IDOT contract 61J94 bid tabulation
Schaumburg, section 19-00133-00-BT. Let by Illinois DOT on November 7, 2025, Cook, District 01. 9 bids received; low bid $997,000 by A Lamp Concrete Contractors, Inc..
- Owner
- Illinois DOT
- Letting
- 07 NOV 2025
- Pay items
- 109
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | A Lamp Concrete Contractors, Inc. | $997,000 | Low |
| 2 | Everlast Blacktop Inc. | $1,106,434 | +11% |
| 3 | Schroeder Asphalt Services, Inc. | $1,134,241 | +14% |
| 4 | R. W. Dunteman Company | $1,135,000 | +14% |
| 5 | D'Land Construction, LLC | $1,213,796 | +22% |
| 6 | Martam Construction Incorporated | $1,243,229 | +25% |
| 7 | Performance Construction and Engineering, LLC | $1,278,414 | +28% |
| 8 | Alliance Contractors, Inc. | $1,335,682 | +34% |
| 9 | PirTano Construction Co., LLC | $1,650,000 | +65% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. A Lamp Concrete Contractors, Inc. | 2. Everlast Blacktop Inc. | 3. Schroeder Asphalt Services, Inc. | 4. R. W. Dunteman Company | 5. D'Land Construction, LLC | 6. Martam Construction Incorporated |
|---|---|---|---|---|---|---|---|---|---|
| 1 | T-acerx frem AB 2 (A2000116) | EACH | 6 | $450.00 | $660.00 | $670.00 | $555.00 | $660.00 | $630.05 |
| 2 | T-ginkgo bil PS 2 (A2004516) | EACH | 2 | $750.00 | $1,000.00 | $1,000.00 | $897.00 | $990.00 | $945.07 |
| 3 | T-taxodium dis 2 (A2007616) | EACH | 4 | $500.00 | $660.00 | $670.00 | $555.00 | $660.00 | $630.05 |
| 4 | T-syring ret TF 2 (B2006216) | EACH | 5 | $500.00 | $660.00 | $670.00 | $555.00 | $660.00 | $630.05 |
| 5 | Mulch placement 4 (K0036120) | SY | 384 | $8.50 | $7.00 | $17.00 | $5.00 | $16.50 | $15.75 |
| 6 | Preconstruct vid tap (XX003668) | LS | 1 | $1,295.00 | $1,000.00 | $2,500.00 | $1,295.00 | $2,500.00 | $2,000.00 |
| 7 | Conc truck washout (XX006821) | LS | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $4,000.00 | $2,500.00 | $3,708.47 |
| 8 | CL D patch SPL (XX009224) | SY | 103 | $150.00 | $74.00 | $158.00 | $217.49 | $357.50 | $280.95 |
| 9 | Ped signal post 10 FT (X1400367) | EACH | 1 | $2,800.00 | $2,700.00 | $3,250.00 | $2,800.00 | $1,609.12 | $2,940.22 |
| 10 | Stump removal only (X2010400) | UNIT | 113 | $10.00 | $10.00 | $12.00 | $3.50 | $11.00 | $5.25 |
| 11 | Explor trench SPL (X2130010) | LF | 100 | $10.00 | $30.00 | $65.00 | $50.00 | $55.00 | $87.01 |
| 12 | Temp access- com ent (X4022000) | EACH | 3 | $500.00 | $300.00 | $200.00 | $446.43 | $500.00 | $818.23 |
| 13 | PCC driveway PVT 8 SP (X4230800) | SY | 271 | $142.00 | $170.00 | $170.00 | $93.94 | $140.00 | $94.30 |
| 14 | Detectable warn SPL (X4240800) | SF | 353 | $45.00 | $69.00 | $45.00 | $48.47 | $40.00 | $66.66 |
| 15 | Engrs FLD ofc TY A D1 (X6700407) | CAL MO | 9 | $3,500.00 | $3,200.00 | $4,500.00 | $3,000.00 | $5,500.00 | $2,800.00 |
| 16 | Temp info signing (X7200061) | SF | 352 | $20.00 | $20.00 | $18.00 | $4.00 | $4.40 | $4.20 |
| 17 | Sign panel T1 SPL (X7200105) | SF | 41 | $30.00 | $52.00 | $50.00 | $30.00 | $33.00 | $31.50 |
| 18 | Teles STL sin sup SPL (X7280105) | LF | 335 | $20.00 | $22.00 | $21.00 | $17.50 | $19.25 | $18.38 |
| 19 | Maint lighting systm (X8000003) | CAL MO | 4 | $1,250.00 | $4,700.00 | $1,450.00 | $1,250.00 | $2,613.80 | $1,312.60 |
| 20 | Exp & rel EX unit DCT (X8161000) | LF | 25 | $20.00 | $125.00 | $23.00 | $20.00 | $20.85 | $21.00 |
| 21 | Light pole FDN 24D OS (X8360215) | LF | 12 | $250.00 | $700.00 | $300.00 | $250.00 | $502.30 | $262.52 |
| 22 | Accessible ped signal (X8760200) | EACH | 2 | $4,250.00 | $5,250.00 | $4,800.00 | $4,250.00 | $4,026.03 | $4,462.83 |
| 23 | Conc FDN TY A 12D (X8780012) | LF | 4 | $250.00 | $660.00 | $300.00 | $250.00 | $323.42 | $262.52 |
| 24 | Stab constr entrance (Z0013797) | SY | 100 | $20.00 | $38.00 | $25.00 | $41.04 | $35.00 | $43.35 |
| 25 | Construction layout (Z0013798) | LS | 1 | $13,500 | $10,000 | $18,000 | $13,500 | $14,850 | $14,176 |
| 26 | Tree remov 6-15 (20100110) | UNIT | 99 | $33.00 | $40.00 | $38.00 | $23.50 | $36.50 | $31.50 |
| 27 | Tree remov over 15 (20100210) | UNIT | 24 | $52.00 | $45.00 | $59.00 | $25.50 | $57.00 | $42.00 |
| 28 | Temporary fence (20101000) | LF | 1,595 | $1.00 | $3.00 | $4.00 | $3.10 | $10.00 | $3.15 |
| 29 | Tree root pruning (20101200) | EACH | 32 | $90.00 | $160.00 | $105.00 | $103.00 | $99.00 | $157.51 |
| 30 | Tree prun 1-10 (20101300) | EACH | 14 | $70.00 | $110.00 | $80.00 | $50.00 | $77.00 | $105.01 |
| 31 | Tree prun over 10 (20101350) | EACH | 18 | $200.00 | $210.00 | $225.00 | $100.00 | $220.00 | $210.02 |
| 32 | Earth excavation (20200100) | CY | 1,235 | $34.00 | $50.00 | $55.00 | $78.00 | $45.00 | $95.40 |
| 33 | Rem & disp uns matl (20201200) | CY | 260 | $10.00 | $50.00 | $59.00 | $78.00 | $60.00 | $95.40 |
| 34 | Geotech fab F/GR stab (21001000) | SY | 5,426 | $1.75 | $2.00 | $2.00 | $2.50 | $4.00 | $3.03 |
| 35 | Topsoil exc & plac (21101505) | CY | 929 | $20.00 | $30.00 | $37.00 | $60.00 | $30.00 | $40.58 |
| 36 | Topsoil F & P 4 (21101615) | SY | 2,674 | $4.00 | $6.50 | $6.75 | $6.00 | $6.60 | $6.30 |
| 37 | Nitrogen fert nutr (25000400) | LB | 76 | $1.00 | $6.00 | $3.40 | $5.00 | $3.30 | $3.15 |
| 38 | Potassium fert nutr (25000600) | LB | 76 | $1.00 | $6.00 | $3.40 | $5.00 | $3.30 | $3.15 |
| 39 | Sodding salt tolerant (25200110) | SY | 5,986 | $11.50 | $12.00 | $10.75 | $11.00 | $10.50 | $9.98 |
| 40 | Supple watering (25200200) | UNIT | 326 | $0.10 | $2.00 | $2.00 | $1.00 | $1.10 | $1.05 |
| 41 | Temp eros contr seed (28000250) | LB | 124 | $0.10 | $6.00 | $5.60 | $5.00 | $5.50 | $5.25 |
| 42 | Temp ditch checks (28000305) | LF | 104 | $25.00 | $19.00 | $11.00 | $15.00 | $11.00 | $10.50 |
| 43 | Perimeter eros bar (28000400) | LF | 5,040 | $1.00 | $3.50 | $2.80 | $3.00 | $2.75 | $2.63 |
| 44 | Inlet filters (28000510) | EACH | 37 | $15.00 | $100.00 | $220.00 | $155.00 | $250.00 | $210.02 |
| 45 | Temp eros contr blank (28001100) | SY | 5,986 | $0.10 | $1.00 | $0.80 | $0.50 | $0.77 | $0.74 |
| 46 | Agg subgrade improve (30300001) | CY | 171 | $59.00 | $68.00 | $68.00 | $87.43 | $75.00 | $71.02 |
| 47 | Sub gran mat B 2 (31101180) | SY | 646 | $6.00 | $4.70 | $8.00 | $8.51 | $5.00 | $5.16 |
| 48 | Agg base cse B (35101500) | CY | 7 | $137.00 | $60.00 | $80.00 | $163.53 | $55.00 | $137.17 |
| 49 | Agg base cse B 4 (35101600) | SY | 424 | $11.00 | $7.70 | $10.50 | $13.43 | $7.00 | $11.32 |
| 50 | Agg base cse B 6 (35101800) | SY | 4,772 | $18.75 | $9.20 | $15.75 | $13.21 | $16.00 | $8.65 |
| 51 | Aggregate-temp access (40201000) | TON | 30 | $30.00 | $32.00 | $50.00 | $90.26 | $45.00 | $35.91 |
| 52 | Bit matls PR CT (40600275) | LB | 10,744 | $0.01 | $0.01 | $0.01 | $0.50 | $0.01 | $0.01 |
| 53 | Bit matls tack CT (40600290) | LB | 1,604 | $0.01 | $0.01 | $0.01 | $1.00 | $0.01 | $0.01 |
| 54 | HMA SC IL-9.5 D N50 (40604060) | TON | 807 | $122.50 | $120.00 | $100.00 | $135.18 | $164.00 | $156.47 |
| 55 | Protective coat (42001300) | SY | 782 | $0.01 | $3.00 | $0.05 | $1.00 | $0.01 | $2.55 |
| 56 | PC conc sidewalk 5 (42400200) | SF | 1,995 | $9.50 | $11.50 | $16.50 | $9.63 | $10.00 | $11.08 |
| 57 | PC conc sidewalk 8 (42400410) | SF | 1,379 | $14.50 | $12.50 | $19.00 | $14.17 | $11.00 | $15.21 |
| 58 | Pavement rem (44000100) | SY | 52 | $33.00 | $18.00 | $30.00 | $51.41 | $45.00 | $64.62 |
| 59 | Drive pavement rem (44000200) | SY | 398 | $18.00 | $18.00 | $18.00 | $18.64 | $25.00 | $16.34 |
| 60 | Comb curb gutter rem (44000500) | LF | 575 | $6.75 | $9.00 | $12.00 | $21.37 | $12.00 | $10.52 |
| 61 | Sidewalk rem (44000600) | SF | 22,516 | $1.35 | $1.89 | $2.75 | $1.89 | $2.00 | $2.54 |
| 62 | Median removal (44003100) | SF | 754 | $3.50 | $4.00 | $10.00 | $7.60 | $6.00 | $5.39 |
| 63 | Man adjust (60255500) | EACH | 4 | $565.00 | $600.00 | $625.00 | $550.00 | $650.00 | $850.79 |
| 64 | Man reconst (60257900) | EACH | 6 | $1,900.00 | $1,200.00 | $1,850.00 | $1,650.00 | $2,100.00 | $1,701.58 |
| 65 | Inlets adjust (60260100) | EACH | 1 | $565.00 | $600.00 | $525.00 | $450.00 | $650.00 | $638.11 |
| 66 | VV adjust (60265700) | EACH | 1 | $565.00 | $600.00 | $650.00 | $550.00 | $650.00 | $638.11 |
| 67 | Comb CC&G TB6.12 (60603800) | LF | 265 | $44.50 | $39.00 | $98.00 | $38.79 | $55.00 | $51.07 |
| 68 | Comb CC&G TY B-6.24 (60605000) | LF | 139 | $64.50 | $42.00 | $106.00 | $54.52 | $80.00 | $57.35 |
| 69 | Comb CC&G TM6.06 (60608600) | LF | 68 | $45.00 | $74.00 | $94.00 | $41.03 | $80.00 | $54.07 |
| 70 | Comb CC&G TM6.12 (60609200) | LF | 19 | $75.00 | $92.00 | $98.00 | $57.34 | $135.00 | $60.41 |
| 71 | Comb CC&G TM6.24 (60610400) | LF | 27 | $97.00 | $114.00 | $107.00 | $61.10 | $145.00 | $65.28 |
| 72 | Comb CC&G TM6.24 VWGF (60610900) | LF | 33 | $86.00 | $114.00 | $150.00 | $92.91 | $185.00 | $65.30 |
| 73 | Conc median surf 4 (60618300) | SF | 227 | $12.75 | $32.00 | $36.00 | $17.57 | $20.00 | $19.05 |
| 74 | Conc med TSM6.24 (60623200) | SF | 178 | $31.00 | $39.00 | $48.00 | $33.73 | $25.00 | $47.79 |
| 75 | Conc median trans (60623745) | SF | 62 | $42.50 | $77.00 | $48.00 | $65.58 | $38.00 | $39.39 |
| 76 | Non SPL waste disposl (66900200) | CY | 485 | $75.00 | $80.00 | $105.00 | $112.17 | $125.00 | $57.00 |
| 77 | Soil disposal analy (66900530) | EACH | 2 | $1,680.00 | $2,120.00 | $1,850.00 | $1,680.00 | $1,848.00 | $1,764.13 |
| 78 | Reg sub P-const plan (66901001) | LS | 1 | $3,400.00 | $4,000.00 | $3,850.00 | $3,400.00 | $3,740.00 | $3,570.26 |
| 79 | Reg sub F con report (66901003) | LS | 1 | $500.00 | $3,000.00 | $600.00 | $500.00 | $550.00 | $525.04 |
| 80 | Reg sub mon (66901006) | CAL DAY | 35 | $700.00 | $1,150.00 | $800.00 | $700.00 | $770.00 | $735.05 |
| 81 | Mobilization (67100100) | LS | 1 | $59,000 | $44,680 | $40,000 | $77,108 | $68,700 | $74,594 |
| 82 | TR cont & prot 701606 (70102625) | LS | 1 | $109,334 | $59,573 | $38,000 | $11,000 | $86,000 | $155,128 |
| 83 | TR cont & prot 701601 (70102630) | LS | 1 | $1.00 | $7,000.00 | $1.00 | $48,000 | $1.00 | $1.05 |
| 84 | TR cont & prot 701701 (70102635) | LS | 1 | $1.00 | $2,000.00 | $1.00 | $1.00 | $1.00 | $1.05 |
| 85 | TR cont & prot 701801 (70102640) | LS | 1 | $1.00 | $2,000.00 | $1.00 | $1.00 | $1.00 | $1.05 |
| 86 | Changeable message SN (70107025) | CAL DAY | 280 | $1.00 | $40.00 | $35.00 | $25.00 | $27.50 | $26.25 |
| 87 | Reloc sin pan assy TA (72400500) | EACH | 2 | $250.00 | $200.00 | $175.00 | $125.00 | $137.50 | $131.26 |
| 88 | THPL PVT MK line 6 (78000400) | LF | 962 | $1.72 | $2.00 | $2.00 | $1.72 | $1.90 | $1.81 |
| 89 | THPL PVT MK line 8 (78000500) | LF | 296 | $1.95 | $2.20 | $2.30 | $1.95 | $2.15 | $2.05 |
| 90 | THPL PVT MK line 12 (78000600) | LF | 1,278 | $3.32 | $4.00 | $3.75 | $3.32 | $3.65 | $3.49 |
| 91 | THPL PVT MK line 24 (78000650) | LF | 74 | $5.75 | $6.00 | $6.35 | $5.75 | $6.32 | $6.04 |
| 92 | PVT MKG rem WTR blast (78300202) | SF | 942 | $6.95 | $8.00 | $8.00 | $3.50 | $3.85 | $3.68 |
| 93 | Undrgrd C galvs 2 (81028200) | LF | 8 | $60.00 | $110.00 | $68.00 | $60.00 | $110.23 | $63.01 |
| 94 | Undrgrd C galvs 4 (81028240) | LF | 65 | $80.00 | $129.00 | $90.00 | $80.00 | $73.79 | $84.01 |
| 95 | Undrgrd C CNC 1 1/4 (81028730) | LF | 208 | $20.00 | $51.00 | $23.50 | $20.00 | $21.00 | $21.00 |
| 96 | EC C XLP use 3-1C 4 (81702410) | LF | 220 | $10.00 | $13.50 | $11.50 | $10.00 | $10.30 | $10.50 |
| 97 | Light pole FDN 24D (83600200) | LF | 10 | $200.00 | $490.00 | $225.00 | $200.00 | $389.42 | $210.02 |
| 98 | Rem pole FDN (84200804) | EACH | 1 | $1,800.00 | $1,200.00 | $2,025.00 | $1,800.00 | $1,009.90 | $1,890.14 |
| 99 | Reloc EX LT unit (84400105) | EACH | 1 | $4,500.00 | $8,300.00 | $5,100.00 | $4,500.00 | $1,630.34 | $4,725.35 |
| 100 | Main EX TR sig instal (85000200) | EACH | 1 | $8,500.00 | $13,500 | $9,500.00 | $8,500.00 | $4,567.58 | $8,925.66 |
| 101 | Elcbl C signal 14 2C (87301215) | LF | 169 | $6.00 | $4.00 | $6.75 | $6.00 | $4.18 | $6.30 |
| 102 | Elcbl C signal 14 3C (87301225) | LF | 176 | $6.00 | $5.00 | $6.75 | $6.00 | $4.37 | $6.30 |
| 103 | Elcbl C egrdc 6 1C (87301900) | LF | 14 | $10.00 | $5.00 | $11.25 | $10.00 | $6.05 | $10.50 |
| 104 | Drill EX handhole (87900200) | EACH | 1 | $100.00 | $1,300.00 | $112.00 | $100.00 | $1,009.90 | $105.01 |
| 105 | Reloc EX ped sig head (89500200) | EACH | 1 | $800.00 | $800.00 | $1,000.00 | $800.00 | $765.68 | $840.06 |
| 106 | Rem elcbl FR con (89502300) | LF | 300 | $0.10 | $1.00 | $0.15 | $0.10 | $2.44 | $0.11 |
| 107 | Remov EX TS equip (89502375) | EACH | 1 | $750.00 | $3,000.00 | $850.00 | $750.00 | $976.90 | $787.56 |
| 108 | Rebuild EX handhole (89502376) | EACH | 8 | $2,200.00 | $4,300.00 | $2,600.00 | $2,200.00 | $2,943.80 | $2,310.17 |
| 109 | Remov EX conc FDN (89502385) | EACH | 1 | $500.00 | $800.00 | $600.00 | $500.00 | $1,009.90 | $525.04 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of November 7, 2025. Compiled by Mirage Metrics.