IDOT letting results, June 16, 2023
218 contracts let by Illinois DOT on June 16, 2023, $801,344,382 in low bids, a median of 2 bidders per contract.
- Owner
- Illinois DOT
- Contracts
- 218
- Low bids, total
- $801,344,382
- Data through
- 18 SEP 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| 64B13 | Section (201-3)K | District 02 | 3 | Curran Contracting Company and Civil Constructors, Inc. d/b/a Helm Civil Joint Venture | $98,823,286 | $107,293,682 | +9.0% | IDOT |
| 95893 | Decatur, section 09-00933-01-BR | District 07 | 2 | William Charles Construction Company, LLC and White Construction, LLC JV | $68,927,124 | $69,706,717 | +1.0% | IDOT |
| 62P71 | Section 2021-154-R | District 01 | 5 | D. Construction, Inc. | $55,371,028 | $56,911,032 | +3.0% | IDOT |
| 78599 | Section (91-3,91-1,44-1-1,44-1)RS-3 | District 09 | 4 | Plote Construction, Inc. | $36,839,730 | $37,775,491 | +3.0% | IDOT |
| 68F89 | Section (37-24;48-24,25,26-1)RS-4 | District 04 | 1 | Gunther Construction & Advanced Asphalt Company JV | $28,792,543 | IDOT | ||
| 74800 | Section 50,51,52 | District 07 | 1 | Illinois Valley Paving, a div of UCM, Inc. | $24,477,448 | IDOT | ||
| 78912 | Section X1-2,44-(2,3,4,5)RS-2;D9 | District 09 | 2 | Samron Midwest Contracting, Inc. | $21,648,901 | $22,160,748 | +2.0% | IDOT |
| 62H82 | Section 2019-001-R | District 01 | 4 | Judlau Contracting, Inc. | $20,567,520 | $21,057,862 | +2.0% | IDOT |
| 62G41 | Section 8HB-2 | District 01 | 3 | Martam Construction Incorporated and Dunnet Bay Construction Company JV | $18,715,185 | $19,826,000 | +6.0% | IDOT |
| 76R40 | Section 60-(12,13,14)RS-3,(60-9)RS-3 | District 08 | 2 | The Kilian Corporation | $15,205,837 | $16,953,502 | +11% | IDOT |
| 62H52 | Section 2018-125-B-R | District 01 | 3 | D. Construction, Inc. | $14,441,528 | $16,470,631 | +14% | IDOT |
| 62G38 | Section (22&23)TS-1 | District 01 | 2 | D. Construction, Inc. | $12,192,447 | $12,295,726 | +1.0% | IDOT |
| 95901 | St. Francisville, section 15-00018-00-BR | District 07 | 2 | Samron Midwest Contracting, Inc. | $11,635,682 | $12,368,174 | +6.0% | IDOT |
| 74477 | Section 135RS-4 | District 07 | 1 | Illinois Valley Paving, a div of UCM, Inc. | $11,583,263 | IDOT | ||
| 76L18 | Section (105,3-2,410,411)RS-4 | District 08 | 2 | Illinois Valley Paving, a div of UCM, Inc. | $11,557,794 | $11,668,211 | +1.0% | IDOT |
| 74799 | Section (101,103)RS-2 | District 07 | 1 | Illinois Valley Paving, a div of UCM, Inc. | $10,801,690 | IDOT | ||
| 72799 | Section (135RS-7, | District 06 | 1 | Illinois Valley Paving, a div of UCM, Inc. | $10,483,427 | IDOT | ||
| 62G37 | Section 212-0103 | District 01 | 2 | K-Five Construction Corporation | $9,496,988 | $9,573,400 | +1.0% | IDOT |
| 70D61 | Section (74-68)BR | District 05 | 2 | White Construction LLC | $8,349,591 | $8,624,680 | +3.0% | IDOT |
| 61H85 | Aurora, section 06-00260-02-PV | District 01 | 4 | R. W. Dunteman Company | $8,184,713 | $8,234,106 | +1.0% | IDOT |
| 62J41 | Section 2019-074-SW&I | District 01 | 3 | Campanella and Sons, Inc. | $7,886,157 | $8,873,061 | +13% | IDOT |
| 74A06 | Section (21XNRH,21NRH | District 07 | 1 | Ambraw Asphalt Materials, Inc. | $7,826,400 | IDOT | ||
| 72F56 | Section (6RS-4,5RS-6)SR,145RS-5 | District 06 | 1 | Illinois Valley Paving, a div of UCM, Inc. | $7,556,572 | IDOT | ||
| 70A87 | Section (10-30)BR | District 05 | 3 | Sangamo Construction Company | $7,370,308 | $7,908,985 | +7.0% | IDOT |
| 74975 | Section 121RS-4,122RS-5 | District 07 | 1 | Howell Paving, Inc. | $7,289,962 | IDOT | ||
| 78524 | Section 110(W-2,RS-5) | District 09 | 2 | Samron Midwest Contracting, Inc. | $7,246,220 | $8,075,622 | +11% | IDOT |
| 72G52 | Section 86RS-3,114RS-4,6RS-5,SR1 | District 06 | 1 | Illinois Valley Paving, a div of UCM, Inc. | $5,940,696 | IDOT | ||
| 78877 | Section (138D-BR)I-9 | District 09 | 2 | Samron Midwest Contracting, Inc. | $5,868,810 | $6,728,315 | +15% | IDOT |
| 62K04 | Section 2019-131-TS&N | District 01 | 3 | R. W. Dunteman Company | $5,675,641 | $5,869,704 | +3.0% | IDOT |
| 72M78 | Section (110)RS-6,(111)RS-5 | District 06 | 1 | Illinois Valley Paving, a div of UCM, Inc. | $5,455,763 | IDOT | ||
| 61J09 | Schaumburg, section 18-00132-00-PV | District 01 | 3 | R. W. Dunteman Company | $5,220,905 | $5,279,853 | +1.0% | IDOT |
| 74977 | Section 7RS-1 | District 07 | 1 | Howell Paving, Inc. | $4,953,553 | IDOT | ||
| 72984 | Section 18(B-2,B-3);16(CR) | District 06 | 1 | Plocher Construction Company, Inc. | $4,885,000 | IDOT | ||
| 72A75 | Section (84-2-2)RS-2,Q;(79Z)RS-6 | District 06 | 1 | Illinois Valley Paving, a div of UCM, Inc. | $4,597,033 | IDOT | ||
| 74B09 | Section (18,19,20)RS-4 | District 07 | 1 | Howell Paving, Inc. | $4,525,156 | IDOT | ||
| 70A93 | Section (104)RS-2 | District 05 | 2 | Cross Construction, Inc. | $4,336,940 | $4,443,002 | +2.0% | IDOT |
| 78945 | Section (X1-7-1)B-2 | District 09 | 2 | Samron Midwest Contracting, Inc. | $4,288,284 | $4,337,197 | +1.0% | IDOT |
| 66B05 | Section (28,29)RS-3 | District 03 | 2 | Advanced Asphalt Company | $4,236,173 | $4,278,009 | +1.0% | IDOT |
| 62N88 | Section 2021-057-N | District 01 | 3 | Iroquois Paving Corporation | $4,196,716 | $4,376,408 | +4.0% | IDOT |
| 62U26 | Section FAI | District 01 | 2 | DeLong's Inc. of Missouri | $4,017,035 | $4,092,990 | +2.0% | IDOT |
| 70A88 | Section (27)RS-3,(28)RS-5&(27,28)BR-1 | District 05 | 2 | Kankakee Valley Construction Company, Inc. | $3,924,420 | $4,048,816 | +3.0% | IDOT |
| 72G51 | Section 6RS-6,81RS-5 | District 06 | 2 | K. E. Vas Company | $3,863,258 | $4,040,165 | +5.0% | IDOT |
| 70908 | Section (10-31HB)BR | District 05 | 3 | Sangamo Construction Company | $3,830,423 | $4,182,826 | +9.0% | IDOT |
| 68862 | Section (Z-2C-15D)BR-1 | District 04 | 2 | Stark Excavating, Inc. | $3,713,452 | $3,830,000 | +3.0% | IDOT |
| 62T53 | Section 2023 | District 01 | 3 | H & H Electric Co. | $3,706,914 | $4,391,111 | +18% | IDOT |
| 72656 | Section 9RS-3,10RS-2 | District 06 | 2 | Illinois Valley Paving, a div of UCM, Inc. | $3,506,197 | $3,770,350 | +8.0% | IDOT |
| 76R53 | Section DIST | District 08 | 1 | Illini Excavation & Reclamation, Inc. | $3,352,376 | IDOT | ||
| 46624 | Section D | District 01 | 1 | Superior Road Striping, Inc. | $3,228,282 | IDOT | ||
| 99700 | Project Number: 8T70-115 / /, section 21-00163-00-BT | District 09 | 2 | Samron Midwest Contracting, Inc. | $3,086,491 | $3,463,631 | +12% | IDOT |
| 93805 | Project Number: Gbuw-998 / /, section 19-00109-00-RS | District 06 | 3 | Illinois Valley Paving, a div of UCM, Inc. | $3,045,731 | $3,075,834 | +1.0% | IDOT |
| 74A88 | Section (6,7)RS-2 | District 07 | 1 | Howell Paving, Inc. | $2,949,123 | IDOT | ||
| 46620 | Section D | District 01 | 1 | Preform Traffic Control Systems, Ltd. | $2,944,000 | IDOT | ||
| 46615 | Section D | District 04 | 2 | RoadSafe Traffic Systems, Inc. | $2,865,095 | $3,279,611 | +14% | IDOT |
| 76P08 | Section (Z-1)PS-2,29PS-2 | District 08 | 1 | Haier Plumbing and Heating, Inc. | $2,785,320 | IDOT | ||
| 72136 | Section (86-8)BDR1,BJR1,BRR1,BP | District 06 | 1 | Freesen, a div of UCM, Inc. | $2,757,903 | IDOT | ||
| 74812 | Section 111 | District 07 | 2 | Howell Paving, Inc. | $2,757,361 | $3,560,100 | +29% | IDOT |
| 76P65 | Section 32RS-6 | District 08 | 2 | Christ Bros. Asphalt, Inc. | $2,744,682 | $2,930,254 | +7.0% | IDOT |
| 76R83 | Section 95-(5,6)PP | District 08 | 2 | The Kilian Corporation | $2,704,152 | $2,828,039 | +5.0% | IDOT |
| 66N28 | Section D3 | District 03 | 2 | Northern Contracting, Inc. | $2,597,629 | $2,796,990 | +8.0% | IDOT |
| 78882 | Section D9 | District 09 | 2 | Civil Coatings and Construction Inc. | $2,570,899 | $3,125,675 | +22% | IDOT |
| 64F57 | Section 115BC | District 02 | 1 | Martin & Company Excavating | $2,530,997 | IDOT | ||
| 78982 | Section (64-3B)BDR-1 | District 09 | 1 | E. T. Simonds Construction Company | $2,434,986 | IDOT | ||
| 78792 | Section 103B-3 | District 09 | 2 | E. T. Simonds Construction Company | $2,433,895 | $3,338,031 | +37% | IDOT |
| 74A13 | Section 3-1BR | District 07 | 2 | Plocher Construction Company, Inc. | $2,319,476 | $2,495,681 | +8.0% | IDOT |
| 78986 | Section D9 | District 09 | 2 | E. T. Simonds Construction Company | $2,211,144 | $2,538,700 | +15% | IDOT |
| 46623 | Section D | District 06 | 1 | Varsity Striping & Construction Co. | $2,196,936 | IDOT | ||
| 78790 | Section 123B-5;123B-6;123B-7 | District 09 | 2 | E. T. Simonds Construction Company | $2,188,576 | $2,797,973 | +28% | IDOT |
| 78926 | Section (20,2-1,37,2)RS-2 | District 09 | 2 | Samron Midwest Contracting, Inc. | $2,117,873 | $2,258,397 | +7.0% | IDOT |
| 97800 | Jerseyville, section 20-00040-00-PV | District 08 | 1 | Stutz Excavating, Inc. | $2,034,135 | IDOT | ||
| 70D69 | Section (10-6)BDR | District 05 | 1 | Stark Excavating, Inc. | $1,999,987 | IDOT | ||
| 89779 | Project Number: Zh0Y-896 / /, section 18-00166-00-BR | District 04 | 2 | Otto Baum Company, Inc. | $1,998,400 | $2,086,174 | +4.0% | IDOT |
| 46932 | Section FITZGERRELL | District 09 | 2 | E. T. Simonds Construction Company | $1,974,520 | $2,373,135 | +20% | IDOT |
| 99698 | Project Number: 1M27-802 / /, section 16-00075-00-RS | District 09 | 1 | E. T. Simonds Construction Company | $1,861,497 | IDOT | ||
| 74651 | Section (18BY)B | District 07 | 2 | E. T. Simonds Construction Company | $1,840,237 | $2,497,583 | +36% | IDOT |
| 46621 | Section D | District 01 | 3 | Precision Pavement Markings Inc. | $1,816,500 | $1,824,000 | 0.0% | IDOT |
| 95935 | Project Number: H3W1-465 / /, section 11-00094-00-RS | District 07 | 1 | Howell Paving, Inc. | $1,759,700 | IDOT | ||
| 68H58 | Section D4 | District 04 | 4 | Eagle Painting & Maintenance Company, Inc. | $1,739,800 | $1,750,000 | +1.0% | IDOT |
| 97812 | Project Number: 0C9Y-856 / /, section 18-00141-03-BR | District 08 | 2 | C-Hill Civil Contractors, Inc. | $1,717,889 | $2,067,095 | +20% | IDOT |
| 76R50 | Section DIST | District 08 | 2 | Keeley & Sons, Inc. | $1,706,661 | $1,739,928 | +2.0% | IDOT |
| 62R88 | Section FAI | District 01 | 4 | D. Construction, Inc. | $1,656,000 | $1,791,993 | +8.0% | IDOT |
| 61J44 | Elgin, section 21-00190-00-RS | District 01 | 4 | J. A. Johnson Paving Company | $1,652,700 | $1,662,182 | +1.0% | IDOT |
| 64P63 | Section (107B-1)BDR&(107VB-2)BDR | District 02 | 2 | Civil Constructors, Inc. d/b/a/ Helm Civil | $1,610,549 | $2,069,154 | +28% | IDOT |
| 78917 | Section D9 | District 09 | 2 | E. T. Simonds Construction Company | $1,602,470 | $1,927,406 | +20% | IDOT |
| 78959 | Section (02-1B-1)BRR-1 | District 09 | 2 | Samron Midwest Contracting, Inc. | $1,540,668 | $1,655,971 | +7.0% | IDOT |
| 76R52 | Section DIST | District 08 | 1 | Electrico, Inc. | $1,529,701 | IDOT | ||
| 64R55 | Section (106 | District 02 | 3 | Civil Constructors, Inc. d/b/a/ Helm Civil | $1,495,293 | $1,526,480 | +2.0% | IDOT |
| 68H11 | Section (11R)W-2 | District 04 | 1 | R. A. Cullinan and Son, a div of UCM, Inc. | $1,488,251 | IDOT | ||
| 74B23 | Section (22,5)RS-3 | District 07 | 1 | Ne-Co Asphalt Co., Inc. | $1,477,664 | IDOT | ||
| 62U63 | Section FAI | District 01 | 4 | Martam Construction Incorporated | $1,461,679 | $1,476,072 | +1.0% | IDOT |
| 97804 | Project Number: Npgy-195 / /, section 20-00061-01-RS | District 08 | 1 | Christ Bros. Asphalt, Inc. | $1,435,980 | IDOT | ||
| 76R92 | Section 73BP-3 | District 08 | 4 | Civil Coatings and Construction Inc. | $1,432,548 | $1,859,707 | +30% | IDOT |
| 99710 | Project Number: Q894-360 / /, section 19-00115-00-RS | District 09 | 2 | E. T. Simonds Construction Company | $1,432,052 | $1,498,498 | +5.0% | IDOT |
| 95937 | Project Number: Ggvt-981 / /, section 20-00129-00-RS | District 07 | 1 | Ambraw Asphalt Materials, Inc. | $1,389,384 | IDOT | ||
| 78960 | Section (1R,20,23,26)RS-2 | District 09 | 2 | Samron Midwest Contracting, Inc. | $1,383,930 | $1,396,687 | +1.0% | IDOT |
| 91624 | Project Number: 0H1L-919 / /, section 22-00219-00-RS | District 05 | 3 | G. M. Sipes Construction, Inc. | $1,345,785 | $1,593,788 | +18% | IDOT |
| 70581 | Section 4BR | District 05 | 2 | Duce Construction Company | $1,337,000 | $1,473,763 | +10% | IDOT |
| 93804 | Project Number: Snj3-991 / /, section 18-00080-00-BR | District 06 | 3 | County Contractors, Inc. | $1,329,997 | $1,559,322 | +17% | IDOT |
| 76R93 | Section 82-5VB-BJR-1 | District 08 | 2 | Keeley & Sons, Inc. | $1,292,571 | $1,507,716 | +17% | IDOT |
| 46626 | Section D | District 01 | 2 | Superior Road Striping, Inc. | $1,279,775 | $1,310,747 | +2.0% | IDOT |
| 97813 | Project Number: Jzjc-803 / /, section 21-00268-06-RS | District 08 | 1 | The Kilian Corporation | $1,263,097 | IDOT | ||
| 99703 | Project Number: 3Ft5-307 / /, section 21-00084-00-RS | District 09 | 1 | E. T. Simonds Construction Company | $1,257,240 | IDOT | ||
| 97770 | Waterloo, section 20-00032-06-PV | District 08 | 2 | Baxmeyer Construction, Inc. | $1,197,128 | $1,262,715 | +5.0% | IDOT |
| 68H15 | Section 90-106X(VB,HB)BRR | District 04 | 2 | Otto Baum Company, Inc. | $1,191,200 | $1,216,835 | +2.0% | IDOT |
| 61J60 | Romeoville, section 22-00075-00-RS | District 01 | 4 | Gallagher Asphalt Corporation | $1,182,978 | $1,278,000 | +8.0% | IDOT |
| 76R58 | Section DIST | District 08 | 4 | Keeley & Sons, Inc. | $1,148,499 | $1,169,256 | +2.0% | IDOT |
| 74C18 | Section D7 | District 07 | 1 | Bodine Electric of Decatur | $1,099,033 | IDOT | ||
| 97713 | Project Number: 8Llp-842 / /, section 16-18113-00-BR | District 08 | 1 | Keller Construction, Inc. | $1,097,790 | IDOT | ||
| 74C05 | Section D7 | District 07 | 1 | Howell Paving, Inc. | $1,080,177 | IDOT | ||
| 99705 | Project Number: 9Ujc-992 / /, section 19-00161-00-RS | District 09 | 1 | E. T. Simonds Construction Company | $1,063,122 | IDOT | ||
| 61J38 | Flossmoor, section 15-00048-00-BR | District 01 | 4 | D. Construction, Inc. | $1,018,214 | $1,278,928 | +26% | IDOT |
| 76R73 | Section 248-PP-2 | District 08 | 3 | Kinney Contractors, Inc. | $997,922 | $1,085,975 | +9.0% | IDOT |
| 62T16 | Section FAP | District 01 | 6 | MYS, Incorporated | $945,438 | $980,579 | +4.0% | IDOT |
| 76R00 | Section 82-2L-1 | District 08 | 1 | Electrico, Inc. | $932,109 | IDOT | ||
| 64S04 | Section (195-2HB)BJR | District 02 | 3 | Martin & Company Excavating | $925,041 | $1,020,534 | +10% | IDOT |
| 85741 | Project Number: Ekfu-347 / /, section 21-00633-01-BT | District 02 | 3 | N-Trak Group LLC | $920,853 | $948,657 | +3.0% | IDOT |
| 62T47 | Section FAU | District 01 | 4 | Martam Construction Incorporated | $885,626 | $956,973 | +8.0% | IDOT |
| 78915 | Section 105CR-1;107CR-2 | District 09 | 3 | Sierra Bravo Contractors, LLC | $864,428 | $973,085 | +13% | IDOT |
| 76R01 | Section 82-4L-1 | District 08 | 1 | Electrico, Inc. | $862,601 | IDOT | ||
| 46625 | Section D | District 01 | 1 | Superior Road Striping, Inc. | $851,082 | IDOT | ||
| 97806 | Edwardsville, section 19-00113-00-PV | District 08 | 2 | Stutz Excavating, Inc. | $842,773 | $982,394 | +17% | IDOT |
| 72M80 | Section (1ZB1)BDR, | District 06 | 1 | County Contractors, Inc. | $823,204 | IDOT | ||
| 62T99 | Section FAP | District 01 | 4 | Copenhaver Construction, Inc. | $800,774 | $831,686 | +4.0% | IDOT |
| 46622 | Section D | District 01 | 2 | Precision Pavement Markings Inc. | $787,650 | $864,900 | +10% | IDOT |
| 93807 | Project Number: Te4W-214 / /, section 23-00009-01-PP | District 06 | 3 | P. H. Broughton & Sons, Inc. | $783,494 | $848,712 | +8.0% | IDOT |
| 61J59 | Wheeling, section 21-00091-00-RS | District 01 | 2 | Builders Paving, LLC | $782,668 | $914,418 | +17% | IDOT |
| 61J61 | Romeoville, section 22-00076-00-RS | District 01 | 4 | Austin Tyler Construction, Inc. | $777,617 | $805,314 | +4.0% | IDOT |
| 62L51 | Section 2020-073-RS | District 01 | 3 | MAT Construction Leasing, Inc. | $755,754 | $864,003 | +14% | IDOT |
| 99683 | Project Number: Bulq-095 / /, section 19-00181-00-SP | District 09 | 2 | E. T. Simonds Construction Company | $733,609 | $768,873 | +5.0% | IDOT |
| 46628 | Section D-6 | District 06 | 2 | RoadSafe Traffic Systems, Inc. | $724,188 | $1,223,628 | +69% | IDOT |
| 99701 | Project Number: P1Ul-168 / /, section 21-00215-00-RS | District 09 | 1 | E. T. Simonds Construction Company | $722,633 | IDOT | ||
| 99666 | Herrin, section 19-00072-00-RS | District 09 | 2 | Samron Midwest Contracting, Inc. | $673,149 | $686,376 | +2.0% | IDOT |
| 68H55 | Section (135)TS-2;(58CS)TS | District 04 | 2 | Oberlander Electric Co. | $672,500 | $696,413 | +4.0% | IDOT |
| 62P08 | Section 2021-070-CR | District 01 | 4 | Copenhaver Construction, Inc. | $666,506 | $707,059 | +6.0% | IDOT |
| 97801 | Alton, section 21-00231-03-SW | District 08 | 1 | Stutz Excavating, Inc. | $642,226 | IDOT | ||
| 66M76 | Section (111)CLV,CLV-1 | District 03 | 3 | D. Construction, Inc. | $627,241 | $707,289 | +13% | IDOT |
| 99708 | City Of Marion, section 19-00125-00-RS | District 09 | 2 | Samron Midwest Contracting, Inc. | $621,140 | $689,317 | +11% | IDOT |
| 78983 | Section D9 | District 09 | 2 | F. W. Electric, Inc. | $618,611 | $637,200 | +3.0% | IDOT |
| 87790 | Project Number: 1Nr2-411 / /, section 16-00133-00-BR | District 03 | 2 | Tobey's Construction & Cartage, Inc. | $613,170 | $718,350 | +17% | IDOT |
| 74C30 | Section D7 | District 07 | 2 | Kujo, Inc. | $609,300 | $1,104,721 | +81% | IDOT |
| 62U17 | Section IL | District 01 | 3 | Eagle Painting & Maintenance Company, Inc. | $598,044 | $683,300 | +14% | IDOT |
| 76R87 | Section DIST | District 08 | 2 | Wissehr Electric, Inc. | $587,933 | $630,564 | +7.0% | IDOT |
| 68H63 | Section (72-6HB-1)BJR,BRR | District 04 | 3 | Stark Excavating, Inc. | $559,300 | $668,900 | +20% | IDOT |
| 78974 | Section D9 | District 09 | 3 | E. T. Simonds Construction Company | $538,851 | $555,600 | +3.0% | IDOT |
| 87809 | Watseka, section 22-00066-00-RS | District 03 | 1 | Iroquois Paving Corporation | $537,824 | IDOT | ||
| 70G55 | Section D5 | District 05 | 2 | Bodine Electric of Decatur | $524,942 | $540,700 | +3.0% | IDOT |
| 62U20 | Section FAU | District 01 | 1 | ERA-Valdivia Contractors, Inc. | $521,589 | IDOT | ||
| 72709 | Section D6 | District 06 | 2 | Kinney Contractors, Inc. | $520,000 | $540,275 | +4.0% | IDOT |
| 46627 | Section D | District 01 | 1 | Superior Road Striping, Inc. | $510,312 | IDOT | ||
| 68H64 | Section (45)I-2 | District 04 | 1 | R. A. Cullinan and Son, a div of UCM, Inc. | $496,645 | IDOT | ||
| 70G15 | Section (57-17)RS | District 05 | 1 | Rowe Construction, a div of UCM, Inc. | $486,088 | IDOT | ||
| 46619 | Section D | District 05 | 3 | Varsity Striping & Construction Co. | $461,303 | $854,578 | +85% | IDOT |
| 76T02 | Section D8 | District 08 | 2 | Pyramid Electrical Contractors, Inc. | $451,300 | $541,088 | +20% | IDOT |
| 78996 | Section (64-3B)I-8 | District 09 | 1 | Samron Midwest Contracting, Inc. | $448,800 | IDOT | ||
| 68H36 | Section 72[4B,30;(3C)BR]SCR | District 04 | 2 | Stark Excavating, Inc. | $448,580 | $795,023 | +77% | IDOT |
| 91617 | Project Number: Rukh-033 / /, section 18-02155-00-BR | District 05 | 3 | Iroquois Paving Corporation | $447,972 | $475,906 | +6.0% | IDOT |
| 76R80 | Section 82-3HVB-2R-BP | District 08 | 7 | Eagle Painting & Maintenance Company, Inc. | $432,000 | $584,042 | +35% | IDOT |
| 76R54 | Section DIST | District 08 | 1 | Electrico, Inc. | $428,536 | IDOT | ||
| 64R57 | Section ILU | District 02 | 2 | William Charles Construction Co, LLC (d/b/a) William Charles Electric | $428,323 | $483,602 | +13% | IDOT |
| 72710 | Section (1I-2;3I-5)TR-1 | District 06 | 3 | Endrizzi Contracting, Inc | $415,940 | $485,130 | +17% | IDOT |
| 68H70 | Section (Y,126)PP-1; | District 04 | 1 | R. A. Cullinan and Son, a div of UCM, Inc. | $411,540 | IDOT | ||
| 68H67 | Section D4 | District 04 | 5 | Knapp Concrete Contractors, Inc. | $408,258 | $433,658 | +6.0% | IDOT |
| 70G18 | Section (FR)I-1 | District 05 | 1 | Rowe Construction, a div of UCM, Inc. | $407,070 | IDOT | ||
| 87807 | City Of Lasalle, section 22-00084-00-RS | District 03 | 1 | Advanced Asphalt Company | $400,127 | IDOT | ||
| 74B98 | Section D7 | District 07 | 2 | Samron Midwest Contracting, Inc. | $393,829 | $467,980 | +19% | IDOT |
| 87806 | Spring Valley, section 22-00058-00-RS | District 03 | 1 | Advanced Asphalt Company | $381,331 | IDOT | ||
| 66N26 | Section (TR | District 03 | 3 | D. Construction, Inc. | $375,288 | $499,992 | +33% | IDOT |
| 68H56 | Section D4 | District 04 | 2 | Laser Electric, Inc. | $369,353 | $383,146 | +4.0% | IDOT |
| 62U03 | Section FAU | District 01 | 1 | Lorig Construction Company | $361,958 | IDOT | ||
| 91633 | Project Number: Pbqu-630 / /, section 22-03123-00-BR | District 05 | 3 | C-Hill Civil Contractors, Inc. | $361,888 | $401,474 | +11% | IDOT |
| 68H03 | Section (55-1)RS-1;31RS-3;24RS-5 | District 04 | 1 | Gunther Construction, a div of UCM, Inc. | $359,699 | IDOT | ||
| 87836 | City Of Lasalle, section 23-00084-01-RS | District 03 | 1 | Advanced Asphalt Company | $353,063 | IDOT | ||
| 66N43 | Section (1BO)I,BC-4 | District 03 | 2 | All States Painting, Inc. | $349,800 | $610,063 | +74% | IDOT |
| 76T12 | Section 82-1-PS-6 | District 08 | 3 | Haier Plumbing and Heating, Inc. | $346,610 | $351,900 | +2.0% | IDOT |
| 62K05 | Section 2019-132-DM&T | District 01 | 5 | Martam Construction Incorporated | $345,708 | $478,415 | +38% | IDOT |
| 91634 | Project Number: Bkli-479 / /, section 22-14120-00-BR | District 05 | 3 | C-Hill Civil Contractors, Inc. | $343,888 | $348,870 | +1.0% | IDOT |
| 64R58 | Section ILU | District 02 | 2 | William Charles Construction Co, LLC (d/b/a) William Charles Electric | $335,994 | $352,683 | +5.0% | IDOT |
| 91632 | Project Number: Kukm-571 / /, section 22-03122-00-BR | District 05 | 3 | C-Hill Civil Contractors, Inc. | $333,888 | $382,947 | +15% | IDOT |
| 61J62 | Romeoville, section 22-00077-00-RS | District 01 | 4 | Austin Tyler Construction, Inc. | $331,797 | $376,142 | +13% | IDOT |
| 62T70 | Section FAP | District 01 | 2 | Denler, Inc. | $329,908 | $461,814 | +40% | IDOT |
| 68H66 | Section D4 | District 04 | 6 | Gensini Excavating, Inc. | $316,237 | $400,058 | +27% | IDOT |
| 85745 | Project Number: 3M66-595 / /, section 20-15134-00-BR | District 02 | 4 | Civil Constructors, Inc. d/b/a/ Helm Civil | $309,936 | $331,651 | +7.0% | IDOT |
| 70G45 | Section D5 | District 05 | 3 | Endrizzi Contracting, Inc | $305,750 | $385,000 | +26% | IDOT |
| 46616 | Section D4 | District 04 | 2 | P & P Construction Co. | $278,959 | $399,320 | +43% | IDOT |
| 70G27 | Section D5 | District 05 | 1 | Kujo, Inc. | $278,210 | IDOT | ||
| 78995 | Section D9 | District 09 | 1 | F. W. Electric, Inc. | $277,020 | IDOT | ||
| 68H61 | Section D4 | District 04 | 2 | Laser Electric, Inc. | $276,769 | $305,045 | +10% | IDOT |
| 76R74 | Section 14-14-RS-7 | District 08 | 2 | Christ Bros. Asphalt, Inc. | $263,913 | $290,307 | +10% | IDOT |
| 70G54 | Section D5 | District 05 | 2 | Champaign Signal and Lighting Co. A Division of Champaign Asphalt Company LLC | $259,200 | $264,582 | +2.0% | IDOT |
| 68H69 | Section (106,108)I;(107)I-1 | District 04 | 2 | Gunther Construction, a div of UCM, Inc. | $252,522 | $312,333 | +24% | IDOT |
| 72M53 | Section (J)BP | District 06 | 6 | Eagle Painting & Maintenance Company, Inc. | $216,315 | $239,997 | +11% | IDOT |
| 72044 | Section (8BR-6)BDR | District 06 | 4 | Freesen, a div of UCM, Inc. | $213,682 | $279,723 | +31% | IDOT |
| 72707 | Section 34-2DR | District 06 | 1 | Hoerr Construction, Inc. | $212,810 | IDOT | ||
| 76R69 | Section 60-1PP | District 08 | 2 | The Kilian Corporation | $201,360 | $225,681 | +12% | IDOT |
| 64S09 | Section (161-1HB-9)BJR | District 02 | 5 | Civil Constructors, Inc. d/b/a/ Helm Civil | $187,707 | $217,924 | +16% | IDOT |
| 76L48 | Section 60-7PS-2 | District 08 | 3 | Davinroy Mechanical Contractor, Inc. | $182,000 | $187,812 | +3.0% | IDOT |
| 46617 | Section D | District 05 | 1 | Varsity Striping & Construction Co. | $176,916 | IDOT | ||
| 72N45 | Section (3-VB)BRR | District 06 | 2 | White Construction LLC | $175,000 | $192,427 | +10% | IDOT |
| 72056 | Section V(BR)BDR | District 06 | 3 | Keller Construction, Inc. | $172,172 | $255,570 | +48% | IDOT |
| 72N44 | Section (69-8VB)BRR | District 06 | 3 | White Construction LLC | $161,000 | $184,362 | +15% | IDOT |
| 76T08 | Section (Z-1)PP | District 08 | 2 | Keeley & Sons, Inc. | $154,903 | $160,651 | +4.0% | IDOT |
| 68H65 | Section 38-PP | District 04 | 2 | Gunther Construction, a div of UCM, Inc. | $152,618 | $212,415 | +39% | IDOT |
| 72236 | Section (68-2)RS-8,(68-3)RS-6 | District 06 | 3 | DeLaurent Construction Co., Inc. | $149,137 | $181,891 | +22% | IDOT |
| 62T67 | Section FAP | District 01 | 2 | Denler, Inc. | $145,907 | $168,818 | +16% | IDOT |
| 68H38 | Section D4 | District 04 | 3 | The Daltons Inc. | $128,373 | $199,900 | +56% | IDOT |
| 64S08 | Section (161-1HB-5)BJR | District 02 | 5 | Civil Constructors, Inc. d/b/a/ Helm Civil | $125,695 | $160,943 | +28% | IDOT |
| 99702 | Project Number: Wl53-879 / /, section 22-00108-00-SP | District 09 | 3 | Midwest Fence Corporation | $122,345 | $161,952 | +32% | IDOT |
| 62T76 | Section FAP | District 01 | 2 | Denler, Inc. | $120,748 | $157,623 | +31% | IDOT |
| 72114 | Section 112DR | District 06 | 1 | Hoerr Construction, Inc. | $120,600 | IDOT | ||
| 87837 | Peru, section 22-00071-00-SW | District 03 | 3 | Gensini Excavating, Inc. | $119,776 | $126,049 | +5.0% | IDOT |
| 68H62 | Section 111-PP | District 04 | 2 | Gunther Construction, a div of UCM, Inc. | $118,583 | $163,185 | +38% | IDOT |
| 76R38 | Section 3-5CJS-1 | District 08 | 2 | Complete Asphalt Service Co. | $116,268 | $133,339 | +15% | IDOT |
| 72115 | Section (1-5)DR | District 06 | 2 | Hoerr Construction, Inc. | $77,640 | $77,996 | 0.0% | IDOT |
| 66M71 | Section (111, | District 03 | 3 | Denler, Inc. | $69,016 | $72,120 | +4.0% | IDOT |
| 64S16 | Section 106DM | District 02 | 1 | Fischer Excavating, Inc. | $57,911 | IDOT | ||
| 70G43 | Section D5 | District 05 | 2 | Champaign Signal and Lighting Co. A Division of Champaign Asphalt Company LLC | $56,318 | $87,090 | +55% | IDOT |
| 72075 | Section (102,110X-2)CJS | District 06 | 3 | Complete Asphalt Service Co. | $43,590 | $52,198 | +20% | IDOT |
| 64S03 | Section (161-1HB-3)BJR | District 02 | 6 | Path Construction Company, Inc. | $42,950 | $49,184 | +15% | IDOT |
| 72708 | Section (68,84-5-2HB-1)BRR | District 06 | 4 | Path Construction Company, Inc. | $37,500 | $37,644 | 0.0% | IDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than IDOT received, the others did not match their published totals and are left out.