IDOT contract 46945 bid tabulation
Section WALNUT. Let by Illinois DOT on April 25, 2025, Douglas, District 05. 1 bid received; low bid $3,572,604 by Feutz Contractors, Inc..
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 119
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Feutz Contractors, Inc. | $3,572,604 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Feutz Contractors, Inc. |
|---|---|---|---|---|
| 1 | Rem EX parking blocks (X0301339) | EACH | 238 | $225.00 |
| 2 | Prec conc park block (X0301430) | EACH | 249 | $291.00 |
| 3 | WTR TWR (freezeproof) (X0320055) | EACH | 2 | $8,400.00 |
| 4 | Tubular steel gate (X0323013) | EACH | 8 | $4,000.00 |
| 5 | Traffic counter (X0323388) | EACH | 1 | $9,100.00 |
| 6 | Bflow prevent/enclose (X0325777) | EACH | 1 | $7,700.00 |
| 7 | Interpret sign compl (X0325789) | EACH | 12 | $4,100.00 |
| 8 | Water hydrant (X0325790) | EACH | 4 | $2,850.00 |
| 9 | Info kiosk complete (X0326406) | EACH | 2 | $26,000 |
| 10 | Scarify EX surface (X0327171) | SY | 2,016 | $4.50 |
| 11 | Large entrance sign (X0327592) | EACH | 1 | $24,500 |
| 12 | SLR LED LGHT unit CMP (X1400225) | EACH | 1 | $10,500 |
| 13 | Luminaire replacement SPL (X1400403) | EACH | 1 | $4,200.00 |
| 14 | Lighting assembly SPL (X1400431) | EACH | 10 | $7,500.00 |
| 15 | Bit surf treatmnt A3 (X1500006) | SY | 8,919 | $7.00 |
| 16 | Campsite marker (X2600033) | EACH | 51 | $275.00 |
| 17 | Bit matls FS (X4060107) | LB | 774 | $7.50 |
| 18 | HMA surf rem var DP (X4401198) | SY | 447 | $31.00 |
| 19 | Concrete removal SPL (X5012501) | SY | 21 | $150.00 |
| 20 | San sew remov 6 (X5510306) | LF | 6 | $56.00 |
| 21 | Concrete island SPL (X6061055) | SF | 277 | $19.00 |
| 22 | Traf bar term TY 1 (X6310164) | EACH | 2 | $3,300.00 |
| 23 | Traf cont & prot SPL (X7010216) | LS | 1 | $56,000 |
| 24 | Small entrance sign (X7200066) | EACH | 15 | $4,700.00 |
| 25 | Wood sin support SPL (X7300105) | LF | 921 | $42.00 |
| 26 | EV charging sta compl (X8000004) | EACH | 2 | $17,500 |
| 27 | Conduit splice (X8100105) | EACH | 2 | $870.00 |
| 28 | Aerial cable removal (X8180064) | LF | 125 | $10.00 |
| 29 | Construction layout (Z0013798) | LS | 1 | $25,000 |
| 30 | Rumble strip (Z0055300) | EACH | 5 | $4,200.00 |
| 31 | San sew 4 (Z0056700) | LF | 21 | $211.00 |
| 32 | San sew 6 (Z0056800) | LF | 3 | $353.00 |
| 33 | Tree remov 6-15 (20100110) | UNIT | 154 | $55.00 |
| 34 | Tree remov over 15 (20100210) | UNIT | 54 | $95.00 |
| 35 | Earth excavation (20200100) | CY | 689 | $100.00 |
| 36 | Trench backfill (20800150) | CY | 252 | $60.00 |
| 37 | Topsoil F & P var DP (21101600) | SY | 825 | $28.00 |
| 38 | Grading & shap ditch (21400100) | LF | 1,250 | $23.00 |
| 39 | Seeding CL 2A (25000210) | ACRE | 0.50 | $7,800.00 |
| 40 | Nitrogen fert nutr (25000400) | LB | 27 | $1.80 |
| 41 | Phosphorus fert nutr (25000500) | LB | 27 | $1.80 |
| 42 | Potassium fert nutr (25000600) | LB | 27 | $1.80 |
| 43 | Mulch method 2 (25100115) | ACRE | 0.50 | $5,000.00 |
| 44 | Temp eros contr seed (28000250) | LB | 50 | $7.00 |
| 45 | Inlet & pipe protect (28000500) | EACH | 37 | $590.00 |
| 46 | Agg base cse B 4 (35101600) | SY | 341 | $13.50 |
| 47 | Agg base cse B 6 (35101800) | SY | 6,514 | $25.00 |
| 48 | Agg base cse B 8 (35102000) | SY | 3,048 | $27.00 |
| 49 | Agg surf course TY B (40200800) | TON | 426 | $93.00 |
| 50 | Bit matls tack CT (40600290) | LB | 16,114 | $1.10 |
| 51 | Temporary ramp (40600990) | SY | 173 | $22.00 |
| 52 | HMA BC IL-9.5FG N70 (40602970) | TON | 257 | $150.00 |
| 53 | HMA SC IL-9.5 C N70 (40604052) | TON | 4,904 | $160.00 |
| 54 | Welded wire reinf (42000060) | SY | 265 | $8.00 |
| 55 | PCC PVT 6 (42000100) | SY | 234 | $85.00 |
| 56 | PC conc sidewalk 6 (42400300) | SF | 2,489 | $17.00 |
| 57 | Detectable warnings (42400800) | SF | 18 | $30.00 |
| 58 | Pavement rem (44000100) | SY | 3,334 | $39.00 |
| 59 | Sidewalk rem (44000600) | SF | 2,577 | $6.50 |
| 60 | CL D patch T2 5 (44201705) | SY | 170 | $98.00 |
| 61 | CL D patch T3 5 (44201709) | SY | 407 | $98.00 |
| 62 | CL D patch T4 5 (44201711) | SY | 2,783 | $101.00 |
| 63 | Agg wedge SHLD type B (48102100) | TON | 426 | $58.00 |
| 64 | Pipe culvert remov (50105220) | LF | 1,581 | $33.00 |
| 65 | P cul CL A 1 10 (542A0215) | LF | 48 | $140.00 |
| 66 | P cul CL A 1 12 (542A0217) | LF | 200 | $94.00 |
| 67 | P cul CL A 1 15 (542A0220) | LF | 80 | $121.00 |
| 68 | P cul CL A 1 18 (542A0223) | LF | 64 | $122.00 |
| 69 | P cul CL A 1 21 (542A0226) | LF | 32 | $172.00 |
| 70 | P cul CL A 1 30 (542A0235) | LF | 40 | $222.00 |
| 71 | P cul CL A 2 12 (542A1057) | LF | 40 | $139.00 |
| 72 | P cul CL A 2 24 (542A1069) | LF | 48 | $158.00 |
| 73 | P cul CL A 2 60 (542A1105) | LF | 112 | $391.00 |
| 74 | P cul CL A 1 eqrs 18 (542A5473) | LF | 18 | $232.00 |
| 75 | P cul CL A 1 eqrs 24 (542A5479) | LF | 88 | $235.00 |
| 76 | P cul CL A 1 eqrs 48 (542A5503) | LF | 32 | $570.00 |
| 77 | P cul CL D 1 8 (542D0213) | LF | 217 | $88.00 |
| 78 | P cul CL D 1 10 (542D0215) | LF | 25 | $97.00 |
| 79 | P cul CL D 1 12 (542D0217) | LF | 276 | $98.00 |
| 80 | P cul CL D 1 15 (542D0220) | LF | 22 | $115.00 |
| 81 | PRC flar end sec 10 (54213655) | EACH | 4 | $1,700.00 |
| 82 | PRC flar end sec 12 (54213657) | EACH | 10 | $1,900.00 |
| 83 | PRC flar end sec 15 (54213660) | EACH | 6 | $2,100.00 |
| 84 | PRC flar end sec 18 (54213663) | EACH | 2 | $2,300.00 |
| 85 | PRC flar end sec 21 (54213666) | EACH | 2 | $2,450.00 |
| 86 | PRC flar end sec 24 (54213669) | EACH | 2 | $2,650.00 |
| 87 | PRC flar end sec 30 (54213675) | EACH | 2 | $3,000.00 |
| 88 | PRC flar end sec 60 (54213705) | EACH | 4 | $9,900.00 |
| 89 | End sec eqv R-S 18 (54214293) | EACH | 2 | $2,500.00 |
| 90 | End sec eqv R-S 24 (54214299) | EACH | 6 | $3,000.00 |
| 91 | End sec eqv R-S 48 (54214323) | EACH | 2 | $7,300.00 |
| 92 | Metal FL end sec 8" (54262708) | EACH | 16 | $640.00 |
| 93 | Metal FL end sec 10" (54262710) | EACH | 2 | $650.00 |
| 94 | Metal FL end sec 12" (54262712) | EACH | 12 | $1,150.00 |
| 95 | Metal FL end sec 15" (54262715) | EACH | 2 | $1,200.00 |
| 96 | Water serv line 1 (56200300) | LF | 116 | $37.00 |
| 97 | Valve box adj (60266600) | EACH | 1 | $570.00 |
| 98 | Comb CC&G TB6.12 (60603800) | LF | 213 | $77.00 |
| 99 | Conc median surf 4 (60618300) | SF | 235 | $15.00 |
| 100 | SPBGR TY A 6FT posts (63000001) | LF | 60 | $33.00 |
| 101 | Non-blocked SPBGR 9FT P (63000022) | LF | 1,066 | $43.00 |
| 102 | Traf bar term T2 (63100045) | EACH | 2 | $2,200.00 |
| 103 | Guardrail remov (63200310) | LF | 1,195 | $5.50 |
| 104 | Mobilization (67100100) | LS | 1 | $124,000 |
| 105 | Sign panel T1 (72000100) | SF | 438 | $81.00 |
| 106 | Remov sin pan assy TA (72400100) | EACH | 53 | $290.00 |
| 107 | Terminal marker - DA (72501000) | EACH | 2 | $55.00 |
| 108 | Metal post TY A (72900100) | LF | 189 | $84.00 |
| 109 | THPL PVT MK LTR & sym (78000100) | SF | 57 | $54.00 |
| 110 | THPL PVT MK line 4 (78000200) | LF | 8,198 | $9.00 |
| 111 | THPL PVT MK line 12 (78000600) | LF | 354 | $28.00 |
| 112 | Grdrail ref type B (78200006) | EACH | 15 | $11.00 |
| 113 | Undrgrd C galvs 3 (81028220) | LF | 224 | $77.00 |
| 114 | Undrgrd C PVC 1 1/2 (81028340) | LF | 1,901 | $33.00 |
| 115 | Handhole PCC (81400700) | EACH | 1 | $4,600.00 |
| 116 | EC C XLP use 1C 12 (81702100) | LF | 165 | $6.00 |
| 117 | EC C XLP use 1C 8 (81702120) | LF | 5,902 | $2.70 |
| 118 | Rem LT unit salv (84200500) | EACH | 4 | $1,050.00 |
| 119 | Rem elcbl FR con (89502300) | LF | 233 | $3.60 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.