Champaign Signal and Lighting Co. A Division of Champaign Asphalt Company LLC: IDOT bid record

Champaign Signal and Lighting Co. A Division of Champaign Asphalt Company LLC submitted 17 bids on Illinois DOT contracts in the data, from 11 JUN 2021 to 17 JAN 2025, and was the low bidder on 8 of them (47%). When it was not low, its total sat a median +14% above the low bid.

Owner
Illinois DOT
Low bid volume
$1,951,006
Latest bid
17 JAN 2025
Data through
18 SEP 2026
17Bids
8Low bids
47Win rate, percent
+14%Median gap to the low bid when not low, 9 bids

By year

YearBidsLow bidsWin rate
20215360%
20223133%
20234250%
20244250%
2025100%
Champaign Signal and Lighting Co. A Division of Champaign Asphalt Company LLC, IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 0514750%
District 07200%
District 0311100%
Champaign Signal and Lighting Co. A Division of Champaign Asphalt Company LLC, IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Lum LED rdwy H82110008EACH55 (100%)$700.00$964.16
Remov elect serv inst84500120EACH51 (20%)$2,300.00$936.00
Champaign Signal and Lighting Co. A Division of Champaign Asphalt Company LLC, IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Champaign Signal and Lighting Co. A Division of Champaign Asphalt Company LLC, IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
17 JAN 202570G85District 05Section D53 of 3$3,407,913+14%
20 SEP 202474D15District 07Section D72 of 2$124,700+156%
14 JUN 202470G90District 05Section (23)N2 of 2$497,770+2.0%
26 APR 202466N97District 03Section (20R)TS-11 of 1$299,323Low
19 JAN 202470H00District 05Section HMLT2024-11 of 4$279,850Low, 78% under the second
22 SEP 202370G26District 05Section HSIP2 of 3$2,090,015+53%
16 JUN 202370G43District 05Section D51 of 2$56,318Low, 55% under the second
16 JUN 202370G54District 05Section D51 of 2$259,200Low, 2.0% under the second
16 JUN 202370G55District 05Section D52 of 2$540,700+3.0%
17 JUN 202270F54District 05Section D52 of 2$1,698,047+14%
17 JUN 202270F71District 05Section HMLT2022-11 of 1$314,840Low
21 JAN 202274A74District 07Section D72 of 3$559,808+7.0%
05 NOV 202170E93District 05Section (47)TS-11 of 1$310,744Low
30 JUL 202170F31District 05Section D52 of 2$472,000+40%
11 JUN 202170F03District 05Section D51 of 4$128,858Low, 13% under the second
11 JUN 202170F22District 05Section 20223 of 4$1,115,500+19%
11 JUN 202170F32District 05Section D51 of 2$301,875Low, 19% under the second
Champaign Signal and Lighting Co. A Division of Champaign Asphalt Company LLC: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy