IDOT contract 62W15 bid tabulation

Section FAI. Let by Illinois DOT on June 13, 2025, Will, District 01. 4 bids received; low bid $1,709,237 by John Burns Construction Company.

Owner
Illinois DOT
Letting
13 JUN 2025
Pay items
51
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1John Burns Construction Company$1,709,237Low
2Electric Conduit Construction$1,724,994+1.0%
3Hecker and Company, Inc.$1,788,147+5.0%
4Meade Inc.$2,103,651+23%
IDOT contract 62W15: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. John Burns Construction Company2. Electric Conduit Construction3. Hecker and Company, Inc.4. Meade Inc.
1Rem HM lumnrs salvage (X1400190)EACH54$200.00$477.52$758.00$774.80
2Rem luminaire salvage (X1400341)EACH91$200.00$286.51$264.00$415.07
3L CT B 480V200D RS FO (X1400402)EACH1$50,000$58,171$64,700$60,303
4Eros cont blanket SPL (X2511630)SY2,103$2.70$2.82$3.00$5.25
5Engrs FLD ofc TY A D1 (X6700407)CAL MO18$5,000.00$4,399.80$4,900.00$9,450.00
6TR C-prot expressways (X7011015)LS1$30,000$101,063$97,600$44,100
7Temp info signing (X7200061)SF206$25.00$26.25$42.00$31.50
8Maint lighting systm (X8000003)CAL MO12$1,000.00$1,500.00$4,030.00$2,443.72
9Lum LED rdwy rod H (X8210007)EACH90$1,250.00$862.70$1,210.00$1,329.60
10Rem undpss LT unit NS (X8420111)EACH12$100.00$716.28$1,070.00$276.72
11Rem LT tower no salv (X8420502)EACH13$2,500.00$4,736.03$5,760.00$13,162
12Rem tower FDN (X8420510)EACH13$1,000.00$1,652.57$2,700.00$6,641.16
13Construction layout (Z0013798)LS1$5,000.00$22,050$10,600$10,500
14Lum sfty CBL assembly (Z0033020)EACH128$100.00$170.94$20.00$172.68
15Earth excavation (20200100)CY178$100.00$157.50$10.00$82.03
16Furnished excavation (20400800)CY57$70.00$262.50$10.00$127.60
17Topsoil exc & plac (21101505)CY407$35.00$42.00$10.00$29.17
18Topsoil F & P 6 (21101625)SY200$23.00$15.75$30.00$18.13
19Seeding CL 2A (25000210)ACRE0.75$4,060.00$3,675.00$5,000.00$4,957.68
20Nitrogen fert nutr (25000400)LB46$3.00$3.68$3.90$9.07
21Phosphorus fert nutr (25000500)LB46$3.00$3.68$3.90$7.86
22Potassium fert nutr (25000600)LB46$3.00$3.68$3.90$5.45
23Temp eros contr seed (28000250)LB300$6.00$16.28$6.00$7.86
24Temp ditch checks (28000305)LF200$14.00$7.35$18.00$21.87
25Non SPL waste disposl (66900200)CY135$75.00$107.10$170.00$157.50
26Soil disposal analy (66900530)EACH4$900.00$1,942.50$1,160.00$1,837.50
27Reg sub P-const plan (66901001)LS1$4,800.00$2,835.00$6,210.00$3,517.50
28Reg sub F con report (66901003)LS1$500.00$2,415.00$647.00$1,260.00
29Reg sub mon (66901006)CAL DAY20$740.00$1,050.00$958.00$735.00
30Mobilization (67100100)LS1$90,000$57,750$107,000$126,000
31Traf cont-prot 701421 (70100310)LS1$500.00$22,838$38,700$13,125
32Traf cont-prot 701411 (70100420)EACH6$500.00$525.00$897.00$13,125
33TR cont & prot 701601 (70102630)LS1$500.00$5,250.00$10,200$13,125
34TR cont surveillance (70103815)CAL DAY180$50.00$303.33$10.00$26.25
35Elect serv install (80400100)EACH1$7,500.00$7,930.26$3,160.00$5,462.44
36Elect util serv conn (80400200)LS1$10,000$10,000$10,000$10,000
37Undrgrd C galvs 4 (81028240)LF896$140.00$59.31$93.00$117.30
38Con at ST 1 PVC GS (81100320)LF560$80.00$110.29$80.00$94.01
39Jun BX SS as 6X6X4 (81300220)EACH12$1,000.00$2,034.16$1,500.00$1,174.14
40Jun BX SS as 12X10X6 (81300530)EACH6$1,775.00$2,142.59$1,780.00$1,659.01
41UD 3#2#4GXLPUSE 1.5 P (81603081)LF11,100$38.00$26.41$25.00$28.94
42EC C XLP use 1C 10 (81702110)LF1,310$15.00$20.17$7.00$17.12
43EC C XLP use 1C 350 (81702220)LF150$25.00$30.63$37.00$17.24
44Lum LED rdwy H (82110008)EACH23$900.00$764.22$860.00$706.46
45Lum LED rdwy I (82110009)EACH15$900.00$944.39$917.00$706.46
46Lum LED UP sus E (82110027)EACH12$3,000.00$5,762.72$3,750.00$4,777.94
47LT P A 47.5MH 15MA (83050810)EACH38$5,750.00$5,742.37$6,550.00$5,646.63
48LP F M 15BC 10" X 8' (83600365)EACH38$3,500.00$1,934.83$2,400.00$2,211.43
49Bkwy dev TR B 15BC (83800205)EACH38$1,200.00$835.00$1,010.00$604.11
50Remov lighting contr (84500110)EACH1$1,500.00$5,730.26$2,270.00$3,320.58
51Remov elect serv inst (84500120)EACH1$500.00$2,865.13$4,220.00$4,427.44
IDOT contract 62W15: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy