H & H Electric Co.: IDOT bid record
H & H Electric Co. submitted 49 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 31 JUL 2026, and was the low bidder on 33 of them (67%). When it was not low, its total sat a median +10% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $66,229,554
- Latest bid
- 31 JUL 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 14 | 8 | 57% |
| 2022 | 8 | 3 | 38% |
| 2023 | 7 | 4 | 57% |
| 2024 | 6 | 6 | 100% |
| 2025 | 5 | 5 | 100% |
| 2026 | 9 | 7 | 78% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 01 | 41 | 30 | 73% |
| District 03 | 5 | 3 | 60% |
| District 04 | 2 | 0 | 0% |
| District 05 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Remov EX TS equip | 89502375 | EACH | 32 | 24 (75%) | $459.11 | $2,720.00 |
| Undrgrd C galvs 2 | 81028200 | LF | 27 | 24 (89%) | $18.76 | $38.08 |
| Handhole | 81400100 | EACH | 23 | 22 (96%) | $1,797.08 | $2,500.00 |
| Trainees TPG | Z0076604 | HR | 21 | 21 (100%) | $15.00 | $15.00 |
| Trainees | Z0076600 | HR | 20 | 20 (100%) | $0.80 | $0.80 |
| Main EX TR sig instal | 85000200 | EACH | 36 | 19 (53%) | $948.76 | $2,600.00 |
| Undrgrd C galvs 4 | 81028240 | LF | 24 | 18 (75%) | $65.93 | $69.04 |
| Temp info signing | Z0030850 | SF | 21 | 18 (86%) | $10.80 | $18.00 |
| HD handhole | 81400200 | EACH | 17 | 17 (100%) | $2,305.17 | $3,729.00 |
| Elcbl C tracer 14 1C | 87300925 | LF | 21 | 15 (71%) | $0.23 | $1.00 |
| Det loop T1 | 88600100 | LF | 16 | 15 (94%) | $18.93 | $26.17 |
| Uninter power sup SPL | X8620200 | EACH | 20 | 14 (70%) | $7,326.66 | $6,274.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Meade Inc. | 19 | 3 of 19 |
| Hecker and Company, Inc. | 17 | 2 of 17 |
| Electric Conduit Construction | 12 | 1 of 12 |
| John Burns Construction Company | 10 | 1 of 10 |
| Home Towne Electric, Inc. | 9 | 3 of 9 |
| Thorne Electric, Inc. | 6 | 2 of 6 |
| Helm Electric Facility Solutions, Inc. d/b/a Helm Electric | 4 | 1 of 4 |
| Oberlander Electric Co. | 3 | 1 of 3 |
| Bodine Electric of Decatur | 3 | 1 of 3 |
| Lyons Electric Company, Inc. | 3 | 0 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 31 JUL 2026 | 61M40 | District 01 | Project Number: Vd4X-283 / /, section 20-00288-05-TL | 2 of 3 | $3,421,618 | +14% |
| 31 JUL 2026 | 62W91 | District 01 | Section 2024-966-TS | 1 of 3 | $1,753,960 | Low, 55% under the second |
| 12 JUN 2026 | 62W82 | District 01 | Section 2024-956-TS | 1 of 3 | $6,878,841 | Low, 29% under the second |
| 12 JUN 2026 | 62W83 | District 01 | Section 2024-957-TS | 1 of 4 | $2,052,267 | Low, 13% under the second |
| 12 JUN 2026 | 80C89 | District 01 | Section 2026-2160-TS | 1 of 2 | $2,718,198 | Low, 45% under the second |
| 27 FEB 2026 | 61M20 | District 01 | Oak Lawn, section 24-00199-00-LT | 1 of 5 | $318,848 | Low, 22% under the second |
| 27 FEB 2026 | 61M21 | District 01 | Oak Lawn, section 24-00198-00-LT | 1 of 5 | $326,553 | Low, 22% under the second |
| 27 FEB 2026 | 62W92 | District 01 | Section 2024-967-TS | 2 of 4 | $1,978,232 | +5.0% |
| 16 JAN 2026 | 61M02 | District 01 | Elgin, section 22-00197-00-TL | 1 of 3 | $584,382 | Low, 4.0% under the second |
| 07 NOV 2025 | 61L21 | District 01 | Rosemont, section 19-00035-00-SP | 1 of 2 | $4,177,932 | Low, 6.0% under the second |
| 13 JUN 2025 | 62W90 | District 01 | Section 2024-965-TS | 1 of 2 | $3,357,143 | Low, 10% under the second |
| 25 APR 2025 | 62W59 | District 01 | Section 2023-938-N,TS | 1 of 3 | $1,101,716 | Low, 2.0% under the second |
| 07 MAR 2025 | 62W60 | District 01 | Section 2023-937-N,TS | 1 of 2 | $1,375,723 | Low, 62% under the second |
| 07 MAR 2025 | 62W61 | District 01 | Section 2023-940-N,TS | 1 of 1 | $2,125,601 | Low |
| 02 AUG 2024 | 62R82 | District 01 | Section 2022 | 1 of 3 | $2,236,800 | Low, 20% under the second |
| 02 AUG 2024 | 62R85 | District 01 | Section 2023 | 1 of 2 | $589,015 | Low, 70% under the second |
| 14 JUN 2024 | 62N32 | District 01 | Section 2020-265-SUR,SW&TS | 1 of 3 | $15,380,412 | Low, 8.0% under the second |
| 14 JUN 2024 | 62R84 | District 01 | Section 2023 | 1 of 1 | $1,113,578 | Low |
| 14 JUN 2024 | 62W18 | District 01 | Section 23 | 1 of 2 | $1,032,783 | Low, 74% under the second |
| 26 APR 2024 | 61K42 | District 01 | Project Number: Xuzd-086 / /, section 19-00512-00-SP | 1 of 2 | $1,455,916 | Low, 22% under the second |
| 17 NOV 2023 | 62R83 | District 01 | Section 2023 | 1 of 3 | $1,346,686 | Low, 25% under the second |
| 17 NOV 2023 | 62U86 | District 01 | Section 2023 | 2 of 2 | $748,221 | +9.0% |
| 17 NOV 2023 | 62W13 | District 01 | Section 2023 | 2 of 2 | $534,720 | +13% |
| 22 SEP 2023 | 62U48 | District 01 | Section 2022 | 3 of 5 | $4,146,513 | +20% |
| 16 JUN 2023 | 62T53 | District 01 | Section 2023 | 1 of 3 | $3,706,914 | Low, 18% under the second |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.