PirTano Construction Co., LLC: IDOT bid record
PirTano Construction Co., LLC submitted 15 bids on Illinois DOT contracts in the data, from 08 MAR 2024 to 31 JUL 2026, and was the low bidder on 2 of them (13%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $5,328,410
- Latest bid
- 31 JUL 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2024 | 4 | 0 | 0% |
| 2025 | 9 | 2 | 22% |
| 2026 | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Bit matls tack CT | 40600290 | LB | 12 | 9 (75%) | $0.01 | $0.01 |
| Trainees TPG | Z0076604 | HR | 9 | 9 (100%) | $15.00 | $15.00 |
| Trainees | Z0076600 | HR | 9 | 9 (100%) | $0.80 | $0.80 |
| Reg sub mon | 66901006 | CAL DAY | 14 | 8 (57%) | $700.00 | $820.00 |
| Bit matls PR CT | 40600275 | LB | 12 | 8 (67%) | $0.01 | $0.01 |
| Soil disposal analy | 66900530 | EACH | 14 | 7 (50%) | $1,100.00 | $1,470.00 |
| Nitrogen fert nutr | 25000400 | LB | 12 | 7 (58%) | $3.00 | $3.00 |
| Potassium fert nutr | 25000600 | LB | 12 | 7 (58%) | $3.00 | $3.00 |
| Temp eros contr seed | 28000250 | LB | 12 | 7 (58%) | $4.50 | $5.00 |
| PC conc sidewalk 5 | 42400200 | SF | 13 | 6 (46%) | $9.00 | $10.00 |
| PVT MKG rem WTR blast | 78300202 | SF | 11 | 6 (55%) | $5.00 | $2.75 |
| Storm sewer rem 12 | 55100500 | LF | 8 | 6 (75%) | $10.00 | $24.55 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Martam Construction Incorporated | 10 | 8 of 10 |
| Alliance Contractors, Inc. | 9 | 2 of 9 |
| A Lamp Concrete Contractors, Inc. | 9 | 6 of 9 |
| Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. | 7 | 3 of 7 |
| Campanella and Sons, Inc. | 7 | 3 of 7 |
| Schroeder Asphalt Services, Inc. | 6 | 3 of 6 |
| Plote Construction, Inc. | 5 | 4 of 5 |
| Acura Inc. | 5 | 3 of 5 |
| R. W. Dunteman Company | 5 | 4 of 5 |
| Everlast Blacktop Inc. | 3 | 2 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 31 JUL 2026 | 61K85 | District 01 | Rolling Meadows, section 21-00126-00-PV | 9 of 10 | $3,431,252 | +22% |
| 12 JUN 2026 | 80D46 | District 01 | Section 2026-2181-C,HBK | 5 of 7 | $1,358,423 | +25% |
| 07 NOV 2025 | 61J94 | District 01 | Schaumburg, section 19-00133-00-BT | 9 of 9 | $1,650,000 | +65% |
| 07 NOV 2025 | 61L98 | District 01 | Mount Prospect, section 23-00179-00-RS | 1 of 6 | $1,778,510 | Low, 0.0% under the second |
| 19 SEP 2025 | 61K93 | District 01 | Elk Grove Village, section 20-00073-01-PV | 7 of 7 | $16,785,111 | +33% |
| 19 SEP 2025 | 61L35 | District 01 | Hanover Park, section 24-00078-00-BT | 5 of 6 | $1,700,000 | +26% |
| 01 AUG 2025 | 61L58 | District 01 | Carpentersville, section 22-00094-00-FP | 2 of 8 | $5,191,928 | +2.0% |
| 13 JUN 2025 | 61J86 | District 01 | Round Lake Beach, section 17-00080-00-PV | 3 of 5 | $4,609,321 | +5.0% |
| 25 APR 2025 | 61K79 | District 01 | Carol Stream, section 17-00064-00-BT | 6 of 7 | $1,064,333 | +22% |
| 25 APR 2025 | 61L18 | District 01 | Marengo, section 21-00029-00-PV | 1 of 7 | $3,549,900 | Low, 4.0% under the second |
| 17 JAN 2025 | 61J63 | District 01 | Rolling Meadows, section 19-00123-00-BT | 2 of 7 | $1,087,000 | +3.0% |
| 08 NOV 2024 | 61K74 | District 01 | Deerfield, section 20-00108-00-PV | 2 of 5 | $10,226,059 | 0.0% |
| 20 SEP 2024 | 61K63 | District 01 | Buffalo Grove, section 20-00108-02-RS | 4 of 6 | $9,582,057 | +16% |
| 14 JUN 2024 | 61J28 | District 01 | Elgin, section 19-00187-00-CH | 5 of 5 | $3,700,767 | +10% |
| 08 MAR 2024 | 61K10 | District 01 | Volo, section 15-08113-05-CH | 3 of 4 | $3,052,131 | +8.0% |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.