Hecker and Company, Inc.: IDOT bid record
Hecker and Company, Inc. submitted 32 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 31 JUL 2026, and was the low bidder on 8 of them (25%). When it was not low, its total sat a median +21% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $13,402,355
- Latest bid
- 31 JUL 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 8 | 3 | 38% |
| 2022 | 6 | 1 | 17% |
| 2023 | 4 | 1 | 25% |
| 2024 | 4 | 0 | 0% |
| 2025 | 3 | 2 | 67% |
| 2026 | 7 | 1 | 14% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Trainees TPG | Z0076604 | HR | 15 | 15 (100%) | $15.00 | $15.00 |
| Trainees | Z0076600 | HR | 15 | 15 (100%) | $0.80 | $0.80 |
| Inductive loop detect | 88500100 | EACH | 14 | 13 (93%) | $170.50 | $220.00 |
| Optim traf signal sys | Z0033056 | EACH | 10 | 7 (70%) | $7,070.00 | $6,220.24 |
| Reg sub mon | 66901006 | CAL DAY | 23 | 5 (22%) | $1,130.00 | $820.00 |
| Rod and clean EX cond | X0324599 | LF | 10 | 5 (50%) | $1.48 | $0.25 |
| Transceiver - fib opt | 86400100 | EACH | 7 | 5 (71%) | $5,080.00 | $5,454.00 |
| Rel EM veh PR sys P U | 89501410 | EACH | 7 | 5 (71%) | $97.70 | $231.30 |
| Lum sfty CBL assembly | Z0033020 | EACH | 5 | 5 (100%) | $25.50 | $262.75 |
| Lum sfty cable asmbly | Z0033020 | EACH | 5 | 5 (100%) | $19.00 | $165.00 |
| Soil disposal analy | 66900530 | EACH | 22 | 4 (18%) | $1,645.00 | $1,470.00 |
| Undrgrd C galvs 4 | 81028240 | LF | 18 | 4 (22%) | $74.50 | $69.04 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| H & H Electric Co. | 17 | 15 of 17 |
| Meade Inc. | 12 | 6 of 12 |
| John Burns Construction Company | 11 | 5 of 11 |
| Electric Conduit Construction | 8 | 5 of 8 |
| Home Towne Electric, Inc. | 6 | 3 of 6 |
| Thorne Electric, Inc. | 3 | 0 of 3 |
| J. Ranck Electric, Inc. | 3 | 0 of 3 |
| Lyons Electric Company, Inc. | 2 | 0 of 2 |
| Utility Dynamics Corporation | 2 | 1 of 2 |
| Sonoma Underground Services Inc. | 1 | 1 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 31 JUL 2026 | 62W91 | District 01 | Section 2024-966-TS | 2 of 3 | $2,726,629 | +55% |
| 12 JUN 2026 | 62W82 | District 01 | Section 2024-956-TS | 2 of 3 | $8,866,667 | +29% |
| 12 JUN 2026 | 62W83 | District 01 | Section 2024-957-TS | 2 of 4 | $2,326,258 | +13% |
| 12 JUN 2026 | 80C89 | District 01 | Section 2026-2160-TS | 2 of 2 | $3,939,373 | +45% |
| 27 FEB 2026 | 61M20 | District 01 | Oak Lawn, section 24-00199-00-LT | 4 of 5 | $475,619 | +49% |
| 27 FEB 2026 | 61M21 | District 01 | Oak Lawn, section 24-00198-00-LT | 5 of 5 | $546,573 | +67% |
| 27 FEB 2026 | 62W78 | District 01 | Section 2024-960-LT | 1 of 2 | $1,798,186 | Low, 2.0% under the second |
| 01 AUG 2025 | 62W57 | District 01 | Section 2023-941-N,TS | 1 of 1 | $2,599,373 | Low |
| 13 JUN 2025 | 62W15 | District 01 | Section FAI | 3 of 4 | $1,788,147 | +5.0% |
| 13 JUN 2025 | 62X42 | District 01 | Section 2024-1005-TS | 1 of 1 | $1,733,690 | Low |
| 20 SEP 2024 | 62U21 | District 01 | Section 2024-1011-TS,I,N,SW | 2 of 2 | $2,509,369 | +12% |
| 20 SEP 2024 | 62V17 | District 01 | Section FAP | 2 of 3 | $10,864,418 | +17% |
| 02 AUG 2024 | 62R82 | District 01 | Section 2022 | 2 of 3 | $2,692,983 | +20% |
| 14 JUN 2024 | 62W18 | District 01 | Section 23 | 2 of 2 | $1,797,854 | +74% |
| 22 SEP 2023 | 62D82 | District 01 | Section 2016-071L | 3 of 3 | $3,998,975 | +24% |
| 22 SEP 2023 | 62U32 | District 01 | Section 2023 | 1 of 2 | $2,055,975 | Low, 4.0% under the second |
| 22 SEP 2023 | 62U48 | District 01 | Section 2022 | 2 of 5 | $4,085,852 | +18% |
| 16 JUN 2023 | 62T53 | District 01 | Section 2023 | 3 of 3 | $4,393,197 | +19% |
| 23 SEP 2022 | 62N05 | District 01 | Section 2020-236-L | 3 of 4 | $7,726,652 | +8.0% |
| 05 AUG 2022 | LK015 | District 01 | Section LAKE | 2 of 2 | $1,165,782 | 0.0% |
| 17 JUN 2022 | 62P72 | District 01 | Section 2021-155-TS | 2 of 2 | $1,264,798 | +27% |
| 29 APR 2022 | 62G03 | District 01 | Section 2017-060TS | 1 of 1 | $509,914 | Low |
| 11 MAR 2022 | 61H61 | District 01 | Project Number: 0331-180 / /, section 20-00288-04-TL | 2 of 2 | $633,490 | +24% |
| 21 JAN 2022 | 62M92 | District 01 | Section 2020-218-L | 2 of 4 | $2,727,343 | +21% |
| 05 NOV 2021 | 62M93 | District 01 | Section 2020-217-L | 3 of 4 | $315,819 | +43% |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.