IDOT contract 61L35 bid tabulation
Hanover Park, section 24-00078-00-BT. Let by Illinois DOT on September 19, 2025, Cook, District 01. 6 bids received; low bid $1,344,596 by A Lamp Concrete Contractors, Inc..
- Owner
- Illinois DOT
- Letting
- 19 SEP 2025
- Pay items
- 101
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | A Lamp Concrete Contractors, Inc. | $1,344,596 | Low |
| 2 | Martam Construction Incorporated | $1,528,287 | +14% |
| 3 | R. W. Dunteman Company | $1,595,784 | +19% |
| 4 | Copenhaver Construction, Inc. | $1,603,598 | +19% |
| 5 | PirTano Construction Co., LLC | $1,700,000 | +26% |
| 6 | Alliance Contractors, Inc. | $1,813,621 | +35% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. A Lamp Concrete Contractors, Inc. | 2. Martam Construction Incorporated | 3. R. W. Dunteman Company | 4. Copenhaver Construction, Inc. | 5. PirTano Construction Co., LLC | 6. Alliance Contractors, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | P PL ornament T gal P (K0012990) | UNIT | 1 | $2,400.00 | $3,640.00 | $3,500.00 | $2,500.00 | $3,025.00 | $3,500.00 |
| 2 | Weed contr pre-EM GRN (K0029634) | LB | 2 | $50.00 | $52.00 | $50.00 | $300.00 | $56.00 | $50.00 |
| 3 | Mulch placement 2 (K0036117) | SY | 20 | $10.00 | $10.40 | $10.00 | $12.00 | $11.00 | $10.00 |
| 4 | Rem&rel GRD elec ser (XX009733) | EACH | 1 | $3,600.00 | $3,744.00 | $3,600.00 | $4,700.00 | $1,975.00 | $3,600.00 |
| 5 | EM veh P S LSC 20 3C (X0324085) | LF | 150 | $1.30 | $1.35 | $1.30 | $2.00 | $6.50 | $1.30 |
| 6 | Washout basin (X0326806) | LS | 1 | $1,250.00 | $1,373.95 | $2,000.00 | $1,200.00 | $2,340.00 | $750.00 |
| 7 | Relocate bench (X0327149) | EACH | 1 | $675.00 | $1,956.39 | $1,800.00 | $600.00 | $970.00 | $4,150.00 |
| 8 | Remove exstng BR pav (X0327989) | SF | 9,133 | $1.60 | $3.05 | $4.10 | $3.00 | $3.00 | $4.00 |
| 9 | Ped signal post 10 FT (X1400367) | EACH | 5 | $1,576.00 | $1,639.04 | $1,576.00 | $1,900.00 | $1,580.00 | $1,576.00 |
| 10 | Ped signal post 5 FT (X1400378) | EACH | 3 | $1,352.00 | $1,406.08 | $1,352.00 | $1,600.00 | $1,210.00 | $1,352.00 |
| 11 | Stamp col PCC SDWLK 5 (X1700067) | SF | 7,870 | $15.00 | $23.37 | $20.35 | $25.00 | $26.75 | $50.00 |
| 12 | Explor trench SPL (X2130010) | LF | 100 | $10.00 | $45.09 | $52.30 | $20.00 | $170.00 | $20.00 |
| 13 | Temp access- com ent (X4022000) | EACH | 2 | $500.00 | $985.66 | $480.00 | $200.00 | $2,330.00 | $1.00 |
| 14 | Sanitary manhole adj (X6026050) | EACH | 1 | $1,300.00 | $1,355.96 | $1,150.00 | $1,500.00 | $2,075.00 | $695.00 |
| 15 | Intercept EX conduit (X8100863) | EACH | 1 | $715.00 | $743.60 | $715.00 | $900.00 | $525.00 | $715.00 |
| 16 | Rebld EX DBL handhole (X8140238) | EACH | 4 | $4,643.00 | $4,828.72 | $4,643.00 | $5,600.00 | $4,435.00 | $4,643.00 |
| 17 | APS ext bracket (X8760002) | EACH | 1 | $438.00 | $455.52 | $438.00 | $500.00 | $315.00 | $438.00 |
| 18 | Accessible ped signal (X8760200) | EACH | 22 | $2,406.00 | $2,502.24 | $2,406.00 | $2,800.00 | $2,225.00 | $2,406.00 |
| 19 | Conc FDN TY A 12D (X8780012) | LF | 36 | $369.00 | $383.76 | $369.00 | $470.00 | $325.00 | $369.00 |
| 20 | Construction layout (Z0013798) | LS | 1 | $13,900 | $17,046 | $13,900 | $17,000 | $30,000 | $13,900 |
| 21 | RE-optimize TR sig sys 1 (Z0033044) | EACH | 5 | $1,340.00 | $1,393.60 | $1,340.00 | $1,800.00 | $615.00 | $1,340.00 |
| 22 | Trainees (Z0076600) | HR | 500 | $0.80 | $0.80 | $0.80 | $0.80 | $0.80 | $0.80 |
| 23 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 24 | Temporary fence (20101000) | LF | 125 | $6.00 | $10.40 | $10.00 | $6.00 | $8.00 | $10.00 |
| 25 | Earth excavation (20200100) | CY | 1,125 | $58.00 | $35.94 | $67.00 | $45.00 | $45.00 | $10.00 |
| 26 | Rem & disp uns matl (20201200) | CY | 1,154 | $15.00 | $35.90 | $67.00 | $45.00 | $35.00 | $10.00 |
| 27 | Furnished excavation (20400800) | CY | 26 | $1.00 | $65.43 | $108.50 | $10.00 | $1.00 | $20.00 |
| 28 | Topsoil F & P 4 (21101615) | SY | 6,992 | $6.50 | $0.10 | $0.10 | $4.00 | $10.00 | $0.10 |
| 29 | Seeding CL 2A (25000210) | ACRE | 1.50 | $5,500.00 | $25,168 | $24,200 | $6,000.00 | $3,100.00 | $24,200 |
| 30 | Nitrogen fert nutr (25000400) | LB | 131 | $3.00 | $1.04 | $1.00 | $1.00 | $3.00 | $1.00 |
| 31 | Potassium fert nutr (25000600) | LB | 131 | $3.00 | $1.04 | $1.00 | $1.00 | $3.00 | $1.00 |
| 32 | Erosion contr blanket (25100630) | SY | 6,992 | $1.25 | $1.56 | $1.50 | $2.00 | $1.00 | $1.50 |
| 33 | Supple watering (25200200) | UNIT | 1 | $100.00 | $260.00 | $250.00 | $0.01 | $28.00 | $250.00 |
| 34 | Temp eros contr seed (28000250) | LB | 145 | $5.00 | $0.10 | $0.10 | $0.01 | $7.00 | $0.10 |
| 35 | Perimeter eros bar (28000400) | LF | 3,092 | $1.00 | $2.86 | $2.75 | $3.00 | $2.25 | $2.75 |
| 36 | Inlet filters (28000510) | EACH | 29 | $15.00 | $234.00 | $185.00 | $200.00 | $300.00 | $25.00 |
| 37 | Agg base cse B 4 (35101600) | SY | 1,874 | $9.85 | $6.03 | $12.75 | $12.00 | $12.00 | $7.20 |
| 38 | Agg base cse B 8 (35102000) | SY | 2,186 | $20.00 | $9.81 | $17.25 | $16.00 | $22.00 | $14.40 |
| 39 | HMA base cse 8 (35501316) | SY | 182 | $61.00 | $176.05 | $80.00 | $120.00 | $121.50 | $100.80 |
| 40 | Preparation of base (35800100) | SY | 4,395 | $0.01 | $1.56 | $1.50 | $3.00 | $3.50 | $1.90 |
| 41 | Bit matls PR CT (40600275) | LB | 9,888 | $0.01 | $0.01 | $0.01 | $0.01 | $1.00 | $0.01 |
| 42 | HMA SC IL-9.5 D N50 (40604060) | TON | 527 | $130.00 | $150.28 | $140.00 | $160.00 | $155.00 | $118.00 |
| 43 | PCC driveway pavt 8 (42300400) | SY | 314 | $122.00 | $115.76 | $86.50 | $125.00 | $90.00 | $116.10 |
| 44 | PC conc sidewalk 5 (42400200) | SF | 8,993 | $8.50 | $10.34 | $8.75 | $12.00 | $10.50 | $20.00 |
| 45 | Detectable warnings (42400800) | SF | 447 | $35.00 | $43.12 | $37.25 | $35.00 | $46.00 | $40.00 |
| 46 | HMA surf rem 2 (44000157) | SY | 2,442 | $8.50 | $7.80 | $13.96 | $9.00 | $5.00 | $20.00 |
| 47 | Drive pavement rem (44000200) | SY | 472 | $16.50 | $10.21 | $27.50 | $16.00 | $21.00 | $20.00 |
| 48 | Comb curb gutter rem (44000500) | LF | 912 | $8.25 | $5.18 | $16.00 | $8.00 | $9.00 | $15.00 |
| 49 | Sidewalk rem (44000600) | SF | 8,785 | $1.00 | $1.84 | $2.50 | $2.00 | $4.00 | $2.00 |
| 50 | CL C patch T2 11 (44201365) | SY | 26 | $275.00 | $267.56 | $345.00 | $190.00 | $350.00 | $260.00 |
| 51 | CL C patch T4 11 (44201371) | SY | 338 | $140.00 | $210.69 | $256.00 | $155.00 | $240.00 | $237.25 |
| 52 | CL D patch T2 11 (44201777) | SY | 10 | $330.00 | $250.19 | $258.00 | $200.00 | $775.00 | $1,100.00 |
| 53 | CL D patch T4 11 (44201783) | SY | 106 | $125.00 | $245.19 | $120.00 | $190.00 | $330.00 | $274.00 |
| 54 | Fire hydnts to BE MVD (56400100) | EACH | 6 | $6,500.00 | $5,324.52 | $9,450.00 | $5,000.00 | $6,050.00 | $8,732.00 |
| 55 | Man adjust (60255500) | EACH | 5 | $425.00 | $808.47 | $550.00 | $600.00 | $1,250.00 | $350.00 |
| 56 | Inlets adj new T1F OL (60260300) | EACH | 2 | $1,100.00 | $1,198.08 | $1,125.00 | $500.00 | $1,550.00 | $350.00 |
| 57 | VV adjust (60265700) | EACH | 6 | $575.00 | $808.47 | $550.00 | $300.00 | $1,135.00 | $350.00 |
| 58 | FR & grates adjust (60300105) | EACH | 3 | $450.00 | $808.48 | $465.00 | $500.00 | $1,135.00 | $350.00 |
| 59 | Conc curb TB (60600605) | LF | 754 | $38.00 | $39.71 | $34.50 | $45.00 | $42.00 | $1.00 |
| 60 | Comb CC&G TB6.12 (60603800) | LF | 274 | $44.00 | $56.99 | $37.00 | $39.00 | $45.00 | $139.75 |
| 61 | Comb CC&G TB6.18 (60604400) | LF | 50 | $58.00 | $63.96 | $60.50 | $42.00 | $57.00 | $144.15 |
| 62 | Comb CC&G TY B-6.24 (60605000) | LF | 537 | $52.00 | $67.10 | $45.00 | $40.00 | $52.00 | $145.80 |
| 63 | BCK SD prot of GRDRL (63000035) | LF | 90 | $25.34 | $26.35 | $55.75 | $45.00 | $29.00 | $25.34 |
| 64 | Non SPL waste disposl (66900200) | CY | 442 | $85.00 | $88.82 | $101.50 | $90.00 | $75.00 | $69.70 |
| 65 | Soil disposal analy (66900530) | EACH | 3 | $850.00 | $884.00 | $850.00 | $1,600.00 | $1,000.00 | $1,500.00 |
| 66 | Reg sub P-const plan (66901001) | LS | 1 | $5,200.00 | $5,408.00 | $5,200.00 | $4,000.00 | $1,500.00 | $4,200.00 |
| 67 | Reg sub F con report (66901003) | LS | 1 | $500.00 | $520.00 | $500.00 | $2,500.00 | $1,000.00 | $500.00 |
| 68 | Reg sub mon (66901006) | CAL DAY | 15 | $700.00 | $728.00 | $700.00 | $800.00 | $800.00 | $1,500.00 |
| 69 | Mobilization (67100100) | LS | 1 | $80,640 | $91,697 | $101,000 | $103,000 | $102,000 | $122,893 |
| 70 | TR cont & prot 701606 (70102625) | LS | 1 | $80,000 | $1.04 | $44,750 | $49,000 | $1.00 | $9,500.00 |
| 71 | TR cont & prot 701601 (70102630) | LS | 1 | $1.00 | $75,460 | $10,460 | $100.00 | $28,000 | $1.00 |
| 72 | TR cont & prot 701701 (70102635) | LS | 1 | $1.00 | $1.04 | $10,460 | $100.00 | $1.00 | $1.00 |
| 73 | TR cont & prot 701801 (70102640) | LS | 1 | $1.00 | $1.04 | $2.05 | $1,000.00 | $11,673 | $1.00 |
| 74 | Mod ureth PM line 6 (78009006) | LF | 2,101 | $1.90 | $1.98 | $1.90 | $2.00 | $2.50 | $1.90 |
| 75 | Mod ureth PM line 12 (78009012) | LF | 2,571 | $3.30 | $3.43 | $3.30 | $4.00 | $7.50 | $3.30 |
| 76 | Mod ureth PM line 24 (78009024) | LF | 22 | $6.00 | $6.24 | $6.00 | $7.00 | $14.00 | $6.00 |
| 77 | PVT MKG rem grinding (78300201) | SF | 55 | $14.00 | $14.56 | $14.00 | $20.00 | $2.00 | $14.00 |
| 78 | Undrgrd C galvs 2 (81028200) | LF | 148 | $30.60 | $31.82 | $30.60 | $40.00 | $50.00 | $30.60 |
| 79 | Undrgrd C galvs 3 (81028220) | LF | 71 | $64.20 | $66.77 | $64.32 | $80.00 | $62.00 | $64.20 |
| 80 | Main EX TR sig instal (85000200) | EACH | 5 | $4,800.00 | $4,992.00 | $4,800.00 | $6,200.00 | $6,215.00 | $4,800.00 |
| 81 | Elcbl C signal 14 2C (87301215) | LF | 3,092 | $2.00 | $2.08 | $2.00 | $3.00 | $3.00 | $2.00 |
| 82 | Elcbl C signal 14 3C (87301225) | LF | 2,505 | $2.20 | $2.29 | $2.20 | $3.00 | $3.00 | $2.20 |
| 83 | Elcbl C signal 14 5C (87301245) | LF | 2,130 | $2.60 | $2.70 | $2.60 | $3.00 | $3.50 | $2.60 |
| 84 | Elcbl C signal 14 7C (87301255) | LF | 219 | $3.00 | $3.12 | $3.00 | $4.00 | $4.00 | $3.00 |
| 85 | Elcbl C serv 6 2C (87301805) | LF | 75 | $4.20 | $4.37 | $4.20 | $6.00 | $7.00 | $4.20 |
| 86 | Elcbl C egrdc 6 1C (87301900) | LF | 457 | $2.80 | $2.91 | $2.80 | $4.00 | $4.00 | $2.80 |
| 87 | TS post 16 (87501200) | EACH | 4 | $2,514.00 | $2,614.56 | $2,514.00 | $3,000.00 | $2,875.00 | $2,514.00 |
| 88 | STL comb maa&P 48 (87702970) | EACH | 1 | $31,830 | $33,103 | $31,830 | $36,000 | $31,000 | $31,830 |
| 89 | Conc FDN TY A (87800100) | LF | 20 | $322.80 | $335.71 | $322.80 | $400.00 | $350.00 | $322.80 |
| 90 | Conc FDN TY E 36D (87800415) | LF | 13 | $622.50 | $647.40 | $622.50 | $780.00 | $485.00 | $622.50 |
| 91 | Drill EX handhole (87900200) | EACH | 14 | $617.00 | $641.68 | $617.00 | $790.00 | $770.00 | $617.00 |
| 92 | Ped SH LED 1F BM CDT (88102717) | EACH | 10 | $574.00 | $596.96 | $574.00 | $670.00 | $830.00 | $574.00 |
| 93 | Reloc EX sig head (89500100) | EACH | 10 | $917.00 | $953.68 | $917.00 | $1,200.00 | $985.00 | $917.00 |
| 94 | Reloc EX ped sig head (89500200) | EACH | 5 | $617.00 | $641.68 | $617.00 | $800.00 | $525.00 | $617.00 |
| 95 | Reloc EX TS post (89501150) | EACH | 1 | $917.00 | $953.68 | $917.00 | $1,200.00 | $740.00 | $917.00 |
| 96 | Rel EM veh PR sys D U (89501400) | EACH | 1 | $536.00 | $557.44 | $536.00 | $700.00 | $770.00 | $536.00 |
| 97 | Mod EX contr (89502200) | EACH | 3 | $1,782.00 | $1,853.28 | $1,782.00 | $2,300.00 | $1,115.00 | $1,782.00 |
| 98 | Rem elcbl FR con (89502300) | LF | 4,747 | $0.60 | $0.62 | $0.60 | $1.00 | $2.00 | $0.60 |
| 99 | Remov EX TS equip (89502375) | EACH | 5 | $2,400.00 | $2,496.00 | $2,400.00 | $3,100.00 | $3,450.00 | $2,400.00 |
| 100 | Rebuild EX handhole (89502376) | EACH | 6 | $3,493.00 | $3,632.72 | $3,493.00 | $4,400.00 | $2,935.00 | $3,493.00 |
| 101 | Remov EX conc FDN (89502385) | EACH | 7 | $600.00 | $624.00 | $600.00 | $800.00 | $1,020.00 | $600.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of September 19, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.