IDOT contract 62W78 bid tabulation
Section 2024-960-LT. Let by Illinois DOT on February 27, 2026, Lake, District 01. 2 bids received; low bid $1,798,186 by Hecker and Company, Inc..
- Owner
- Illinois DOT
- Letting
- 27 FEB 2026
- Pay items
- 70
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Hecker and Company, Inc. | $1,798,186 | Low |
| 2 | John Burns Construction Company | $1,842,867 | +2.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Hecker and Company, Inc. | 2. John Burns Construction Company |
|---|---|---|---|---|---|
| 1 | Rem HM lumnrs salvage (X1400190) | EACH | 26 | $547.00 | $250.00 |
| 2 | Rem luminaire salvage (X1400341) | EACH | 115 | $182.00 | $100.00 |
| 3 | L CT B 480V200D RS FO (X1400402) | EACH | 1 | $67,800 | $70,000 |
| 4 | Rem transform base salv (X1400507) | EACH | 1 | $92.50 | $75.00 |
| 5 | 6' D M arm alum 180AP (X1400510) | EACH | 29 | $1,590.00 | $2,510.00 |
| 6 | Clearing & grubbing (X2010510) | LS | 1 | $12,600 | $10,000 |
| 7 | Rem atten base (X6431110) | EACH | 1 | $366.00 | $7,500.00 |
| 8 | Rem imp atten SM (X6431120) | EACH | 12 | $279.00 | $600.00 |
| 9 | Engr FLD off A SPL (X6700410) | CAL MO | 18 | $9,302.75 | $6,000.00 |
| 10 | Traf cont & prot SPL (X7010216) | LS | 1 | $6,300.00 | $77,500 |
| 11 | TR C-prot expressways (X7011015) | LS | 1 | $129,000 | $500.00 |
| 12 | Maint lighting systm (X8000003) | CAL MO | 12 | $5,890.00 | $5,000.00 |
| 13 | Elect serv install & conn (X8040106) | EACH | 1 | $2,740.00 | $7,500.00 |
| 14 | Intercept EX conduit (X8100863) | EACH | 1 | $768.00 | $5,000.00 |
| 15 | Luminaire shield (X8210405) | EACH | 9 | $528.00 | $60.00 |
| 16 | LT pole bkwy device (X8380074) | EACH | 37 | $1,140.00 | $1,400.00 |
| 17 | Rem undpss LT unit NS (X8420111) | EACH | 12 | $665.00 | $300.00 |
| 18 | Rem LT tower salv (X8420500) | EACH | 5 | $9,130.00 | $8,150.00 |
| 19 | Rem LTG arm salv (X8420507) | EACH | 58 | $222.00 | $75.00 |
| 20 | Rem tower FDN (X8420510) | EACH | 5 | $2,690.00 | $2,350.00 |
| 21 | Construction layout (Z0013798) | LS | 1 | $10,100 | $5,000.00 |
| 22 | Lum sfty CBL assembly (Z0033020) | EACH | 151 | $25.50 | $160.00 |
| 23 | Trainees (Z0076600) | HR | 2,000 | $0.80 | $0.80 |
| 24 | Trainees TPG (Z0076604) | HR | 2,000 | $15.00 | $15.00 |
| 25 | Temporary fence (20101000) | LF | 930 | $6.00 | $5.80 |
| 26 | Earth excavation (20200100) | CY | 34.44 | $143.00 | $215.00 |
| 27 | Rem & disp uns matl (20201200) | CY | 34.44 | $249.00 | $50.00 |
| 28 | Topsoil F & P 12 (21101645) | SY | 206.70 | $29.50 | $27.85 |
| 29 | Topsoil F & P 24 (21101685) | SY | 5.70 | $54.50 | $51.00 |
| 30 | Seeding CL 2A (25000210) | ACRE | 0.25 | $4,678.00 | $4,380.00 |
| 31 | Nitrogen fert nutr (25000400) | LB | 5.50 | $3.20 | $3.00 |
| 32 | Phosphorus fert nutr (25000500) | LB | 5.50 | $3.20 | $3.00 |
| 33 | Potassium fert nutr (25000600) | LB | 5.50 | $3.20 | $3.00 |
| 34 | Mulch method 2 (25100115) | ACRE | 0.50 | $3,840.00 | $3,600.00 |
| 35 | Erosion contr blanket (25100630) | SY | 23 | $7.50 | $7.00 |
| 36 | Perimeter eros bar (28000400) | LF | 2,608 | $4.00 | $3.50 |
| 37 | Non SPL waste disposl (66900200) | CY | 35 | $256.00 | $85.00 |
| 38 | Soil disposal analy (66900530) | EACH | 1 | $1,780.00 | $1,450.00 |
| 39 | Reg sub P-const plan (66901001) | LS | 1 | $3,630.00 | $3,100.00 |
| 40 | Reg sub F con report (66901003) | LS | 1 | $534.00 | $1,200.00 |
| 41 | Reg sub mon (66901006) | CAL DAY | 6 | $801.00 | $680.00 |
| 42 | Mobilization (67100100) | LS | 1 | $108,000 | $109,580 |
| 43 | Traf cont-prot 701421 (70100310) | LS | 1 | $14,800 | $500.00 |
| 44 | Traf cont-prot 701411 (70100420) | EACH | 4 | $1,300.00 | $500.00 |
| 45 | TR cont & prot 701601 (70102630) | LS | 1 | $14,800 | $500.00 |
| 46 | TR cont & prot 701701 (70102635) | LS | 1 | $6,910.00 | $100.00 |
| 47 | TR cont surveillance (70103815) | CAL DAY | 280 | $1.00 | $1.00 |
| 48 | Night work zone light (70200100) | LS | 1 | $2,570.00 | $50.00 |
| 49 | Undrgrd C galvs 4 (81028240) | LF | 1,274 | $76.00 | $125.00 |
| 50 | Con at ST 1 PVC GS (81100320) | LF | 425 | $59.00 | $150.00 |
| 51 | Con at ST 3 PVC galvs (81100805) | LF | 36 | $205.00 | $355.00 |
| 52 | Jun BX SS as 6X6X4 (81300220) | EACH | 8 | $1,300.00 | $1,000.00 |
| 53 | Jun BX SS as 12X10X6 (81300530) | EACH | 4 | $1,940.00 | $1,850.00 |
| 54 | Jun BX SS as 18X18X8 (81300830) | EACH | 2 | $4,040.00 | $3,250.00 |
| 55 | UD 3#4#6GXLPUSE 1 1/4 (81603090) | LF | 6,286 | $27.50 | $33.00 |
| 56 | EC C XLP use 1C 10 (81702110) | LF | 1,520 | $4.95 | $9.80 |
| 57 | EC C XLP use 1C 350 (81702220) | LF | 35 | $113.00 | $120.00 |
| 58 | Lum LED rdwy G (82110007) | EACH | 121 | $1,200.00 | $1,300.00 |
| 59 | Lum LED rdwy H (82110008) | EACH | 30 | $923.00 | $1,300.00 |
| 60 | Lum LED UP sus E (82110027) | EACH | 8 | $2,770.00 | $4,700.00 |
| 61 | LT P A 35MH 15MA (83007600) | EACH | 9 | $5,210.00 | $4,300.00 |
| 62 | LT P A 47.5MH 15MA (83050810) | EACH | 28 | $6,890.00 | $6,000.00 |
| 63 | LP F M 11.5BC 8 5/8X6 (83600352) | EACH | 9 | $1,670.00 | $3,200.00 |
| 64 | LP F M 15BC 10" X 8' (83600365) | EACH | 28 | $2,585.00 | $3,400.00 |
| 65 | Rem LT unit salv (84200500) | EACH | 1 | $639.00 | $3,200.00 |
| 66 | Rem pole FDN (84200804) | EACH | 1 | $1,090.00 | $3,500.00 |
| 67 | Remov lighting contr (84500110) | EACH | 1 | $1,150.00 | $3,500.00 |
| 68 | Remov elect serv inst (84500120) | EACH | 1 | $727.00 | $3,500.00 |
| 69 | Remov LTG contr FDN (84500130) | EACH | 1 | $1,340.00 | $2,800.00 |
| 70 | Rem elcbl FR con (89502300) | LF | 2,643 | $1.80 | $0.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of February 27, 2026. Compiled by Mirage Metrics.