Helm Electric Facility Solutions, Inc. d/b/a Helm Electric: IDOT bid record
Helm Electric Facility Solutions, Inc. d/b/a Helm Electric submitted 15 bids on Illinois DOT contracts in the data, from 16 JUN 2023 to 18 SEP 2026, and was the low bidder on 6 of them (40%). When it was not low, its total sat a median +9.0% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $4,612,797
- Latest bid
- 18 SEP 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2023 | 2 | 0 | 0% |
| 2024 | 3 | 2 | 67% |
| 2025 | 5 | 1 | 20% |
| 2026 | 5 | 3 | 60% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 02 | 6 | 3 | 50% |
| District 01 | 4 | 1 | 25% |
| District 03 | 3 | 2 | 67% |
| District 04 | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Lum LED rdwy G | 82110007 | EACH | 6 | 3 (50%) | $1,158.39 | $907.50 |
| Elect serv install | 80400100 | EACH | 5 | 3 (60%) | $4,350.00 | $4,720.33 |
| Remov LTG contr FDN | 84500130 | EACH | 5 | 3 (60%) | $1,803.75 | $900.00 |
| Rem elcbl FR con | 89502300 | LF | 6 | 2 (33%) | $0.92 | $0.85 |
| Bkwy dev cou SS SCRN | 83800650 | EACH | 6 | 2 (33%) | $270.76 | $225.56 |
| Undrgrd C CNC 2 | 81028750 | LF | 5 | 2 (40%) | $38.92 | $22.29 |
| Remov elect serv inst | 84500120 | EACH | 5 | 2 (40%) | $1,408.00 | $936.00 |
| Remov lighting contr | 84500110 | EACH | 5 | 2 (40%) | $1,408.00 | $968.79 |
| Rem tower FDN | X8420510 | EACH | 5 | 2 (40%) | $3,806.00 | $3,020.00 |
| LT P A 40MH 15MA | 83008600 | EACH | 5 | 2 (40%) | $6,186.00 | $4,934.20 |
| Main EX TR sig instal | 85000200 | EACH | 5 | 1 (20%) | $1,500.00 | $2,600.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| William Charles Construction Co, LLC (d/b/a) William Charles Electric | 6 | 4 of 6 |
| H & H Electric Co. | 4 | 3 of 4 |
| Utility Dynamics Corporation | 3 | 0 of 3 |
| Meade Inc. | 3 | 1 of 3 |
| Laser Electric, Inc. | 3 | 2 of 3 |
| John Burns Construction Company | 3 | 2 of 3 |
| Home Towne Electric, Inc. | 2 | 1 of 2 |
| Gerstner Electric, Inc. | 2 | 2 of 2 |
| Oberlander Electric Co. | 2 | 0 of 2 |
| RoadSafe Traffic Systems, Inc. | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 SEP 2026 | 64V85 | District 02 | Section D2 | 1 of 1 | $514,056 | Low |
| 31 JUL 2026 | 61M40 | District 01 | Project Number: Vd4X-283 / /, section 20-00288-05-TL | 3 of 3 | $3,526,593 | +18% |
| 24 APR 2026 | 66T25 | District 03 | Section (06-2)HL | 1 of 4 | $511,814 | Low, 23% under the second |
| 27 FEB 2026 | 62W92 | District 01 | Section 2024-967-TS | 1 of 4 | $1,883,890 | Low, 5.0% under the second |
| 16 JAN 2026 | 61M02 | District 01 | Elgin, section 22-00197-00-TL | 3 of 3 | $636,666 | +9.0% |
| 19 SEP 2025 | 68K24 | District 04 | Section 72(7-9)L | 4 of 5 | $2,616,146 | +48% |
| 19 SEP 2025 | 68K25 | District 04 | Section 72[(8-9)L-1,(10)L];(90-11)L | 4 of 5 | $1,783,129 | +75% |
| 01 AUG 2025 | 87864 | District 03 | Project Number: Ivxf-925- / /, section 22-00182-01-TL | 1 of 1 | $624,037 | Low |
| 25 APR 2025 | 62W59 | District 01 | Section 2023-938-N,TS | 2 of 3 | $1,125,147 | +2.0% |
| 17 JAN 2025 | 64T04 | District 02 | Section (141-2)L | 2 of 3 | $269,528 | +4.0% |
| 20 SEP 2024 | 64T83 | District 02 | Section D2 | 1 of 2 | $469,796 | Low, 6.0% under the second |
| 14 JUN 2024 | 66N60 | District 03 | Section (25,26,29)SFY | 2 of 3 | $241,368 | 0.0% |
| 19 JAN 2024 | 64R56 | District 02 | Section ILU | 1 of 4 | $609,204 | Low, 14% under the second |
| 16 JUN 2023 | 64R57 | District 02 | Section ILU | 2 of 2 | $483,602 | +13% |
| 16 JUN 2023 | 64R58 | District 02 | Section ILU | 2 of 2 | $352,683 | +5.0% |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.