Dunnet Bay Construction Company: IDOT bid record

Dunnet Bay Construction Company submitted 71 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 18 SEP 2026, and was the low bidder on 26 of them (37%). When it was not low, its total sat a median +9.0% above the low bid.

Owner
Illinois DOT
Low bid volume
$229,609,557
Latest bid
18 SEP 2026
Data through
18 SEP 2026
71Bids
26Low bids
37Win rate, percent
+9.0%Median gap to the low bid when not low, 45 bids

By year

YearBidsLow bidsWin rate
202120420%
202211436%
202310440%
202412542%
20257571%
202611436%
Dunnet Bay Construction Company, IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 01652640%
District 02500%
District 03100%
Dunnet Bay Construction Company, IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Trainees TPGZ0076604HR6767 (100%)$15.00$15.00
TraineesZ0076600HR6565 (100%)$0.80$0.80
Bit matls tack CT40600290LB6452 (81%)$0.01$0.01
Perimeter eros bar28000400LF6249 (79%)$2.33$3.50
Driving piles51202305LF4240 (95%)$0.01$0.10
Temp eros contr seed28000250LB5435 (65%)$5.00$5.00
Guardrail remov63200310LF4634 (74%)$6.42$8.00
Name plates51500100EACH5932 (54%)$650.00$773.24
Terminal marker - DA72501000EACH3732 (86%)$35.00$47.85
Temp info signingZ0030850SF4730 (64%)$16.00$18.00
Changeable message SN70107025CAL DAY4630 (65%)$30.00$55.00
Bit matls PR CT40600275LB3230 (94%)$0.01$0.01
Dunnet Bay Construction Company, IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Dunnet Bay Construction Company, IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
18 SEP 202661L85District 01Project Number: 50B4-000 / /, section 18-00488-00-BR3 of 5$5,419,964+14%
31 JUL 202661M13District 01Project Number: Qnyf-462 / /, section 12-00192-04-BR1 of 6$36,611,206Low, 4.0% under the second
12 JUN 202687851District 03Project Number: 7M6S-350 / /, section 23-00306-00-BR2 of 3$1,365,431+11%
24 APR 202661L86District 01Project Number: Tngj-657 / /, section 19-00510-00-BR1 of 2$4,604,844Low, 11% under the second
24 APR 202661M15District 01Mount Prospect, section 21-00174-00-BR1 of 3$10,744,243Low, 10% under the second
16 JAN 202661L19District 01Waukegan, section 20-00243-00-BR1 of 3$7,980,812Low, 0.0% under the second
16 JAN 202662D34District 01Section 95-B2 of 4$7,063,896+1.0%
16 JAN 202662K62District 01Section 2019-189-BR4 of 5$21,947,480+13%
16 JAN 202662K64District 01Section 2019-191-B-R5 of 5$17,413,801+25%
16 JAN 202662K65District 01Section 2019-192-B-R7 of 7$17,146,866+28%
16 JAN 202662U12District 01Section FAI5 of 6$13,807,645+24%
07 NOV 202561L82District 01Broadview, section 22-00086-00-BR1 of 5$2,582,436Low, 12% under the second
07 NOV 202561L88District 01Project Number: S00V-023 / /, section 19-00507-00-BR1 of 4$5,134,451Low, 14% under the second
07 NOV 202562R63District 011 of 6$15,646,955Low, 4.0% under the second
19 SEP 202561K52District 01Lake Forest, section 12-00094-00-BR1 of 3$4,297,627Low, 7.0% under the second
19 SEP 202585764District 02Project Number: 9Uaj-753 / /, section 18-00655-00-BR4 of 4$10,401,446+64%
07 MAR 202562P43District 01Section 2021-120-BR2 of 7$14,316,349+2.0%
17 JAN 202561K92District 01Project Number: Cugb-890 / /, section 18-00481-00-BR1 of 5$2,789,285Low, 4.0% under the second
13 DEC 202462T30District 01Section FAP7 of 8$2,010,763+35%
08 NOV 202461J87District 01Barrington, section 11-00087-02-GS4 of 7$72,116,108+4.0%
08 NOV 202462W30District 01Section (531-2-HB)BR1 of 4$10,802,029Low, 4.0% under the second
08 NOV 202462W38District 01Section (531)BR2 of 4$87,963,810+6.0%
20 SEP 202461G80District 01Hanover Park, section 15-00066-00-BR4 of 7$2,785,102+23%
14 JUN 202462U83District 01Section FAP1 of 2$27,446,572Low, 1.0% under the second
26 APR 202461J14District 01Project Number: 26Xm-359 / /, section 14-00124-04-BR1 of 3$8,419,194Low, 7.0% under the second
Dunnet Bay Construction Company: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy