202174946District 07Section D73 of 6$374,788+15%
05 MAR 202195888District 07Project Number: 1Kij-037 / /, section 17-20129-00-BR2 of 4$366,788+1.0%
05 MAR 202197749District 08Project Number: 2Muy-482 / /, section 15-09034-00-BR1 of 3$236,788Low, 5.0% under the second
15 JAN 202195884District 07Project Number: Mwp9-383 / /, section 17-00170-00-BR2 of 3$689,888+3.0%
15 JAN 202195886District 07Project Number: Vfl2-092 / /, section 18-00122-00-BR2 of 3$571,488+6.0%
15 JAN 202195887District 07Project Number: Gqgz-590 / /, section 18-09115-00-BR2 of 3$396,828+8.0%
15 JAN 202197746District 08Project Number: Lr8W-861 / /, section 16-00102-00-BR1 of 4$536,588Low, 4.0% under the second
Depew and Owen Builders, Inc.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy