Copenhaver Construction, Inc.: IDOT bid record

Copenhaver Construction, Inc. submitted 145 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 07 NOV 2025, and was the low bidder on 11 of them (8%). When it was not low, its total sat a median +20% above the low bid.

Owner
Illinois DOT
Low bid volume
$27,746,177
Latest bid
07 NOV 2025
Data through
18 SEP 2026
145Bids
11Low bids
8Win rate, percent
+20%Median gap to the low bid when not low, 134 bids

By year

YearBidsLow bidsWin rate
20216969%
20223213%
202320420%
20252400%
Copenhaver Construction, Inc., IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 01129119%
District 021100%
District 03500%
Copenhaver Construction, Inc., IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Trainees TPGZ0076604HR9595 (100%)$15.00$15.00
TraineesZ0076600HR8585 (100%)$0.80$0.80
Nitrogen fert nutr25000400LB7749 (64%)$1.00$3.00
Potassium fert nutr25000600LB7749 (64%)$1.00$3.00
Agg subgrade impr 1230300112SY6840 (59%)$13.62$21.00
Topsoil exc & plac21101505CY4633 (72%)$14.00$27.00
Trench backfill20800150CY7332 (44%)$39.00$55.00
Topsoil F & P 421101615SY6231 (50%)$5.00$6.60
Tree root pruning20101200EACH4731 (66%)$50.00$125.00
Bit matls tack CT40600290LB9230 (33%)$0.10$0.01
Pipe underdr T 2 460108204LF4028 (70%)$15.50$27.59
Inlet filters28000510EACH9426 (28%)$100.00$180.20
Copenhaver Construction, Inc., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Copenhaver Construction, Inc., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
07 NOV 202561J54District 01Project Number: Whf6-372 / /, section 16-F3000-15-BT2 of 3$7,233,472+4.0%
07 NOV 202561K01District 01Elmhurst, section 17-00188-00-SW4 of 7$2,809,524+6.0%
07 NOV 202561L88District 01Project Number: S00V-023 / /, section 19-00507-00-BR4 of 4$6,712,395+31%
07 NOV 202587843District 03Project Number:, section 21-P4006-03-BT2 of 4$1,696,862+7.0%
19 SEP 202561K52District 01Lake Forest, section 12-00094-00-BR2 of 3$4,594,597+7.0%
19 SEP 202561L28District 01Project Number: 0Eiw-017 / /, section 19-00514-00-WR3 of 4$13,599,631+13%
19 SEP 202561L35District 01Hanover Park, section 24-00078-00-BT4 of 6$1,603,598+19%
19 SEP 202561L69District 01Elmhurst, section 19-00197-00-BT3 of 6$4,036,376+11%
19 SEP 202561L70District 01Barrington, section 24-00093-00-SW7 of 10$321,232+46%
19 SEP 202561L74District 01Hampshire, section 24-00021-00-SW6 of 8$604,224+70%
19 SEP 202562B64District 01Section (430Y)N-15 of 5$3,260,263+34%
19 SEP 202562U11District 01Section 20223 of 3$2,010,598+31%
01 AUG 202561L46District 01Hanover Park, section 19-00070-00-BT6 of 7$1,635,257+15%
01 AUG 202561L58District 01Carpentersville, section 22-00094-00-FP8 of 8$5,636,694+11%
07 MAR 202561L05District 01Lake Forest, section 19-00093-00-SW5 of 5$4,748,197+59%
07 MAR 202561L10District 01Bloomingdale, section 23-00080-00-SW3 of 5$245,106+9.0%
07 MAR 202561L16District 01Lake Forest, section 23-00099-00-SW5 of 6$335,918+36%
07 MAR 202562R73District 01Section FAP3 of 4$3,236,517+10%
17 JAN 202561K43District 01Cary, section 22-00074-00-MS4 of 4$1,423,197+20%
17 JAN 202561K68District 01Elgin, section 20-00189-00-PV4 of 4$11,812,218+19%
17 JAN 202561K92District 01Project Number: Cugb-890 / /, section 18-00481-00-BR2 of 5$2,893,292+4.0%
17 JAN 202561K98District 01Batavia, section 22-00088-00-SW8 of 8$719,230+74%
17 JAN 202562W32District 01Section (12-B-1)BR3 of 4$752,547+22%
17 JAN 202562X80District 01Section 2024-1040-MOW(EXP)2 of 2$1,137,700+73%
17 NOV 202361J35District 01Batavia, section 16-00086-01-FP1 of 4$3,934,612Low, 0.0% under the second
Copenhaver Construction, Inc.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy