Judlau Contracting, Inc.: IDOT bid record

Judlau Contracting, Inc. submitted 26 bids on Illinois DOT contracts in the data, from 11 JUN 2021 to 07 MAR 2025, and was the low bidder on 5 of them (19%). When it was not low, its total sat a median +15% above the low bid.

Owner
Illinois DOT
Low bid volume
$220,220,186
Latest bid
07 MAR 2025
Data through
18 SEP 2026
26Bids
5Low bids
19Win rate, percent
+15%Median gap to the low bid when not low, 21 bids

By year

YearBidsLow bidsWin rate
2021200%
20228113%
20235240%
20249222%
2025200%
Judlau Contracting, Inc., IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 0125520%
District 03100%
Judlau Contracting, Inc., IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Trainees TPGZ0076604HR2626 (100%)$15.00$15.00
TraineesZ0076600HR2525 (100%)$0.80$0.80
Bit matls tack CT40600290LB2319 (83%)$0.01$0.01
Changeable message SN70107025CAL DAY2214 (64%)$29.00$55.00
Non SPL waste disposl66900200CY1914 (74%)$40.00$92.99
Trench backfill20800150CY2313 (57%)$38.77$55.00
Undrgrd C galvs 281028200LF2113 (62%)$23.88$38.08
Sign panel T272000200SF2113 (62%)$35.00$40.00
SHRT TRM pavt MK rem70300150SF1913 (68%)$0.50$1.20
EM veh P S LSC 20 3CX0324085LF1813 (72%)$1.20$1.40
Bit matls PR CT40600275LB1513 (87%)$0.01$0.01
Temp PVT MK L6 T4 tape70307130LF1413 (93%)$1.69$1.85
Judlau Contracting, Inc., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
07 MAR 202561K89District 01Orland Park, section 16-00078-00-CH2 of 4$10,841,220+12%
07 MAR 202562N91District 01Section 2018-100-BR2 of 3$106,678,511+1.0%
08 NOV 202461J87District 01Barrington, section 11-00087-02-GS3 of 7$72,028,447+4.0%
08 NOV 202462W38District 01Section (531)BR1 of 4$82,838,696Low, 6.0% under the second
20 SEP 202462R25District 01Section FAI2 of 3$23,589,773+7.0%
20 SEP 202462R26District 01Section FAI3 of 4$31,769,953+16%
02 AUG 202461J93District 01Project Number: Yj7X-870 / /, section 06-00329-02-PW4 of 5$65,979,536+4.0%
14 JUN 202462F11District 01Section 3212TS-RR1 of 3$17,861,924Low, 7.0% under the second
14 JUN 202462P44District 01Section 2021-119-BR4 of 4$17,797,535+33%
26 APR 202460P75District 01Section (56&57)R-46 of 6$47,981,627+23%
26 APR 202461H34District 01Plainfield, section 06-00040-00-FP3 of 4$57,307,896+8.0%
22 SEP 202362R29District 01Section FAI3 of 6$89,357,507+12%
16 JUN 202362H82District 01Section 2019-001-R1 of 4$20,567,520Low, 2.0% under the second
16 JUN 202362P71District 01Section 2021-154-R5 of 5$59,646,025+8.0%
10 MAR 202360Y72District 01Section (145,146&146S-2)WRS&B-11 of 3$57,274,935Low, 0.0% under the second
20 JAN 202361H95District 01Project Number: Mv54-588 / /, section 15-00277-01-BR6 of 6$29,770,000+35%
18 NOV 202261G82District 01Naperville, section 16-00167-00-BR7 of 7$17,568,062+79%
18 NOV 202262N31District 01Section 2021-008-SR3 of 6$8,777,402+9.0%
23 SEP 202266D26District 03Section (1-1)R,BR13 of 3$44,778,074+36%
29 APR 202262P45District 01Section 2021-118-R1 of 3$41,677,110Low, 4.0% under the second
11 MAR 202261H14District 01Franklin Park, section 17-00083-00-PV7 of 9$28,121,434+19%
11 MAR 202262P68District 01Section 2021-150-BY8 of 9$2,764,168+54%
21 JAN 202261G73District 01Project Number: 6Fqn-827 / /, section 06-00122-16-FP5 of 5$48,472,412+7.0%
21 JAN 202262H49District 01Section 2018-133-BR6 of 7$24,673,074+15%
05 NOV 202162C25District 01Section 0102N&T4 of 4$19,917,974+18%
Judlau Contracting, Inc.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy