IDOT contract 66T25 bid tabulation
Section (06-2)HL. Let by Illinois DOT on April 24, 2026, Bureau, District 03. 4 bids received; low bid $511,814 by Helm Electric Facility Solutions, Inc. d/b/a Helm Electric.
- Owner
- Illinois DOT
- Letting
- 24 APR 2026
- Pay items
- 18
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Helm Electric Facility Solutions, Inc. d/b/a Helm Electric | $511,814 | Low |
| 2 | Electric Conduit Construction | $628,432 | +23% |
| 3 | Laser Electric, Inc. | $776,720 | +52% |
| 4 | John Burns Construction Company | $819,545 | +60% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Helm Electric Facility Solutions, Inc. d/b/a Helm Electric | 2. Electric Conduit Construction | 3. Laser Electric, Inc. | 4. John Burns Construction Company |
|---|---|---|---|---|---|---|---|
| 1 | Temp info signing (X7200061) | SF | 84 | $18.90 | $105.00 | $376.46 | $50.00 |
| 2 | Rem tower FDN (X8420510) | EACH | 7 | $3,197.14 | $2,625.00 | $4,852.98 | $2,200.00 |
| 3 | Mobilization (67100100) | LS | 1 | $25,000 | $29,400 | $27,636 | $55,000 |
| 4 | Traf cont-prot 701411 (70100420) | EACH | 4 | $6,500.00 | $2,625.00 | $9,555.31 | $6,000.00 |
| 5 | Changeable message SN (70107025) | CAL DAY | 117 | $37.00 | $210.00 | $368.72 | $100.00 |
| 6 | Elect serv install (80400100) | EACH | 2 | $4,350.00 | $7,380.26 | $12,869 | $7,500.00 |
| 7 | Undrgrd C CNC 2 (81028750) | LF | 590 | $38.92 | $41.60 | $31.89 | $90.00 |
| 8 | UD 2#6 #6G xlpuse 1 (81603035) | LF | 9,205 | $10.24 | $15.14 | $15.12 | $29.00 |
| 9 | Lum LED rdwy G (82110007) | EACH | 23 | $1,196.50 | $1,015.39 | $1,217.07 | $1,000.00 |
| 10 | LT cont pedm 240V 60 (82500330) | EACH | 2 | $9,662.00 | $20,750 | $15,797 | $20,000 |
| 11 | LT P A 45MH 15DA (83003600) | EACH | 23 | $6,604.50 | $6,349.57 | $9,671.13 | $6,750.00 |
| 12 | LP F M 15BC 8" X 6' (83600355) | EACH | 23 | $1,598.25 | $1,791.15 | $1,989.04 | $2,750.00 |
| 13 | Bkwy dev cou SS SCRN (83800650) | EACH | 92 | $225.56 | $550.54 | $538.19 | $650.00 |
| 14 | Rem LT U no salv (84200600) | EACH | 2 | $2,343.75 | $4,965.13 | $1,871.01 | $1,950.00 |
| 15 | Rem LT TWR no sal (84200605) | EACH | 7 | $5,074.29 | $4,147.50 | $3,436.57 | $3,000.00 |
| 16 | Remov lighting contr (84500110) | EACH | 2 | $1,131.25 | $2,802.59 | $1,667.89 | $500.00 |
| 17 | Remov elect serv inst (84500120) | EACH | 2 | $2,130.00 | $1,910.09 | $2,494.16 | $1,000.00 |
| 18 | Remov LTG contr FDN (84500130) | EACH | 2 | $1,803.75 | $3,485.09 | $2,494.16 | $2,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 24, 2026. Compiled by Mirage Metrics.