IDOT contract 62W60 bid tabulation

Section 2023-937-N,TS. Let by Illinois DOT on March 7, 2025, Cook, District 01. 2 bids received; low bid $1,375,723 by H & H Electric Co..

Owner
Illinois DOT
Letting
07 MAR 2025
Pay items
84
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1H & H Electric Co.$1,375,723Low
2John Burns Construction Company$2,228,535+62%
IDOT contract 62W60: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. H & H Electric Co.2. John Burns Construction Company
1EM veh P S LSC 20 3C (X0324085)LF2,359$1.12$1.00
2Serv instl GR MT MTR (X1400150)EACH3$3,993.20$5,800.00
3Ped signal post 10 FT (X1400367)EACH3$1,099.28$1,820.00
4Engrs FLD ofc TY A D1 (X6700407)CAL MO4$2,200.00$3,000.00
5Rem EX junction box (X8130125)EACH1$443.31$50.00
6Fac in exist cab (X8570215)EACH2$11,560$25,000
7Rem repl battery upse (X8620310)EACH2$2,001.17$4,100.00
8Traf sigl P 16FT SPL (X8750516)EACH2$5,552.26$8,800.00
9Accessible ped signal (X8760200)EACH14$2,517.36$2,950.00
10S maa & P 24 SPL (X8771166)EACH1$27,460$36,000
11S maa & P 26 SPL (X8771170)EACH1$27,546$38,000
12S maa & P 34 SPL (X8771210)EACH1$32,373$41,000
13S maa & P 42 SPL (X8771250)EACH1$37,070$47,000
14Conc FDN TY A 12D (X8780012)LF12$290.34$1,000.00
15LED SF lens cover (X8809005)EACH70$506.88$780.00
16RE-optimize TR sig sys 1 (Z0033044)EACH4$864.00$650.00
17Earth excavation (20200100)CY11$306.13$80.00
18Topsoil F & P 5 (21101620)SY14.60$133.04$50.00
19Sodding salt tolerant (25200110)SY14.60$325.96$150.00
20Sub gran mat B 2 (31101180)SY67.90$11.79$20.00
21PCC PVT 8 (42000300)SY33$237.54$300.00
22PC conc sidewalk 5 (42400200)SF611$102.40$50.00
23Detectable warnings (42400800)SF40$73.13$65.00
24Curb rem (44000300)LF14$50.90$50.00
25Comb curb gutter rem (44000500)LF77$62.25$50.00
26Sidewalk rem (44000600)SF319$18.88$35.00
27Median removal (44003100)SF33$164.18$35.00
28Comb CC&G TB6.12 aep (60603900)LF77$145.03$150.00
29Non SPL waste disposl (66900200)CY70$1.00$77.00
30Soil disposal analy (66900530)EACH3$1,188.00$825.00
31Reg sub P-const plan (66901001)LS1$4,752.00$3,300.00
32Reg sub F con report (66901003)LS1$720.00$500.00
33Reg sub mon (66901006)CAL DAY16$1,152.00$800.00
34Mobilization (67100100)LS1$207,645$133,000
35Traf cont-prot 701456 (70100825)LS1$147.77$1.00
36TR cont & prot 701501 (70102620)LS1$147.77$1.00
37TR cont & prot 701502 (70102622)LS1$147.77$1.00
38TR cont & prot 701606 (70102625)LS1$147.77$1.00
39TR cont & prot 701602 (70102632)LS1$147.77$1.00
40TR cont & prot 701701 (70102635)LS1$11,969$18,500
41TR cont & prot 701801 (70102640)LS1$147.77$1.00
42Sign panel T1 (72000100)SF38.50$46.20$35.00
43Sign panel T2 (72000200)SF144.50$51.36$65.00
44THPL PVT MK line 12 (78000600)LF360$26.57$16.00
45THPL PVT MK line 24 (78000650)LF53$47.45$32.00
46Undrgrd C galvs 2 (81028200)LF538$48.36$110.00
47Undrgrd C galvs 3 (81028220)LF575$59.66$65.00
48Undrgrd C galvs 4 (81028240)LF1,052$67.87$140.00
49Handhole (81400100)EACH4$1,998.77$4,900.00
50HD handhole (81400200)EACH6$5,553.25$9,000.00
51Main EX TR sig instal (85000200)EACH4$2,955.41$10,200
52Elcbl C signal 14 2C (87301215)LF2,654$1.24$2.00
53Elcbl C signal 14 3C (87301225)LF5,011$1.41$2.00
54Elcbl C signal 14 5C (87301245)LF9,463$1.82$2.10
55Elcbl C signal 14 7C (87301255)LF4,580$2.23$2.20
56Elcbl C lead 14 1PR (87301305)LF2,885$1.41$2.30
57Elcbl C serv 6 2C (87301805)LF299$3.05$4.00
58Elcbl C egrdc 6 1C (87301900)LF2,311$1.90$3.00
59TS post galvs 16 (87502500)EACH11$2,203.54$3,100.00
60S maa & P 26 (87700170)EACH3$12,452$20,200
61S maa & P 32 (87700200)EACH1$13,759$20,900
62S maa & P 34 (87700210)EACH4$14,053$22,500
63S maa & P 42 (87700250)EACH3$17,724$24,600
64S maa & P 55 (87700320)EACH1$22,697$35,600
65Conc FDN TY A (87800100)LF60$322.98$1,020.00
66Conc FDN TY E 30D (87800400)LF131$281.78$750.00
67Conc FDN TY E 36D (87800415)LF67$378.12$800.00
68Drill EX handhole (87900200)EACH66$466.05$800.00
69SH LED 1F 3S mam (88030020)EACH29$860.91$950.00
70SH LED 1F 3S BM (88030050)EACH22$746.05$810.00
71SH LED 1F 4S BM (88030070)EACH2$883.09$960.00
72SH LED 1F 4S mam (88030080)EACH2$1,096.66$1,110.00
73SH LED 1F 5S BM (88030100)EACH8$1,012.58$1,100.00
74SH LED 1F 5S mam (88030110)EACH7$1,239.02$1,270.00
75Ped SH LED 1F BM CDT (88102717)EACH14$727.11$740.00
76TS backplate L F plas (88200410)EACH38$216.55$480.00
77Inductive loop detect (88500100)EACH15$221.87$210.00
78Det loop T1 (88600100)LF1,706$19.18$54.00
79Reloc EX TS equip (89501250)EACH4$2,370.51$700.00
80Mod EX contr (89502200)EACH3$1,681.08$600.00
81Rem elcbl FR con (89502300)LF15,938$0.74$0.50
82Remov EX TS equip (89502375)EACH4$4,222.02$90,000
83Remov EX handhole (89502380)EACH2$459.94$200.00
84Remov EX conc FDN (89502385)EACH30$468.26$300.00
IDOT contract 62W60: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of March 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy