IDOT contract 78B01 bid tabulation
Section 101N-1. Let by Illinois DOT on March 7, 2025, White, District 09. 3 bids received; low bid $659,683 by Samron Midwest Contracting, Inc..
- Owner
- Illinois DOT
- Letting
- 07 MAR 2025
- Pay items
- 45
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Samron Midwest Contracting, Inc. | $659,683 | Low |
| 2 | E. T. Simonds Construction Company | $707,577 | +7.0% |
| 3 | Kieffer Bros. Construction Co., Inc. | $1,418,358 | +115% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Samron Midwest Contracting, Inc. | 2. E. T. Simonds Construction Company | 3. Kieffer Bros. Construction Co., Inc. |
|---|---|---|---|---|---|---|
| 1 | Prof DMD GRND con PVT (X4202010) | SY | 3,079 | $12.00 | $12.07 | $18.94 |
| 2 | Traf cont-prot BLR 22 (X7011801) | LS | 1 | $10,500 | $6,958.39 | $9,349.20 |
| 3 | Seeding CL 1 (25000100) | ACRE | 0.01 | $200,000 | $162,250 | $171,985 |
| 4 | Nitrogen fert nutr (25000400) | LB | 6 | $2.00 | $11.00 | $11.66 |
| 5 | Phosphorus fert nutr (25000500) | LB | 6 | $2.00 | $11.00 | $11.66 |
| 6 | Potassium fert nutr (25000600) | LB | 6 | $2.00 | $11.00 | $11.66 |
| 7 | Agr ground limestone (25000700) | TON | 0.02 | $4,000.00 | $11,000 | $11,660 |
| 8 | Mulch method 2 (25100115) | ACRE | 0.01 | $60,000 | $162,250 | $171,985 |
| 9 | Sub gran mat A 12 (31100910) | SY | 3,105 | $31.00 | $35.22 | $69.11 |
| 10 | PCC PVT 10 jointed (42000501) | SY | 3,079 | $102.00 | $118.47 | $196.42 |
| 11 | Protective coat (42001300) | SY | 3,079 | $2.00 | $0.89 | $3.82 |
| 12 | PC conc sidewalk 4 (42400100) | SF | 633 | $40.00 | $26.73 | $36.36 |
| 13 | Detectable warnings (42400800) | SF | 85 | $35.00 | $27.28 | $37.10 |
| 14 | Pavement rem (44000100) | SY | 3,079 | $16.00 | $17.01 | $30.53 |
| 15 | Comb curb gutter rem (44000500) | LF | 88 | $15.00 | $18.55 | $15.58 |
| 16 | Sidewalk rem (44000600) | SF | 705 | $3.00 | $4.63 | $6.47 |
| 17 | Dowel bars 1 1/2 (44201299) | EACH | 139 | $0.01 | $25.84 | $30.95 |
| 18 | Tie bars 3/4 (44213204) | EACH | 512 | $0.01 | $22.11 | $21.94 |
| 19 | Water valves adjust (56109210) | EACH | 1 | $25.00 | $252.74 | $333.90 |
| 20 | Man adjust (60255500) | EACH | 2 | $500.00 | $542.89 | $392.20 |
| 21 | Comb CC&G TY B-6.24 (60605000) | LF | 88 | $55.00 | $101.93 | $80.03 |
| 22 | Engr field office A (67000400) | CAL MO | 2 | $2,000.00 | $2,000.00 | $3,180.00 |
| 23 | Mobilization (67100100) | LS | 1 | $39,000 | $33,182 | $74,624 |
| 24 | Traf cont-prot 701316 (70100100) | EACH | 1 | $33,000 | $10,150 | $28,938 |
| 25 | TR cont & prot 701501 (70102620) | LS | 1 | $0.01 | $0.01 | $27,666 |
| 26 | TR cont & prot 701801 (70102640) | LS | 1 | $3,000.00 | $913.00 | $1,812.60 |
| 27 | Temp BR traf signals (70106500) | EACH | 1 | $15,000 | $5,500.00 | $13,992 |
| 28 | Changeable message SN (70107025) | CAL DAY | 28 | $100.00 | $87.26 | $139.92 |
| 29 | Short term pavt mking (70300100) | LF | 67 | $1.00 | $1.31 | $87.45 |
| 30 | SHRT TRM pavt MK rem (70300150) | SF | 25 | $5.00 | $43.95 | $174.90 |
| 31 | Temp PVT MK line 4 - paint (70300221) | LF | 167 | $0.01 | $0.01 | $8.75 |
| 32 | Temp PVT MK line 6 - paint (70300241) | LF | 290 | $0.01 | $0.01 | $14.58 |
| 33 | Temp PVT MK line 12 - paint (70300261) | LF | 306 | $0.01 | $0.01 | $29.15 |
| 34 | Temp PVT MK line 24 - paint (70300281) | LF | 44 | $0.01 | $0.01 | $58.30 |
| 35 | Mod ureth PM line 4 (78009004) | LF | 167 | $3.50 | $6.48 | $8.75 |
| 36 | Mod ureth PM line 6 (78009006) | LF | 290 | $2.50 | $9.56 | $17.49 |
| 37 | Mod ureth PM line 12 (78009012) | LF | 306 | $7.50 | $19.12 | $356.80 |
| 38 | Mod ureth PM line 24 (78009024) | LF | 44 | $14.00 | $38.23 | $69.96 |
| 39 | GRV RCSD PVT MRKG 5 (78011025) | LF | 167 | $4.00 | $4.95 | $7.29 |
| 40 | GRV RCSD PVT MRKG 7 (78011035) | LF | 290 | $2.00 | $7.70 | $14.58 |
| 41 | GRV RCSD PVT MRKG 13 (78011065) | LF | 306 | $8.00 | $11.00 | $29.15 |
| 42 | GRV RCSD PVT MRKG 25 (78011125) | LF | 44 | $15.00 | $22.00 | $58.30 |
| 43 | Raised refl pavt MKR (78100100) | EACH | 8 | $75.00 | $628.10 | $1,107.70 |
| 44 | PVT MKG rem grinding (78300201) | SF | 595 | $0.01 | $0.01 | $29.15 |
| 45 | Uninter power sup ext (86200300) | EACH | 1 | $0.01 | $0.01 | $19,239 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.