Copenhaver Construction, Inc.: IDOT bid record
Copenhaver Construction, Inc. submitted 145 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 07 NOV 2025, and was the low bidder on 11 of them (8%). When it was not low, its total sat a median +20% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $27,746,177
- Latest bid
- 07 NOV 2025
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 69 | 6 | 9% |
| 2022 | 32 | 1 | 3% |
| 2023 | 20 | 4 | 20% |
| 2025 | 24 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 01 | 129 | 11 | 9% |
| District 02 | 11 | 0 | 0% |
| District 03 | 5 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Trainees TPG | Z0076604 | HR | 95 | 95 (100%) | $15.00 | $15.00 |
| Trainees | Z0076600 | HR | 85 | 85 (100%) | $0.80 | $0.80 |
| Nitrogen fert nutr | 25000400 | LB | 77 | 49 (64%) | $1.00 | $3.00 |
| Potassium fert nutr | 25000600 | LB | 77 | 49 (64%) | $1.00 | $3.00 |
| Agg subgrade impr 12 | 30300112 | SY | 68 | 40 (59%) | $13.62 | $21.00 |
| Topsoil exc & plac | 21101505 | CY | 46 | 33 (72%) | $14.00 | $27.00 |
| Trench backfill | 20800150 | CY | 73 | 32 (44%) | $39.00 | $55.00 |
| Topsoil F & P 4 | 21101615 | SY | 62 | 31 (50%) | $5.00 | $6.60 |
| Tree root pruning | 20101200 | EACH | 47 | 31 (66%) | $50.00 | $125.00 |
| Bit matls tack CT | 40600290 | LB | 92 | 30 (33%) | $0.10 | $0.01 |
| Pipe underdr T 2 4 | 60108204 | LF | 40 | 28 (70%) | $15.50 | $27.59 |
| Inlet filters | 28000510 | EACH | 94 | 26 (28%) | $100.00 | $180.20 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Alliance Contractors, Inc. | 90 | 60 of 90 |
| Martam Construction Incorporated | 83 | 58 of 83 |
| Lorig Construction Company | 46 | 32 of 46 |
| Herlihy Mid-Continent Company | 33 | 22 of 33 |
| R. W. Dunteman Company | 27 | 21 of 27 |
| A Lamp Concrete Contractors, Inc. | 24 | 20 of 24 |
| Landmark Contractors, Inc. | 23 | 16 of 23 |
| D. Construction, Inc. | 23 | 20 of 23 |
| Berger Excavating Contractors, Inc. | 21 | 18 of 21 |
| MYS, Incorporated | 21 | 13 of 21 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 07 NOV 2025 | 61J54 | District 01 | Project Number: Whf6-372 / /, section 16-F3000-15-BT | 2 of 3 | $7,233,472 | +4.0% |
| 07 NOV 2025 | 61K01 | District 01 | Elmhurst, section 17-00188-00-SW | 4 of 7 | $2,809,524 | +6.0% |
| 07 NOV 2025 | 61L88 | District 01 | Project Number: S00V-023 / /, section 19-00507-00-BR | 4 of 4 | $6,712,395 | +31% |
| 07 NOV 2025 | 87843 | District 03 | Project Number:, section 21-P4006-03-BT | 2 of 4 | $1,696,862 | +7.0% |
| 19 SEP 2025 | 61K52 | District 01 | Lake Forest, section 12-00094-00-BR | 2 of 3 | $4,594,597 | +7.0% |
| 19 SEP 2025 | 61L28 | District 01 | Project Number: 0Eiw-017 / /, section 19-00514-00-WR | 3 of 4 | $13,599,631 | +13% |
| 19 SEP 2025 | 61L35 | District 01 | Hanover Park, section 24-00078-00-BT | 4 of 6 | $1,603,598 | +19% |
| 19 SEP 2025 | 61L69 | District 01 | Elmhurst, section 19-00197-00-BT | 3 of 6 | $4,036,376 | +11% |
| 19 SEP 2025 | 61L70 | District 01 | Barrington, section 24-00093-00-SW | 7 of 10 | $321,232 | +46% |
| 19 SEP 2025 | 61L74 | District 01 | Hampshire, section 24-00021-00-SW | 6 of 8 | $604,224 | +70% |
| 19 SEP 2025 | 62B64 | District 01 | Section (430Y)N-1 | 5 of 5 | $3,260,263 | +34% |
| 19 SEP 2025 | 62U11 | District 01 | Section 2022 | 3 of 3 | $2,010,598 | +31% |
| 01 AUG 2025 | 61L46 | District 01 | Hanover Park, section 19-00070-00-BT | 6 of 7 | $1,635,257 | +15% |
| 01 AUG 2025 | 61L58 | District 01 | Carpentersville, section 22-00094-00-FP | 8 of 8 | $5,636,694 | +11% |
| 07 MAR 2025 | 61L05 | District 01 | Lake Forest, section 19-00093-00-SW | 5 of 5 | $4,748,197 | +59% |
| 07 MAR 2025 | 61L10 | District 01 | Bloomingdale, section 23-00080-00-SW | 3 of 5 | $245,106 | +9.0% |
| 07 MAR 2025 | 61L16 | District 01 | Lake Forest, section 23-00099-00-SW | 5 of 6 | $335,918 | +36% |
| 07 MAR 2025 | 62R73 | District 01 | Section FAP | 3 of 4 | $3,236,517 | +10% |
| 17 JAN 2025 | 61K43 | District 01 | Cary, section 22-00074-00-MS | 4 of 4 | $1,423,197 | +20% |
| 17 JAN 2025 | 61K68 | District 01 | Elgin, section 20-00189-00-PV | 4 of 4 | $11,812,218 | +19% |
| 17 JAN 2025 | 61K92 | District 01 | Project Number: Cugb-890 / /, section 18-00481-00-BR | 2 of 5 | $2,893,292 | +4.0% |
| 17 JAN 2025 | 61K98 | District 01 | Batavia, section 22-00088-00-SW | 8 of 8 | $719,230 | +74% |
| 17 JAN 2025 | 62W32 | District 01 | Section (12-B-1)BR | 3 of 4 | $752,547 | +22% |
| 17 JAN 2025 | 62X80 | District 01 | Section 2024-1040-MOW(EXP) | 2 of 2 | $1,137,700 | +73% |
| 17 NOV 2023 | 61J35 | District 01 | Batavia, section 16-00086-01-FP | 1 of 4 | $3,934,612 | Low, 0.0% under the second |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.