Electric Conduit Construction: IDOT bid record

Electric Conduit Construction submitted 20 bids on Illinois DOT contracts in the data, from 23 APR 2021 to 24 APR 2026, and was the low bidder on 3 of them (15%). When it was not low, its total sat a median +20% above the low bid.

Owner
Illinois DOT
Low bid volume
$2,081,754
Latest bid
24 APR 2026
Data through
18 SEP 2026
20Bids
3Low bids
15Win rate, percent
+20%Median gap to the low bid when not low, 17 bids

By year

YearBidsLow bidsWin rate
2021400%
20227229%
20235120%
2025100%
2026300%
Electric Conduit Construction, IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 011417%
District 034250%
District 04100%
District 02100%
Electric Conduit Construction, IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Trainees TPGZ0076604HR88 (100%)$15.00$15.00
TraineesZ0076600HR88 (100%)$0.80$0.80
Soil disposal analy66900530EACH106 (60%)$1,412.25$1,470.00
Reg sub mon66901006CAL DAY115 (45%)$1,029.00$820.00
Non SPL waste disposl66900200CY94 (44%)$66.15$92.99
Inductive loop detect88500100EACH54 (80%)$165.15$220.00
Lum LED UP sus E82110027EACH53 (60%)$2,659.18$4,304.55
Remov elect serv inst84500120EACH72 (29%)$1,334.15$936.00
Seeding CL 2A25000210ACRE62 (33%)$5,172.24$3,331.55
LP F M 15BC 10" X 8'83600365EACH62 (33%)$1,900.81$1,851.00
LT P A 47.5MH 15MA83050810EACH62 (33%)$5,334.97$5,375.00
Rem tower FDNX8420510EACH62 (33%)$1,944.99$3,020.00
Electric Conduit Construction, IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
H & H Electric Co.1211 of 12
Meade Inc.106 of 10
Hecker and Company, Inc.83 of 8
John Burns Construction Company74 of 7
Bodine Electric of Decatur21 of 2
Laser Electric, Inc.20 of 2
Home Towne Electric, Inc.22 of 2
Lyons Electric Company, Inc.20 of 2
Utility Dynamics Corporation20 of 2
Gerstner Electric, Inc.11 of 1
Electric Conduit Construction, IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
24 APR 202666T25District 03Section (06-2)HL2 of 4$628,432+23%
27 FEB 202661M20District 01Oak Lawn, section 24-00199-00-LT3 of 5$438,031+37%
27 FEB 202661M21District 01Oak Lawn, section 24-00198-00-LT3 of 5$450,999+38%
13 JUN 202562W15District 01Section FAI2 of 4$1,724,994+1.0%
17 NOV 202362R83District 01Section 20233 of 3$1,969,320+46%
22 SEP 202362U48District 01Section 20225 of 5$4,426,715+28%
16 JUN 202362T53District 01Section 20232 of 3$4,391,111+18%
10 MAR 202366N01District 03Section (06-61 of 2$406,731Low, 24% under the second
20 JAN 202362T54District 01Section 20232 of 4$3,709,908+7.0%
23 SEP 202261H96District 01Project Number: 9Ctw-805 / /, section 19-DCCSS-04-TL3 of 4$7,781,473+20%
23 SEP 202262N04District 01Section 2020-235-L2 of 3$6,419,242+6.0%
23 SEP 202262N05District 01Section 2020-236-L4 of 4$8,017,971+12%
23 SEP 202262R81District 01Section 20221 of 3$1,490,238Low, 2.0% under the second
23 SEP 202266M52District 03Section (32-3)HL1 of 1$184,785Low
29 APR 202266M01District 03Section (111)ELE3 of 4$371,320+3.0%
21 JAN 202262M92District 01Section 2020-218-L4 of 4$2,809,988+24%
05 NOV 202161H22District 01Project Number: Idld-702- / /, section 19-DCCSS-03-TL3 of 4$6,607,366+13%
05 NOV 202162M93District 01Section 2020-217-L2 of 4$309,116+40%
11 JUN 202185708District 02South Beloit, section 13-00040-01-BT5 of 5$544,002+43%
23 APR 202168G20District 04Section [62-2;102(1-4);57(2-4)]ITS4 of 7$2,068,600+13%
Electric Conduit Construction: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy