IHC Construction Companies, L.L.C.: IDOT bid record

IHC Construction Companies, L.L.C. submitted 24 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 31 JUL 2026, and was the low bidder on 4 of them (17%). When it was not low, its total sat a median +16% above the low bid.

Owner
Illinois DOT
Low bid volume
$76,228,674
Latest bid
31 JUL 2026
Data through
18 SEP 2026
24Bids
4Low bids
17Win rate, percent
+16%Median gap to the low bid when not low, 20 bids

By year

YearBidsLow bidsWin rate
20219111%
2022300%
2023200%
20243267%
20256117%
2026100%
IHC Construction Companies, L.L.C., IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 0119316%
District 042150%
District 02200%
District 03100%
IHC Construction Companies, L.L.C., IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Trainees TPGZ0076604HR2222 (100%)$15.00$15.00
TraineesZ0076600HR2121 (100%)$0.80$0.80
Nitrogen fert nutr25000400LB2015 (75%)$2.62$3.00
Potassium fert nutr25000600LB2015 (75%)$2.62$3.00
Bit matls tack CT40600290LB1713 (76%)$0.01$0.01
Changeable message SN70107025CAL DAY1613 (81%)$25.00$55.00
Temp eros contr seed28000250LB2211 (50%)$5.00$5.00
TR bar TRM T1 SPL tan63100167EACH1311 (85%)$3,320.00$3,800.00
Reinf bars, epoxy CTD50800205LB2310 (43%)$1.60$2.50
Reg sub mon66901006CAL DAY1810 (56%)$700.00$820.00
Perimeter eros bar28000400LF239 (39%)$2.90$3.50
Trench backfill20800150CY189 (50%)$58.64$55.00
IHC Construction Companies, L.L.C., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

IHC Construction Companies, L.L.C., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
31 JUL 202661M13District 01Project Number: Qnyf-462 / /, section 12-00192-04-BR4 of 6$42,696,574+17%
07 NOV 202562R63District 013 of 6$17,128,679+9.0%
19 SEP 202566295District 03Section ((32,47-4)VB,HBR-3)BR,BRR2 of 2$16,696,201+17%
19 SEP 202585764District 02Project Number: 9Uaj-753 / /, section 18-00655-00-BR3 of 4$8,830,960+39%
01 AUG 202568510District 04Section (37-24HVB)BR1 of 2$15,796,785Low, 4.0% under the second
25 APR 202561G79District 01Naperville, section 06-00133-00-BR2 of 4$35,257,000+6.0%
07 MAR 202562P43District 01Section 2021-120-BR3 of 7$15,596,158+12%
08 NOV 202462B66District 01Section (125S-1)I-42 of 3$15,646,267+1.0%
14 JUN 202460J10District 01Section 120-Y-B1 of 3$18,192,045Low, 2.0% under the second
14 JUN 202462J23District 01Section 2019-045-BR&T1 of 2$25,221,182Low, 5.0% under the second
20 JAN 202361H95District 01Project Number: Mv54-588 / /, section 15-00277-01-BR4 of 6$27,096,000+23%
20 JAN 202362A53District 01Section WR(2)-R-15 of 6$10,408,644+19%
18 NOV 202261G82District 01Naperville, section 16-00167-00-BR6 of 7$13,590,792+38%
18 NOV 202264G68District 02Section 4HBR-34 of 4$9,454,793+18%
11 MAR 202262P68District 01Section 2021-150-BY5 of 9$2,067,305+15%
30 JUL 202162D86District 01Section A-W&RS-24 of 4$14,611,583+21%
11 JUN 202161G53District 01Joliet, section 11-00443-00-BR2 of 2$2,893,765+24%
11 JUN 202162G39District 01Section 22-36HB-11 of 10$17,018,663Low, 1.0% under the second
23 APR 202160T06District 01Section 0708.08B-R(11)4 of 5$5,518,737+4.0%
23 APR 202162K80District 01Section 2020-009-BR4 of 6$2,306,597+12%
23 APR 202168G20District 04Section [62-2;102(1-4);57(2-4)]ITS7 of 7$3,164,568+72%
05 MAR 202162H51District 01Section 2018-126-BR4 of 5$10,611,579+12%
15 JAN 202161F89District 01Mundelein, section 12-00097-00-BR4 of 8$4,230,509+8.0%
15 JAN 202161G76District 01Franklin Park, section 17-00083-01-BR5 of 8$1,792,843+7.0%
IHC Construction Companies, L.L.C.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy