IDOT contract 61K52 bid tabulation

Lake Forest, section 12-00094-00-BR. Let by Illinois DOT on September 19, 2025, Lake, District 01. 3 bids received; low bid $4,297,627 by Dunnet Bay Construction Company.

Owner
Illinois DOT
Letting
19 SEP 2025
Pay items
109
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Dunnet Bay Construction Company$4,297,627Low
2Copenhaver Construction, Inc.$4,594,597+7.0%
3Michels Construction, Inc.$5,490,274+28%
IDOT contract 61K52: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Dunnet Bay Construction Company2. Copenhaver Construction, Inc.3. Michels Construction, Inc.
1T-ostrya virg CL 7 (A2C05660)EACH2$382.00$925.00$500.00
2T-acer sacr 2 (A2001716)EACH2$390.00$650.00$500.00
3T-carp carol 2 (A2002516)EACH2$405.00$650.00$500.00
4T-tilia amer 2 (A2007816)EACH2$412.00$650.00$500.00
5F&E prec conc arch (XX009635)LS1$625,000$682,000$635,000
6Rem&recon wall loc 1 (XX009636)LF13$1,380.00$2,700.00$3,700.00
7Rem&recon wall loc 2 (XX009637)LF17$1,200.00$2,700.00$3,000.00
8Constrn VBRN monitrng (X0327357)LS1$26,950$35,000$85,000
9Explor trench SPL (X2130010)LF50$50.00$20.00$150.00
10Seeding CL 4 mod (X2501800)ACRE0.25$7,465.00$6,000.00$10,000
11Temp access- priv ent (X4021000)EACH2$2,000.00$200.00$25,000
12Brick pavt rem & repl (X4400062)SF254$20.00$34.00$25.00
13Concrete finish (X5030289)LS1$1.00$70,000$35,000
14Ornamental railing (X5090850)LF231$980.00$1,320.00$1,000.00
15THML ntgrty prof data (X5160106)LF480$33.50$22.00$58.00
16THML intgrty prof TST (X5160108)EACH8$575.00$2,000.00$2,000.00
17Pro SS conn to EX man (X5510011)EACH2$1,485.00$2,000.00$5,000.00
18Sanitary manhole adj (X6026050)EACH3$1,850.00$1,400.00$2,500.00
19Engrs FLD ofc TY A D1 (X6700407)CAL MO10$4,425.00$3,500.00$15,000
20Traf cont & prot SPL (X7010216)LS1$20,000$270,000$30,000
21Temp info signing (X7200061)SF40$15.00$27.00$34.00
22Construction layout (Z0013798)LS1$45,000$75,000$45,000
23Storm sew WM req 12 (Z0056608)LF15$350.00$310.00$600.00
24Trainees (Z0076600)HR1,500$0.80$0.80$0.80
25Trainees TPG (Z0076604)HR1,500$15.00$15.00$15.00
26Temporary fence (20101000)LF560$3.00$3.00$4.00
27Tree trunk protection (20101100)EACH12$150.00$100.00$205.00
28Tree root pruning (20101200)EACH2$124.00$20.00$170.00
29Nitrogen fert nutr (20101400)LB8$3.00$10.00$4.00
30Phosphorus fert nutr (20101500)LB8$3.00$10.00$4.00
31Potassium fert nutr (20101600)LB8$3.00$10.00$4.00
32Earth excavation (20200100)CY50$150.00$60.00$325.00
33Rem & disp uns matl (20201200)CY40$200.00$60.00$140.00
34Furnished excavation (20400800)CY280$110.00$20.00$135.00
35Trench backfill (20800150)CY8$23.00$85.00$99.00
36Geotech fab F/GR stab (21001000)SY119$21.00$3.00$50.00
37Topsoil exc & plac (21101505)CY95$210.00$10.00$500.00
38Topsoil F & P 4 (21101615)SY50$6.00$15.00$330.00
39Grading & shap ditch (21400100)LF6$350.00$250.00$1,320.00
40Wildlife friendly ecb (25100645)SY94$1.70$25.00$2.00
41Turf reinf mat (25100900)SY628$4.40$10.00$6.00
42Sodding salt tolerant (25200110)SY578$16.00$26.00$22.00
43Supple watering (25200200)UNIT20$0.01$1.00$0.01
44Temp eros contr seed (28000250)LB50$3.00$5.00$4.00
45Perimeter eros bar (28000400)LF258$2.00$10.00$2.75
46Inlet filters (28000510)EACH7$217.00$350.00$475.00
47Stone riprap CL A4 (28100107)SY8$525.00$310.00$850.00
48Filter fabric (28200200)SY8$10.00$15.00$750.00
49Agg subgrade improve (30300001)CY40$260.00$65.00$450.00
50Agg subgrade impr 12 (30300112)SY554$33.00$20.00$135.00
51Sub gran mat B 4 (31101200)SY554$15.00$12.00$110.00
52HMA base cse 10 (35501324)SY474$65.00$65.00$100.00
53Bit matls PR CT (40600275)LB1,068$0.01$0.01$0.01
54Bit matls tack CT (40600290)LB427$0.01$0.01$0.01
55Long joint sealant (40600370)LF378$29.20$30.00$42.00
56HMA BC IL-19.0 N50 (40603080)TON60$185.00$185.00$300.00
57HMA SC IL-9.5 D N50 (40604060)TON40$235.00$235.00$300.00
58PC conc sidewalk 5 (42400200)SF466$16.00$17.00$17.00
59Detectable warnings (42400800)SF20$45.00$52.00$60.00
60Pavement rem (44000100)SY475$28.00$17.00$100.00
61Comb curb gutter rem (44000500)LF216$11.45$10.00$100.00
62Sidewalk rem (44000600)SF449$5.00$5.00$50.00
63Rem exist struct (50100100)EACH1$800,000$450,000$535,000
64Structure excavation (50200100)CY135$100.00$89.00$200.00
65Conc struct (50300225)CY153.30$2,000.00$1,950.00$2,200.00
66Conc sup-STR (50300255)CY198.70$2,750.00$2,100.00$3,200.00
67BR deck grooving (50300260)SY273$15.25$27.00$18.00
68Protective coat (50300300)SY549$2.20$4.00$6.00
69Conc supstr app slab (50301350)CY40.40$800.00$1,700.00$1,600.00
70Reinf bars, epoxy CTD (50800205)LB186,850$1.80$2.20$2.00
71Mechanical splicers (50800530)EACH536$0.01$150.00$200.00
72Fur STL pile HP14X73 (51201800)LF480$100.00$155.00$115.00
73Driving piles (51202305)LF480$0.01$1.00$36.00
74Test pile ST HP14X73 (51203800)EACH2$12,000$8,500.00$8,600.00
75Pile shoes (51204650)EACH10$145.00$200.00$180.00
76Name plates (51500100)EACH1$600.00$2,000.00$1,000.00
77Permanent casing (51602000)LF320$590.00$350.00$700.00
78Drilled shaft in soil (51603000)CY171.10$1,200.00$2,500.00$2,800.00
79PRC flar end sec 12 (54213657)EACH1$4,485.00$1,000.00$7,000.00
80Storm sew CL A 1 12 (550A0050)LF18$185.00$270.00$600.00
81Storm sew CL A 2 12 (550A0340)LF69$185.00$180.00$350.00
82Storm sewer rem 8 (55100300)LF20$10.00$30.00$350.00
83Granular backfill STR (58600101)CY134$58.00$75.00$400.00
84Concrete sealer (58700300)SF5,434$2.83$1.00$3.00
85Geocomposite wall DR (59100100)SY58$20.00$40.00$10.00
86Conc HDWL for P drain (60100060)EACH2$1,880.00$2,000.00$10,000
87P undr for struct 4 (60146304)LF76$55.00$40.00$80.00
88P undr for struct SPL 4 (60146305)LF22$100.00$50.00$200.00
89CB TA 4 dia T23F&G (60201330)EACH1$8,950.00$5,500.00$5,500.00
90CB TA T8G (60207000)EACH1$4,785.00$4,000.00$6,000.00
91CB TC T23F&G (60208230)EACH1$5,150.00$3,000.00$6,000.00
92Man TA 4 dia T1F CL (60218400)EACH2$35,000$6,000.00$9,000.00
93Inlets TA T23F&G (60237460)EACH1$3,650.00$1,900.00$4,000.00
94CB reconst (60252800)EACH1$1,450.00$1,000.00$2,500.00
95Man adjust (60255500)EACH2$650.00$600.00$1,500.00
96Inlets adjust (60260100)EACH1$650.00$500.00$1,000.00
97Grates T8 (60402210)EACH1$385.00$600.00$1,000.00
98FR & grates T23 (60404940)EACH1$550.00$600.00$1,200.00
99Remov catch bas (60500050)EACH2$385.00$700.00$5,000.00
100Comb CC&G TB6.12 (60603800)LF205$20.00$41.00$65.00
101Sight SCRN (CLF) 6 (64000110)LF314$115.35$110.00$100.00
102CH LK gates 6X12 DBL (66407600)EACH3$3,144.83$4,000.00$4,500.00
103Mobilization (67100100)LS1$257,858$280,000$335,000
104Remov sin pan assy TA (72400100)EACH2$75.00$120.00$100.00
105Remov sign panel T1 (72400310)SF5$12.00$31.00$20.00
106THPL PVT MK line 6 (78000400)LF39$35.00$40.00$34.00
107THPL PVT MK line 12 (78000600)LF47$70.00$70.00$35.00
108THPL PVT MK line 24 (78000650)LF9$140.00$170.00$40.00
109Raised refl pavt MKR (78100100)EACH2$750.00$2,000.00$100.00
IDOT contract 61K52: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of September 19, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy