IDOT contract 61L18 bid tabulation

Marengo, section 21-00029-00-PV. Let by Illinois DOT on April 25, 2025, Mchenry, District 01. 7 bids received; low bid $3,549,900 by PirTano Construction Co., LLC.

Owner
Illinois DOT
Letting
25 APR 2025
Pay items
142
Data through
18 SEP 2026

Bidders

IDOT contract 61L18: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. PirTano Construction Co., LLC2. Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc.3. Curran Contracting Company4. Campanella and Sons, Inc.5. Alliance Contractors, Inc.6. Schroeder Asphalt Services, Inc.
1T-carya cord 2 (A2002616)EACH6$525.00$462.00$462.00$462.00$462.00$560.00
2T-celtis occid 2 (A2002916)EACH6$365.00$425.00$425.00$425.00$425.00$400.00
3T-platanus occ 2 (A2005816)EACH6$425.00$455.00$455.00$455.00$455.00$450.00
4T-quercus bicol 2 (A2006516)EACH7$490.00$477.00$477.00$477.00$477.00$525.00
5T-quercus macr 2 (A2006716)EACH7$445.00$477.00$477.00$477.00$477.00$500.00
6T-quercus palus 2 (A2006916)EACH6$445.00$477.00$477.00$477.00$477.00$475.00
7Seeding SPL (K1005421)ACRE0.50$6,000.00$4,306.00$4,306.00$4,306.00$4,306.00$6,500.00
8Rel R R FL beacon asy (XX009668)EACH1$3,610.00$19,775$86,010$86,010$19,775$20,000
9Bflow prevent/enclose (X0325777)EACH1$6,316.00$6,350.00$8,000.00$3,250.00$5,000.00$26,750
10Bollard to BE relocated (X0327998)EACH5$1,063.00$1,750.00$1,750.00$1,251.00$1,750.00$1,900.00
11R R FL beacon A comp (X1400326)EACH1$9,546.00$86,010$19,775$19,775$86,010$86,000
12Stump removal (X2010404)EACH38$200.00$100.00$100.00$100.00$150.00$160.00
13Explor trench SPL (X2130010)LF200$25.00$20.00$100.00$50.00$1.00$213.00
14Temp access- priv ent (X4021000)EACH2$731.00$725.00$280.00$385.00$1.00$300.00
15Temp access- com ent (X4022000)EACH6$1,210.00$1,250.00$480.00$770.00$1.00$600.00
16Temp access- road (X4023000)EACH5$1,212.00$1,300.00$680.00$770.00$1.00$600.00
17Temp access winterize (X4024100)SY1,800$22.00$0.15$15.00$10.00$1.00$29.00
18Memb WTRPRF sys B STR (X5810103)SY183$56.00$58.00$56.26$56.30$56.26$65.00
19Sanitary manhole adj (X6026050)EACH1$1,277.00$1,050.00$2,000.00$1,209.00$1,500.00$2,675.00
20Traf cont & prot SPL (X7010216)LS1$84,000$160,000$58,500$84,000$46,700$125,000
21Temp info signing (X7200061)SF214$25.00$12.00$20.00$25.00$12.00$25.00
22Construction layout (Z0013798)LS1$26,900$28,000$30,530$28,000$26,900$30,000
23Drain util STR adj (Z0017400)EACH5$917.00$565.00$1,000.00$486.00$500.00$2,150.00
24Drain util STR recon (Z0017700)EACH1$2,264.00$2,000.00$2,500.00$1,605.00$2,000.00$5,750.00
25RR prot liability ins (Z0048665)LS1$7,000.00$12,000$5,500.00$12,000$500.00$3,500.00
26Storm sew WM req 12 (Z0056608)LF103$142.00$150.00$145.00$141.00$150.00$180.00
27Temp pavement (Z0062456)SY139$100.00$135.00$75.00$100.00$20.00$60.00
28Temp TR signal timing (Z0073510)EACH2$700.00$2,655.00$2,655.00$2,655.00$2,655.00$2,850.00
29Trainees (Z0076600)HR500$0.80$0.80$0.80$0.80$0.80$0.80
30Trainees TPG (Z0076604)HR500$15.00$15.00$15.00$15.00$15.00$15.00
31Temporary fence (20101000)LF200$5.00$3.00$3.00$3.00$3.00$6.00
32Tree trunk protection (20101100)EACH8$75.00$100.00$100.00$100.00$100.00$215.00
33Tree root pruning (20101200)EACH8$75.00$130.00$130.00$130.00$130.00$215.00
34Earth excavation (20200100)CY5,295$38.00$0.01$15.00$28.75$30.00$36.00
35Rem & disp uns matl (20201200)CY6,507$33.00$0.01$25.00$36.80$30.00$38.00
36Furnished excavation (20400800)CY2,116$16.00$0.01$30.00$28.00$1.00$38.00
37Porous gran embank (20700220)CY145$112.00$71.00$60.00$126.60$150.00$50.00
38Trench backfill (20800150)CY1,936$50.00$40.00$40.00$48.05$21.00$37.00
39Geotech fab F/GR stab (21001000)SY3,157$4.00$2.55$1.85$2.65$2.00$3.25
40Topsoil exc & plac (21101505)CY2,237$28.00$0.01$15.00$35.60$10.00$53.00
41Seeding CL 1A (25000110)ACRE2.50$2,800.00$2,609.00$2,609.00$2,609.00$2,609.00$3,000.00
42Nitrogen fert nutr (25000400)LB225$2.00$3.00$3.00$3.00$3.00$3.00
43Potassium fert nutr (25000600)LB225$2.00$3.00$3.00$3.00$3.00$3.00
44Erosion contr blanket (25100630)SY13,508$1.00$1.40$1.40$1.40$1.40$0.90
45Supple watering (25200200)UNIT8$10.00$50.00$50.00$50.00$50.00$11.00
46Temp eros contr seed (28000250)LB300$5.00$5.00$5.00$5.00$5.00$6.00
47Temp ditch checks (28000305)LF677$8.00$4.00$4.00$4.00$4.00$8.50
48Perimeter eros bar (28000400)LF6,468$3.00$2.00$2.00$2.00$2.00$3.00
49Inlet & pipe protect (28000500)EACH6$250.00$62.00$62.00$62.00$50.00$265.00
50Inlet filters (28000510)EACH43$185.00$197.00$225.00$197.00$50.00$200.00
51Stone riprap CL A1 (28100101)SY42$79.00$78.00$12.00$20.00$110.00$165.00
52Stone riprap CL A3 (28100105)SY22$80.00$90.00$17.00$65.20$130.00$165.00
53Stone riprap CL A4 (28100107)SY42$80.00$92.00$37.00$88.65$160.00$165.00
54Filter fabric (28200200)SY42$3.00$8.00$2.65$14.25$1.00$6.00
55Agg subgrade improve (30300001)CY957$73.00$99.00$60.00$48.80$31.50$55.00
56Agg subgrade impr 12 (30300112)SY11,479$25.00$18.50$25.00$19.65$12.25$14.00
57Agg base cse B 4 (35101600)SY2,112$12.00$12.50$9.49$15.60$4.00$6.50
58Agg base cse B 8 (35102000)SY1,986$22.00$17.00$20.00$17.40$8.00$16.75
59Agg base cse B 12 (35102400)SY242$31.00$32.75$30.00$32.40$12.00$30.00
60HMA base cse 6 (35501308)SY37$93.00$42.00$75.00$93.00$42.00$43.00
61HMA base cse 8 (35501316)SY986$61.00$65.60$50.00$61.00$65.60$54.00
62Bit matls tack CT (40600290)LB9,963$0.01$0.01$0.01$0.01$0.01$0.01
63HMA SC IL-9.5 D N50 (40604060)TON492$131.00$140.20$150.00$131.00$140.20$111.00
64HMA pavt FD 9 (40701861)SY9,781$41.00$43.18$40.00$40.50$43.18$43.00
65Bit matls tack CT (40800029)LB40$0.01$0.01$0.01$0.01$0.01$0.01
66Incidental HMA surf (40800050)TON10$325.00$120.00$250.00$325.00$120.00$95.00
67Protective coat (42001300)SY3,810$0.01$0.01$0.01$0.10$0.01$0.10
68PCC driveway pavt 8 (42300400)SY51$98.00$90.00$90.00$100.00$90.00$96.50
69PC conc sidewalk 5 (42400200)SF18,070$8.00$8.00$8.00$9.00$8.00$8.50
70PC conc sidewalk 6 (42400300)SF325$9.00$8.50$8.50$10.00$8.50$9.00
71PC conc sidewalk 8 (42400410)SF613$10.00$10.00$10.00$11.00$10.00$10.75
72Detectable warnings (42400800)SF455$20.00$20.00$20.00$40.00$20.00$21.50
73Pavement rem (44000100)SY9,467$6.00$49.50$5.50$5.45$30.00$3.50
74Drive pavement rem (44000200)SY829$11.00$10.00$7.50$10.65$30.00$13.00
75Comb curb gutter rem (44000500)LF336$5.00$7.50$15.50$8.40$30.00$13.00
76Sidewalk rem (44000600)SF4,481$2.00$1.25$1.50$1.00$3.00$3.00
77Aggregate SHLDS B 6 (48101500)SY12$86.00$150.00$30.00$62.50$90.00$59.00
78Pipe culvert remov (50105220)LF438$10.00$30.00$18.00$35.40$10.00$32.00
79Pipe handrail (50901760)LF80$290.00$205.00$204.27$398.35$204.27$225.00
80Box cul end sec C1 (54001001)EACH4$6,174.00$12,000$14,000$11,542$10,000$10,700
81PCBC 7X3 (54010703)LF166$877.00$1,025.00$1,150.00$1,192.55$1,100.00$1,175.00
82PRC flar end sec 12 (54213657)EACH8$2,197.00$2,050.00$1,250.00$1,923.15$600.00$1,300.00
83PRC flar end sec 15 (54213660)EACH2$2,275.00$2,200.00$2,000.00$2,010.95$700.00$1,800.00
84PRC flar end sec 24 (54213669)EACH1$2,510.00$2,725.00$2,400.00$3,172.05$1,000.00$2,700.00
85PRC FL end S EQ RS 42 (54214527)EACH1$5,524.00$6,300.00$5,500.00$8,323.80$4,500.00$8,500.00
86SS RG CL A 1 12 (550A2320)LF214$78.00$69.00$80.00$62.20$80.00$94.00
87SS RG CL A 1 15 (550A2330)LF276$82.00$96.00$85.00$68.30$90.00$96.00
88SS RG CL A 1 18 (550A2340)LF263$92.00$88.00$90.00$78.00$100.00$105.00
89SS RG CL A 1 24 (550A2360)LF423$96.00$112.00$100.00$110.75$125.00$137.00
90SS RG CL A 1 30 (550A2380)LF21$108.00$145.00$125.00$160.10$175.00$165.00
91SS RG CL A 2 12 (550A2520)LF41$78.00$71.00$80.00$74.30$80.00$130.00
92SS RG CL A 2 15 (550A2530)LF66$84.00$102.00$85.00$78.65$90.00$135.00
93SS CL A 1 eqrs 42 (550A4700)LF683$225.00$255.00$245.00$312.65$300.00$310.00
94SS CL A 2 eqrs 42 (550A5500)LF415$228.00$269.00$245.00$312.65$300.00$350.00
95Adj water main 8 (56106400)LF100$200.00$285.00$220.00$376.55$200.00$320.00
96Fire hydnts relocated (56400400)EACH3$11,624$4,700.00$7,000.00$15,188$8,000.00$4,150.00
97Geocomposite wall DR (59100100)SY183$48.00$47.92$47.92$49.95$20.00$64.00
98Pipe underdr T 1 4 (60108104)LF200$14.00$31.00$38.00$25.55$40.00$28.00
99CB TA 4 dia T11F&G (60201105)EACH14$4,628.00$3,450.00$5,000.00$4,316.25$7,000.00$4,700.00
100CB TA 5 dia T11F&G (60204805)EACH3$5,766.00$4,800.00$6,000.00$6,089.60$8,000.00$6,700.00
101CB TC T8G (60207605)EACH1$2,017.00$1,750.00$3,000.00$2,256.85$4,000.00$3,000.00
102CB TC T11F&G (60207905)EACH6$2,409.00$2,200.00$3,300.00$2,659.30$4,000.00$3,100.00
103Man TA 4 dia T1F CL (60218400)EACH2$4,390.00$3,825.00$4,500.00$3,932.70$7,000.00$4,700.00
104Man TA 5 dia T1F CL (60221100)EACH4$5,527.00$4,800.00$5,500.00$5,668.20$8,000.00$6,650.00
105Man TA 6 dia T1F CL (60223800)EACH2$8,576.00$7,650.00$9,000.00$11,116$10,000$13,000
106Man TA 8 dia T1F CL (60224459)EACH8$18,495$15,500$16,500$21,608$20,000$18,000
107Inlets TA T8G (60236200)EACH5$1,420.00$1,600.00$2,200.00$1,653.00$4,000.00$2,350.00
108Inlets TA T11F&G (60236800)EACH9$1,804.00$1,990.00$2,500.00$2,055.40$4,000.00$2,354.00
109Inlets adj new T1F OL (60260300)EACH1$1,312.00$995.00$1,800.00$1,027.15$1,000.00$1,600.00
110Remov man - main flow (60500070)EACH1$2,141.00$3,800.00$2,000.00$2,366.00$1,000.00$4,800.00
111Class SI conc outlet (60600095)CY3$1,100.00$1,100.00$1,100.00$700.00$1,100.00$1,175.00
112Comb CC&G TB6.12 (60603800)LF5,624$24.00$23.50$23.50$30.00$23.50$25.00
113Comb CC&G TM4.12 (60608562)LF298$23.00$23.00$23.00$30.00$23.00$25.00
114Conc median surf 6 (60618320)SF2,172$9.00$8.50$8.50$10.00$8.50$9.00
115Non SPL waste disposl (66900200)CY25$110.00$120.00$55.00$125.20$200.00$130.00
116Soil disposal analy (66900530)EACH1$1,700.00$1,700.00$1,800.00$1,800.00$1,600.00$1,800.00
117Reg sub P-const plan (66901001)LS1$3,400.00$3,400.00$3,350.00$3,350.00$3,600.00$3,750.00
118Reg sub F con report (66901003)LS1$500.00$500.00$1,500.00$1,500.00$500.00$550.00
119Reg sub mon (66901006)CAL DAY50$750.00$1.00$700.00$700.00$700.00$800.00
120Engr field office A (67000400)CAL MO6$2,000.00$3,700.00$2,500.00$7,543.00$500.00$2,000.00
121Mobilization (67100100)LS1$55,989$215,000$354,000$126,000$469,026$125,000
122Changeable message SN (70107025)CAL DAY171$40.00$30.00$30.00$40.00$30.00$32.00
123SHRT TRM pavt MK rem (70300150)SF725$2.00$0.60$3.00$0.95$0.60$3.00
124Temp PVT MK line 4 - paint (70300221)LF8,700$0.45$0.38$0.38$0.45$0.38$0.40
125Temp PVT MK LTR & sym MU (70303100)SF476$5.00$6.00$4.00$5.75$6.00$4.25
126Temp PVT MK L4 MU (70303120)LF8,231$1.00$1.04$0.60$0.80$1.04$0.65
127Temp PVT MK L6 MU (70303130)LF1,008$1.00$1.10$0.90$1.00$1.10$1.00
128Temp PVT MK L12 MU (70303160)LF2,494$4.00$2.20$1.90$3.00$2.20$2.00
129Temp PVT MK L24 MU (70303210)LF74$5.00$6.00$4.00$5.75$6.00$4.25
130Temp PVT MK LTR & sym T4 tape (70307100)SF226$4.00$3.75$9.00$3.60$3.75$10.00
131Temp PVT MK L4 T4 tape (70307120)LF2,175$1.00$1.20$1.50$1.20$1.20$1.60
132Temp PVT MK L24 T4 tape (70307210)LF140$7.00$7.60$9.00$7.20$7.60$9.75
133Sign panel T1 (72000100)SF160$30.00$26.00$32.00$30.00$26.00$34.00
134Reloc sin pan assy TA (72400500)EACH9$325.00$125.00$150.00$325.00$125.00$160.00
135Teles STL sin support (72800100)LF206$17.00$16.00$22.00$17.00$16.00$23.50
136THPL PVT MK LTR & sym (78000100)SF476$4.00$5.75$4.95$5.75$5.75$5.25
137THPL PVT MK line 4 (78000200)LF8,231$1.00$0.80$0.82$0.80$0.80$0.90
138THPL PVT MK line 6 (78000400)LF1,300$2.00$1.00$1.25$1.00$1.00$1.30
139THPL PVT MK line 12 (78000600)LF3,166$3.00$3.00$2.45$3.00$3.00$2.60
140THPL PVT MK line 24 (78000650)LF74$6.00$5.75$4.95$5.75$5.75$5.25
141PVT MKG rem grinding (78300201)SF2,700$3.00$1.15$0.95$3.00$1.15$1.00
142PVT MKG rem WTR blast (78300202)SF473$7.00$8.50$7.50$7.00$8.50$8.00
IDOT contract 61L18: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy