Laser Electric, Inc. submitted 55 bids on Illinois DOT contracts in the data, from 05 MAR 2021 to 31 JUL 2026, and was the low bidder on 29 of them (53%). When it was not low, its total sat a median +7.0% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $18,555,675
- Latest bid
- 31 JUL 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 15 | 7 | 47% |
| 2022 | 8 | 4 | 50% |
| 2023 | 8 | 6 | 75% |
| 2024 | 8 | 4 | 50% |
| 2025 | 10 | 5 | 50% |
| 2026 | 6 | 3 | 50% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 04 | 42 | 21 | 50% |
| District 03 | 5 | 4 | 80% |
| District 02 | 4 | 3 | 75% |
| District 05 | 2 | 0 | 0% |
| District 07 | 1 | 1 | 100% |
| District 06 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Elcbl C signal 14 5C | 87301245 | LF | 15 | 8 (53%) | $2.70 | $2.50 |
| Elcbl C signal 14 7C | 87301255 | LF | 12 | 8 (67%) | $3.30 | $2.90 |
| Cat 5 ethernet cable | X0326812 | LF | 11 | 8 (73%) | $4.10 | $5.50 |
| Undrgrd C PVC 2 | 81028350 | LF | 14 | 7 (50%) | $32.00 | $27.00 |
| Undrgrd C PVC 3 | 81028370 | LF | 11 | 7 (64%) | $37.20 | $41.58 |
| Luminaire MT BRKT SPL | X8210402 | EACH | 9 | 7 (78%) | $313.47 | $410.00 |
| CCTV dome camera HD | X0320023 | EACH | 8 | 7 (88%) | $4,586.02 | $6,355.00 |
| Drill EX handhole | 87900200 | EACH | 17 | 6 (35%) | $642.67 | $465.00 |
| Bkwy dev cou SS SCRN | 83800650 | EACH | 16 | 6 (38%) | $200.25 | $225.56 |
| TS backplate ret-refl | 88200510 | EACH | 15 | 6 (40%) | $290.00 | $302.01 |
| Sign panel T1 | 72000100 | SF | 12 | 6 (50%) | $81.00 | $31.00 |
| Elcbl C egrdc 6 1C | 87301900 | LF | 12 | 6 (50%) | $3.52 | $3.25 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Oberlander Electric Co. | 38 | 16 of 38 |
| Bodine Electric of Decatur | 12 | 5 of 12 |
| Gerstner Electric, Inc. | 5 | 3 of 5 |
| John Burns Construction Company | 4 | 1 of 4 |
| Helm Electric Facility Solutions, Inc. d/b/a Helm Electric | 3 | 1 of 3 |
| H & H Electric Co. | 2 | 0 of 2 |
| Electric Conduit Construction | 2 | 2 of 2 |
| William Charles Construction Co, LLC (d/b/a) William Charles Electric | 2 | 0 of 2 |
| Champaign Signal and Lighting Co. A Division of Champaign Asphalt Company LLC | 2 | 2 of 2 |
| McGinn & McGinn d/b/a Engel Electric Co. | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 31 JUL 2026 | 66T35 | District 03 | Section (46-2)HL | 1 of 3 | $447,135 | Low, 34% under the second |
| 12 JUN 2026 | 68K85 | District 04 | Section D4 | 2 of 2 | $822,171 | +4.0% |
| 12 JUN 2026 | 68K93 | District 04 | Section (72-7)L-1;[72(8,9);90-11]L-2 | 2 of 2 | $1,569,347 | +8.0% |
| 24 APR 2026 | 64V32 | District 02 | Section D2 | 1 of 1 | $424,500 | Low |
| 24 APR 2026 | 66T25 | District 03 | Section (06-2)HL | 3 of 4 | $776,720 | +52% |
| 27 FEB 2026 | 68K06 | District 04 | Section D4 | 1 of 2 | $764,783 | Low, 11% under the second |
| 19 SEP 2025 | 68K24 | District 04 | Section 72(7-9)L | 1 of 5 | $1,766,478 | Low, 4.0% under the second |
| 19 SEP 2025 | 68K25 | District 04 | Section 72[(8-9)L-1,(10)L];(90-11)L | 2 of 5 | $1,217,379 | +19% |
| 19 SEP 2025 | 68K26 | District 04 | Section D4 | 2 of 2 | $1,329,175 | +12% |
| 13 JUN 2025 | 68J79 | District 04 | Section (11)TS-5 | 1 of 2 | $233,127 | Low, 8.0% under the second |
| 13 JUN 2025 | 68J80 | District 04 | Section (116)TS-3 | 2 of 2 | $252,457 | +5.0% |
| 13 JUN 2025 | 68J81 | District 04 | Section (62-2)L | 2 of 2 | $705,668 | +6.0% |
| 25 APR 2025 | 68J27 | District 04 | Section D4 | 2 of 2 | $410,757 | +7.0% |
| 25 APR 2025 | 68K08 | District 04 | Section D4 | 1 of 1 | $189,900 | Low |
| 07 MAR 2025 | 68J86 | District 04 | Section D4 | 1 of 2 | $651,955 | Low, 5.0% under the second |
| 17 JAN 2025 | 66P97 | District 03 | Section D3 | 1 of 1 | $2,232,605 | Low |
| 02 AUG 2024 | 68J11 | District 04 | Section D4 | 2 of 2 | $1,276,902 | +6.0% |
| 14 JUN 2024 | 64T08 | District 02 | Section D2 | 1 of 1 | $155,725 | Low |
| 14 JUN 2024 | 64T25 | District 02 | Section (37,2,1)L | 2 of 2 | $352,450 | +71% |
| 14 JUN 2024 | 68J24 | District 04 | Section D4 | 1 of 1 | $516,745 | Low |
| 14 JUN 2024 | 68J25 | District 04 | Section (90-14)L-1 | 1 of 1 | $455,220 | Low |
| 26 APR 2024 | 68I05 | District 04 | Section (7)TS | 1 of 2 | $243,063 | Low, 29% under the second |
| 26 APR 2024 | 68J05 | District 04 | Section (9)TS-1 | 2 of 2 | $311,263 | +7.0% |
| 19 JAN 2024 | 70H00 | District 05 | Section HMLT2024-1 | 3 of 4 | $519,900 | +86% |
| 17 NOV 2023 | 68H77 | District 04 | Section D4 | 1 of 2 | $1,741,480 | Low, 16% under the second |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.