Home Towne Electric, Inc.: IDOT bid record
Home Towne Electric, Inc. submitted 17 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 31 JUL 2026, and was the low bidder on 9 of them (53%). When it was not low, its total sat a median +17% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $17,871,340
- Latest bid
- 31 JUL 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 4 | 1 | 25% |
| 2022 | 3 | 2 | 67% |
| 2023 | 6 | 4 | 67% |
| 2024 | 1 | 0 | 0% |
| 2025 | 2 | 1 | 50% |
| 2026 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Remov EX TS equip | 89502375 | EACH | 13 | 9 (69%) | $2,240.00 | $2,720.00 |
| Drill EX handhole | 87900200 | EACH | 12 | 8 (67%) | $401.40 | $465.00 |
| Rod and clean EX cond | X0324599 | LF | 8 | 8 (100%) | $0.10 | $0.25 |
| Conc FDN TY A | 87800100 | LF | 10 | 7 (70%) | $322.80 | $350.00 |
| Trainees TPG | Z0076604 | HR | 7 | 7 (100%) | $15.00 | $15.00 |
| Trainees | Z0076600 | HR | 7 | 7 (100%) | $0.80 | $0.80 |
| Ped SH LED 1F BM CDT | 88102717 | EACH | 7 | 7 (100%) | $617.00 | $724.00 |
| Handhole | 81400100 | EACH | 12 | 6 (50%) | $1,879.50 | $2,500.00 |
| Reg sub mon | 66901006 | CAL DAY | 10 | 6 (60%) | $1,094.50 | $820.00 |
| Rem elcbl FR con | 89502300 | LF | 9 | 6 (67%) | $0.60 | $0.85 |
| Undrgrd C galvs 2 | 81028200 | LF | 13 | 5 (38%) | $27.00 | $38.08 |
| Undrgrd C galvs 4 | 81028240 | LF | 11 | 5 (45%) | $69.50 | $69.04 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| H & H Electric Co. | 9 | 6 of 9 |
| Hecker and Company, Inc. | 6 | 3 of 6 |
| Meade Inc. | 3 | 2 of 3 |
| Thorne Electric, Inc. | 3 | 0 of 3 |
| Electric Conduit Construction | 2 | 0 of 2 |
| John Burns Construction Company | 2 | 0 of 2 |
| Helm Electric Facility Solutions, Inc. d/b/a Helm Electric | 2 | 1 of 2 |
| William Charles Construction Co, LLC (d/b/a) William Charles Electric | 1 | 0 of 1 |
| MYS, Incorporated | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 31 JUL 2026 | 61M40 | District 01 | Project Number: Vd4X-283 / /, section 20-00288-05-TL | 1 of 3 | $2,996,846 | Low, 14% under the second |
| 25 APR 2025 | 62W59 | District 01 | Section 2023-938-N,TS | 3 of 3 | $1,271,818 | +15% |
| 07 MAR 2025 | 61L09 | District 01 | Northlake, section 23-00101-00-TL | 1 of 2 | $674,695 | Low, 36% under the second |
| 26 APR 2024 | 61K42 | District 01 | Project Number: Xuzd-086 / /, section 19-00512-00-SP | 2 of 2 | $1,779,370 | +22% |
| 17 NOV 2023 | 62N37 | District 01 | Section 2021-004-TS&SW | 1 of 1 | $814,156 | Low |
| 22 SEP 2023 | 61J39 | District 01 | Glenview, section 21-00203-00-TL | 1 of 2 | $758,499 | Low, 39% under the second |
| 22 SEP 2023 | 62U32 | District 01 | Section 2023 | 2 of 2 | $2,129,192 | +4.0% |
| 04 AUG 2023 | 61J42 | District 01 | Burr Ridge, section 22-00056-00-SW | 2 of 2 | $208,617 | +71% |
| 04 AUG 2023 | 62U47 | District 01 | Section 2022 | 1 of 1 | $1,389,836 | Low |
| 28 APR 2023 | 61J51 | District 01 | Project Number: Yna2-285 / /, section 19-00511-00-SP | 1 of 1 | $1,574,634 | Low |
| 11 MAR 2022 | 61H50 | District 01 | Project Number: Gmic-624 / /, section 18-00480-00-TL | 1 of 3 | $3,300,000 | Low, 12% under the second |
| 11 MAR 2022 | 61H61 | District 01 | Project Number: 0331-180 / /, section 20-00288-04-TL | 1 of 2 | $512,865 | Low, 24% under the second |
| 21 JAN 2022 | 62M92 | District 01 | Section 2020-218-L | 3 of 4 | $2,736,944 | +21% |
| 05 NOV 2021 | 61H22 | District 01 | Project Number: Idld-702- / /, section 19-DCCSS-03-TL | 1 of 4 | $5,849,810 | Low, 1.0% under the second |
| 15 JAN 2021 | 62M60 | District 01 | Section 2020-190-TS | 3 of 5 | $1,062,573 | +17% |
| 15 JAN 2021 | 62M61 | District 01 | Section 2020-189-TS | 3 of 5 | $960,716 | +10% |
| 15 JAN 2021 | 62M62 | District 01 | Section 2020-188-TS | 2 of 4 | $741,925 | +18% |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.