Dunnet Bay Construction Company: IDOT bid record
Dunnet Bay Construction Company submitted 71 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 18 SEP 2026, and was the low bidder on 26 of them (37%). When it was not low, its total sat a median +9.0% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $229,609,557
- Latest bid
- 18 SEP 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 20 | 4 | 20% |
| 2022 | 11 | 4 | 36% |
| 2023 | 10 | 4 | 40% |
| 2024 | 12 | 5 | 42% |
| 2025 | 7 | 5 | 71% |
| 2026 | 11 | 4 | 36% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 01 | 65 | 26 | 40% |
| District 02 | 5 | 0 | 0% |
| District 03 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Trainees TPG | Z0076604 | HR | 67 | 67 (100%) | $15.00 | $15.00 |
| Trainees | Z0076600 | HR | 65 | 65 (100%) | $0.80 | $0.80 |
| Bit matls tack CT | 40600290 | LB | 64 | 52 (81%) | $0.01 | $0.01 |
| Perimeter eros bar | 28000400 | LF | 62 | 49 (79%) | $2.33 | $3.50 |
| Driving piles | 51202305 | LF | 42 | 40 (95%) | $0.01 | $0.10 |
| Temp eros contr seed | 28000250 | LB | 54 | 35 (65%) | $5.00 | $5.00 |
| Guardrail remov | 63200310 | LF | 46 | 34 (74%) | $6.42 | $8.00 |
| Name plates | 51500100 | EACH | 59 | 32 (54%) | $650.00 | $773.24 |
| Terminal marker - DA | 72501000 | EACH | 37 | 32 (86%) | $35.00 | $47.85 |
| Temp info signing | Z0030850 | SF | 47 | 30 (64%) | $16.00 | $18.00 |
| Changeable message SN | 70107025 | CAL DAY | 46 | 30 (65%) | $30.00 | $55.00 |
| Bit matls PR CT | 40600275 | LB | 32 | 30 (94%) | $0.01 | $0.01 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Lorig Construction Company | 57 | 28 of 57 |
| Herlihy Mid-Continent Company | 41 | 17 of 41 |
| F. H. Paschen, S.N. Nielsen & Associates LLC | 24 | 5 of 24 |
| Areatha Construction Co., Inc. | 23 | 8 of 23 |
| Alliance Contractors, Inc. | 18 | 4 of 18 |
| Copenhaver Construction, Inc. | 17 | 3 of 17 |
| IHC Construction Companies, L.L.C. | 15 | 4 of 15 |
| Rausch Infrastructure, LLC | 14 | 3 of 14 |
| Martam Construction Incorporated | 14 | 8 of 14 |
| D. Construction, Inc. | 14 | 9 of 14 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 SEP 2026 | 61L85 | District 01 | Project Number: 50B4-000 / /, section 18-00488-00-BR | 3 of 5 | $5,419,964 | +14% |
| 31 JUL 2026 | 61M13 | District 01 | Project Number: Qnyf-462 / /, section 12-00192-04-BR | 1 of 6 | $36,611,206 | Low, 4.0% under the second |
| 12 JUN 2026 | 87851 | District 03 | Project Number: 7M6S-350 / /, section 23-00306-00-BR | 2 of 3 | $1,365,431 | +11% |
| 24 APR 2026 | 61L86 | District 01 | Project Number: Tngj-657 / /, section 19-00510-00-BR | 1 of 2 | $4,604,844 | Low, 11% under the second |
| 24 APR 2026 | 61M15 | District 01 | Mount Prospect, section 21-00174-00-BR | 1 of 3 | $10,744,243 | Low, 10% under the second |
| 16 JAN 2026 | 61L19 | District 01 | Waukegan, section 20-00243-00-BR | 1 of 3 | $7,980,812 | Low, 0.0% under the second |
| 16 JAN 2026 | 62D34 | District 01 | Section 95-B | 2 of 4 | $7,063,896 | +1.0% |
| 16 JAN 2026 | 62K62 | District 01 | Section 2019-189-BR | 4 of 5 | $21,947,480 | +13% |
| 16 JAN 2026 | 62K64 | District 01 | Section 2019-191-B-R | 5 of 5 | $17,413,801 | +25% |
| 16 JAN 2026 | 62K65 | District 01 | Section 2019-192-B-R | 7 of 7 | $17,146,866 | +28% |
| 16 JAN 2026 | 62U12 | District 01 | Section FAI | 5 of 6 | $13,807,645 | +24% |
| 07 NOV 2025 | 61L82 | District 01 | Broadview, section 22-00086-00-BR | 1 of 5 | $2,582,436 | Low, 12% under the second |
| 07 NOV 2025 | 61L88 | District 01 | Project Number: S00V-023 / /, section 19-00507-00-BR | 1 of 4 | $5,134,451 | Low, 14% under the second |
| 07 NOV 2025 | 62R63 | District 01 | 1 of 6 | $15,646,955 | Low, 4.0% under the second | |
| 19 SEP 2025 | 61K52 | District 01 | Lake Forest, section 12-00094-00-BR | 1 of 3 | $4,297,627 | Low, 7.0% under the second |
| 19 SEP 2025 | 85764 | District 02 | Project Number: 9Uaj-753 / /, section 18-00655-00-BR | 4 of 4 | $10,401,446 | +64% |
| 07 MAR 2025 | 62P43 | District 01 | Section 2021-120-BR | 2 of 7 | $14,316,349 | +2.0% |
| 17 JAN 2025 | 61K92 | District 01 | Project Number: Cugb-890 / /, section 18-00481-00-BR | 1 of 5 | $2,789,285 | Low, 4.0% under the second |
| 13 DEC 2024 | 62T30 | District 01 | Section FAP | 7 of 8 | $2,010,763 | +35% |
| 08 NOV 2024 | 61J87 | District 01 | Barrington, section 11-00087-02-GS | 4 of 7 | $72,116,108 | +4.0% |
| 08 NOV 2024 | 62W30 | District 01 | Section (531-2-HB)BR | 1 of 4 | $10,802,029 | Low, 4.0% under the second |
| 08 NOV 2024 | 62W38 | District 01 | Section (531)BR | 2 of 4 | $87,963,810 | +6.0% |
| 20 SEP 2024 | 61G80 | District 01 | Hanover Park, section 15-00066-00-BR | 4 of 7 | $2,785,102 | +23% |
| 14 JUN 2024 | 62U83 | District 01 | Section FAP | 1 of 2 | $27,446,572 | Low, 1.0% under the second |
| 26 APR 2024 | 61J14 | District 01 | Project Number: 26Xm-359 / /, section 14-00124-04-BR | 1 of 3 | $8,419,194 | Low, 7.0% under the second |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.