John Burns Construction Company: IDOT bid record
John Burns Construction Company submitted 38 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 31 JUL 2026, and was the low bidder on 9 of them (24%). When it was not low, its total sat a median +36% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $88,451,877
- Latest bid
- 31 JUL 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 5 | 0 | 0% |
| 2022 | 5 | 1 | 20% |
| 2023 | 2 | 2 | 100% |
| 2024 | 6 | 2 | 33% |
| 2025 | 13 | 4 | 31% |
| 2026 | 7 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 01 | 31 | 8 | 26% |
| District 04 | 3 | 0 | 0% |
| District 05 | 2 | 0 | 0% |
| District 03 | 2 | 1 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Trainees TPG | Z0076604 | HR | 22 | 22 (100%) | $15.00 | $15.00 |
| Trainees | Z0076600 | HR | 22 | 22 (100%) | $0.80 | $0.80 |
| Reg sub mon | 66901006 | CAL DAY | 25 | 17 (68%) | $725.00 | $820.00 |
| Soil disposal analy | 66900530 | EACH | 25 | 17 (68%) | $1,358.43 | $1,470.00 |
| Non SPL waste disposl | 66900200 | CY | 23 | 16 (70%) | $75.00 | $92.99 |
| Nitrogen fert nutr | 25000400 | LB | 16 | 12 (75%) | $4.50 | $3.00 |
| Potassium fert nutr | 25000600 | LB | 16 | 12 (75%) | $4.50 | $3.00 |
| Seeding CL 2A | 25000210 | ACRE | 14 | 11 (79%) | $4,690.00 | $3,331.55 |
| Drill EX handhole | 87900200 | EACH | 17 | 10 (59%) | $390.00 | $465.00 |
| Rem elcbl FR con | 89502300 | LF | 16 | 10 (63%) | $0.50 | $0.85 |
| THPL PVT MK line 12 | 78000600 | LF | 13 | 10 (77%) | $3.45 | $3.10 |
| Changeable message SN | 70107025 | CAL DAY | 12 | 10 (83%) | $37.50 | $55.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Meade Inc. | 14 | 8 of 14 |
| Hecker and Company, Inc. | 11 | 6 of 11 |
| H & H Electric Co. | 10 | 9 of 10 |
| Electric Conduit Construction | 7 | 3 of 7 |
| Gerstner Electric, Inc. | 4 | 4 of 4 |
| Laser Electric, Inc. | 4 | 3 of 4 |
| Lorig Construction Company | 3 | 2 of 3 |
| Alliance Contractors, Inc. | 3 | 2 of 3 |
| Copenhaver Construction, Inc. | 3 | 2 of 3 |
| Bodine Electric of Decatur | 3 | 3 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 31 JUL 2026 | 62W91 | District 01 | Section 2024-966-TS | 3 of 3 | $2,853,447 | +63% |
| 12 JUN 2026 | 62W82 | District 01 | Section 2024-956-TS | 3 of 3 | $11,922,775 | +73% |
| 12 JUN 2026 | 62W83 | District 01 | Section 2024-957-TS | 4 of 4 | $3,390,157 | +65% |
| 24 APR 2026 | 62Y28 | District 01 | Section 2025-1076-I | 2 of 2 | $13,924,157 | +44% |
| 24 APR 2026 | 66T25 | District 03 | Section (06-2)HL | 4 of 4 | $819,545 | +60% |
| 27 FEB 2026 | 62R19 | District 01 | Section FAI | 2 of 2 | $17,992,257 | +39% |
| 27 FEB 2026 | 62W78 | District 01 | Section 2024-960-LT | 2 of 2 | $1,842,867 | +2.0% |
| 07 NOV 2025 | 61L21 | District 01 | Rosemont, section 19-00035-00-SP | 2 of 2 | $4,409,000 | +6.0% |
| 19 SEP 2025 | 62W62 | District 01 | Section 2023-939-N,TS | 1 of 1 | $2,170,856 | Low |
| 19 SEP 2025 | 68K24 | District 04 | Section 72(7-9)L | 3 of 5 | $2,432,200 | +38% |
| 19 SEP 2025 | 68K25 | District 04 | Section 72[(8-9)L-1,(10)L];(90-11)L | 3 of 5 | $1,442,400 | +42% |
| 19 SEP 2025 | 70H51 | District 05 | Section HMLT2025-1 | 5 of 5 | $1,391,584 | +60% |
| 13 JUN 2025 | 62N39 | District 01 | Section 2020-266-SUR,SW&TS | 2 of 2 | $25,576,000 | +23% |
| 13 JUN 2025 | 62W15 | District 01 | Section FAI | 1 of 4 | $1,709,237 | Low, 1.0% under the second |
| 25 APR 2025 | 62N33 | District 01 | Section 2020-263-SUR,SW&TS | 1 of 1 | $25,464,000 | Low |
| 25 APR 2025 | 62X93 | District 01 | Section (1981-082-I)BR | 2 of 2 | $2,719,999 | +43% |
| 25 APR 2025 | 66P73 | District 03 | Section D3 | 1 of 2 | $1,251,719 | Low, 20% under the second |
| 07 MAR 2025 | 61L09 | District 01 | Northlake, section 23-00101-00-TL | 2 of 2 | $916,416 | +36% |
| 07 MAR 2025 | 62W60 | District 01 | Section 2023-937-N,TS | 2 of 2 | $2,228,535 | +62% |
| 17 JAN 2025 | 70G85 | District 05 | Section D5 | 2 of 3 | $3,144,875 | +5.0% |
| 20 SEP 2024 | 62U21 | District 01 | Section 2024-1011-TS,I,N,SW | 1 of 2 | $2,249,775 | Low, 12% under the second |
| 20 SEP 2024 | 62V17 | District 01 | Section FAP | 3 of 3 | $11,169,000 | +20% |
| 02 AUG 2024 | 62R82 | District 01 | Section 2022 | 3 of 3 | $3,099,654 | +39% |
| 02 AUG 2024 | 62R85 | District 01 | Section 2023 | 2 of 2 | $1,000,773 | +70% |
| 14 JUN 2024 | 62N32 | District 01 | Section 2020-265-SUR,SW&TS | 2 of 3 | $16,566,667 | +8.0% |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.