Oberlander Electric Co.: IDOT bid record
Oberlander Electric Co. submitted 39 bids on Illinois DOT contracts in the data, from 05 MAR 2021 to 12 JUN 2026, and was the low bidder on 16 of them (41%). When it was not low, its total sat a median +22% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $9,789,926
- Latest bid
- 12 JUN 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 11 | 3 | 27% |
| 2022 | 7 | 3 | 43% |
| 2023 | 7 | 2 | 29% |
| 2024 | 3 | 2 | 67% |
| 2025 | 8 | 4 | 50% |
| 2026 | 3 | 2 | 67% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 04 | 38 | 16 | 42% |
| District 05 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| SH P LED 1F 3S mam | 88040090 | EACH | 13 | 12 (92%) | $950.00 | $1,252.05 |
| SH P LED 1F 3S BM | 88040070 | EACH | 14 | 11 (79%) | $1,000.00 | $1,200.00 |
| SH P LED 1F 4S BM | 88040110 | EACH | 13 | 11 (85%) | $1,250.00 | $1,260.00 |
| SH P LED 1F 4S mam | 88040120 | EACH | 10 | 10 (100%) | $1,200.00 | $1,360.08 |
| Drill EX handhole | 87900200 | EACH | 16 | 9 (56%) | $595.00 | $465.00 |
| TS backplate ret-refl | 88200510 | EACH | 14 | 8 (57%) | $287.50 | $302.01 |
| Elcbl C signal 14 5C | 87301245 | LF | 14 | 7 (50%) | $3.25 | $2.50 |
| Remov EX conc FDN | 89502385 | EACH | 10 | 7 (70%) | $1,475.00 | $635.00 |
| Conc FDN TY A | 87800100 | LF | 9 | 6 (67%) | $350.00 | $350.00 |
| Conc FDN TY E 36D | 87800415 | LF | 6 | 6 (100%) | $515.00 | $412.50 |
| Undrgrd C PVC 2 | 81028350 | LF | 13 | 5 (38%) | $45.00 | $27.00 |
| Elcbl C egrdc 6 1C | 87301900 | LF | 12 | 5 (42%) | $4.50 | $3.25 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Laser Electric, Inc. | 38 | 22 of 38 |
| Bodine Electric of Decatur | 10 | 5 of 10 |
| Gerstner Electric, Inc. | 4 | 3 of 4 |
| H & H Electric Co. | 3 | 2 of 3 |
| John Burns Construction Company | 3 | 3 of 3 |
| Helm Electric Facility Solutions, Inc. d/b/a Helm Electric | 2 | 2 of 2 |
| Electric Conduit Construction | 1 | 1 of 1 |
| IHC Construction Companies, L.L.C. | 1 | 0 of 1 |
| William Charles Construction Co, LLC (d/b/a) William Charles Electric | 1 | 1 of 1 |
| Champaign Signal and Lighting Co. A Division of Champaign Asphalt Company LLC | 1 | 1 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 JUN 2026 | 68K85 | District 04 | Section D4 | 1 of 2 | $790,676 | Low, 4.0% under the second |
| 12 JUN 2026 | 68K93 | District 04 | Section (72-7)L-1;[72(8,9);90-11]L-2 | 1 of 2 | $1,451,503 | Low, 8.0% under the second |
| 27 FEB 2026 | 68K06 | District 04 | Section D4 | 2 of 2 | $851,001 | +11% |
| 19 SEP 2025 | 68K24 | District 04 | Section 72(7-9)L | 5 of 5 | $2,984,609 | +69% |
| 19 SEP 2025 | 68K25 | District 04 | Section 72[(8-9)L-1,(10)L];(90-11)L | 5 of 5 | $1,928,330 | +89% |
| 19 SEP 2025 | 68K26 | District 04 | Section D4 | 1 of 2 | $1,190,380 | Low, 12% under the second |
| 13 JUN 2025 | 68J79 | District 04 | Section (11)TS-5 | 2 of 2 | $251,634 | +8.0% |
| 13 JUN 2025 | 68J80 | District 04 | Section (116)TS-3 | 1 of 2 | $239,436 | Low, 5.0% under the second |
| 13 JUN 2025 | 68J81 | District 04 | Section (62-2)L | 1 of 2 | $665,773 | Low, 6.0% under the second |
| 25 APR 2025 | 68J27 | District 04 | Section D4 | 1 of 2 | $382,690 | Low, 7.0% under the second |
| 07 MAR 2025 | 68J86 | District 04 | Section D4 | 2 of 2 | $683,289 | +5.0% |
| 02 AUG 2024 | 68J11 | District 04 | Section D4 | 1 of 2 | $1,200,346 | Low, 6.0% under the second |
| 26 APR 2024 | 68I05 | District 04 | Section (7)TS | 2 of 2 | $312,551 | +29% |
| 26 APR 2024 | 68J05 | District 04 | Section (9)TS-1 | 1 of 2 | $291,000 | Low, 7.0% under the second |
| 17 NOV 2023 | 68H77 | District 04 | Section D4 | 2 of 2 | $2,020,000 | +16% |
| 22 SEP 2023 | 68H76 | District 04 | Section D4 | 2 of 2 | $2,102,716 | +23% |
| 16 JUN 2023 | 68H55 | District 04 | Section (135)TS-2;(58CS)TS | 1 of 2 | $672,500 | Low, 4.0% under the second |
| 16 JUN 2023 | 68H56 | District 04 | Section D4 | 2 of 2 | $383,146 | +4.0% |
| 16 JUN 2023 | 68H61 | District 04 | Section D4 | 2 of 2 | $305,045 | +10% |
| 28 APR 2023 | 68H57 | District 04 | Section D4 | 1 of 2 | $437,500 | Low, 9.0% under the second |
| 10 MAR 2023 | 68H59 | District 04 | Section D4 | 2 of 2 | $1,296,480 | +12% |
| 23 SEP 2022 | 68H17 | District 04 | Section D4 | 1 of 2 | $470,200 | Low, 2.0% under the second |
| 23 SEP 2022 | 68H18 | District 04 | Section D4 | 2 of 2 | $498,922 | +9.0% |
| 17 JUN 2022 | 68G90 | District 04 | Section D4 | 2 of 2 | $340,740 | +28% |
| 29 APR 2022 | 68G73 | District 04 | Section 90(6,106)L | 3 of 3 | $302,575 | +22% |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.