IDOT contract 61L18 bid tabulation
Marengo, section 21-00029-00-PV. Let by Illinois DOT on April 25, 2025, Mchenry, District 01. 7 bids received; low bid $3,549,900 by PirTano Construction Co., LLC.
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 142
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | PirTano Construction Co., LLC | $3,549,900 | Low |
| 2 | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. | $3,674,293 | +4.0% |
| 3 | Curran Contracting Company | $3,723,753 | +5.0% |
| 4 | Campanella and Sons, Inc. | $3,936,845 | +11% |
| 5 | Alliance Contractors, Inc. | $3,994,364 | +13% |
| 6 | Schroeder Asphalt Services, Inc. | $3,997,725 | +13% |
| 7 | Martam Construction Incorporated | $4,147,578 | +17% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. PirTano Construction Co., LLC | 2. Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. | 3. Curran Contracting Company | 4. Campanella and Sons, Inc. | 5. Alliance Contractors, Inc. | 6. Schroeder Asphalt Services, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | T-carya cord 2 (A2002616) | EACH | 6 | $525.00 | $462.00 | $462.00 | $462.00 | $462.00 | $560.00 |
| 2 | T-celtis occid 2 (A2002916) | EACH | 6 | $365.00 | $425.00 | $425.00 | $425.00 | $425.00 | $400.00 |
| 3 | T-platanus occ 2 (A2005816) | EACH | 6 | $425.00 | $455.00 | $455.00 | $455.00 | $455.00 | $450.00 |
| 4 | T-quercus bicol 2 (A2006516) | EACH | 7 | $490.00 | $477.00 | $477.00 | $477.00 | $477.00 | $525.00 |
| 5 | T-quercus macr 2 (A2006716) | EACH | 7 | $445.00 | $477.00 | $477.00 | $477.00 | $477.00 | $500.00 |
| 6 | T-quercus palus 2 (A2006916) | EACH | 6 | $445.00 | $477.00 | $477.00 | $477.00 | $477.00 | $475.00 |
| 7 | Seeding SPL (K1005421) | ACRE | 0.50 | $6,000.00 | $4,306.00 | $4,306.00 | $4,306.00 | $4,306.00 | $6,500.00 |
| 8 | Rel R R FL beacon asy (XX009668) | EACH | 1 | $3,610.00 | $19,775 | $86,010 | $86,010 | $19,775 | $20,000 |
| 9 | Bflow prevent/enclose (X0325777) | EACH | 1 | $6,316.00 | $6,350.00 | $8,000.00 | $3,250.00 | $5,000.00 | $26,750 |
| 10 | Bollard to BE relocated (X0327998) | EACH | 5 | $1,063.00 | $1,750.00 | $1,750.00 | $1,251.00 | $1,750.00 | $1,900.00 |
| 11 | R R FL beacon A comp (X1400326) | EACH | 1 | $9,546.00 | $86,010 | $19,775 | $19,775 | $86,010 | $86,000 |
| 12 | Stump removal (X2010404) | EACH | 38 | $200.00 | $100.00 | $100.00 | $100.00 | $150.00 | $160.00 |
| 13 | Explor trench SPL (X2130010) | LF | 200 | $25.00 | $20.00 | $100.00 | $50.00 | $1.00 | $213.00 |
| 14 | Temp access- priv ent (X4021000) | EACH | 2 | $731.00 | $725.00 | $280.00 | $385.00 | $1.00 | $300.00 |
| 15 | Temp access- com ent (X4022000) | EACH | 6 | $1,210.00 | $1,250.00 | $480.00 | $770.00 | $1.00 | $600.00 |
| 16 | Temp access- road (X4023000) | EACH | 5 | $1,212.00 | $1,300.00 | $680.00 | $770.00 | $1.00 | $600.00 |
| 17 | Temp access winterize (X4024100) | SY | 1,800 | $22.00 | $0.15 | $15.00 | $10.00 | $1.00 | $29.00 |
| 18 | Memb WTRPRF sys B STR (X5810103) | SY | 183 | $56.00 | $58.00 | $56.26 | $56.30 | $56.26 | $65.00 |
| 19 | Sanitary manhole adj (X6026050) | EACH | 1 | $1,277.00 | $1,050.00 | $2,000.00 | $1,209.00 | $1,500.00 | $2,675.00 |
| 20 | Traf cont & prot SPL (X7010216) | LS | 1 | $84,000 | $160,000 | $58,500 | $84,000 | $46,700 | $125,000 |
| 21 | Temp info signing (X7200061) | SF | 214 | $25.00 | $12.00 | $20.00 | $25.00 | $12.00 | $25.00 |
| 22 | Construction layout (Z0013798) | LS | 1 | $26,900 | $28,000 | $30,530 | $28,000 | $26,900 | $30,000 |
| 23 | Drain util STR adj (Z0017400) | EACH | 5 | $917.00 | $565.00 | $1,000.00 | $486.00 | $500.00 | $2,150.00 |
| 24 | Drain util STR recon (Z0017700) | EACH | 1 | $2,264.00 | $2,000.00 | $2,500.00 | $1,605.00 | $2,000.00 | $5,750.00 |
| 25 | RR prot liability ins (Z0048665) | LS | 1 | $7,000.00 | $12,000 | $5,500.00 | $12,000 | $500.00 | $3,500.00 |
| 26 | Storm sew WM req 12 (Z0056608) | LF | 103 | $142.00 | $150.00 | $145.00 | $141.00 | $150.00 | $180.00 |
| 27 | Temp pavement (Z0062456) | SY | 139 | $100.00 | $135.00 | $75.00 | $100.00 | $20.00 | $60.00 |
| 28 | Temp TR signal timing (Z0073510) | EACH | 2 | $700.00 | $2,655.00 | $2,655.00 | $2,655.00 | $2,655.00 | $2,850.00 |
| 29 | Trainees (Z0076600) | HR | 500 | $0.80 | $0.80 | $0.80 | $0.80 | $0.80 | $0.80 |
| 30 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 31 | Temporary fence (20101000) | LF | 200 | $5.00 | $3.00 | $3.00 | $3.00 | $3.00 | $6.00 |
| 32 | Tree trunk protection (20101100) | EACH | 8 | $75.00 | $100.00 | $100.00 | $100.00 | $100.00 | $215.00 |
| 33 | Tree root pruning (20101200) | EACH | 8 | $75.00 | $130.00 | $130.00 | $130.00 | $130.00 | $215.00 |
| 34 | Earth excavation (20200100) | CY | 5,295 | $38.00 | $0.01 | $15.00 | $28.75 | $30.00 | $36.00 |
| 35 | Rem & disp uns matl (20201200) | CY | 6,507 | $33.00 | $0.01 | $25.00 | $36.80 | $30.00 | $38.00 |
| 36 | Furnished excavation (20400800) | CY | 2,116 | $16.00 | $0.01 | $30.00 | $28.00 | $1.00 | $38.00 |
| 37 | Porous gran embank (20700220) | CY | 145 | $112.00 | $71.00 | $60.00 | $126.60 | $150.00 | $50.00 |
| 38 | Trench backfill (20800150) | CY | 1,936 | $50.00 | $40.00 | $40.00 | $48.05 | $21.00 | $37.00 |
| 39 | Geotech fab F/GR stab (21001000) | SY | 3,157 | $4.00 | $2.55 | $1.85 | $2.65 | $2.00 | $3.25 |
| 40 | Topsoil exc & plac (21101505) | CY | 2,237 | $28.00 | $0.01 | $15.00 | $35.60 | $10.00 | $53.00 |
| 41 | Seeding CL 1A (25000110) | ACRE | 2.50 | $2,800.00 | $2,609.00 | $2,609.00 | $2,609.00 | $2,609.00 | $3,000.00 |
| 42 | Nitrogen fert nutr (25000400) | LB | 225 | $2.00 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 |
| 43 | Potassium fert nutr (25000600) | LB | 225 | $2.00 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 |
| 44 | Erosion contr blanket (25100630) | SY | 13,508 | $1.00 | $1.40 | $1.40 | $1.40 | $1.40 | $0.90 |
| 45 | Supple watering (25200200) | UNIT | 8 | $10.00 | $50.00 | $50.00 | $50.00 | $50.00 | $11.00 |
| 46 | Temp eros contr seed (28000250) | LB | 300 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $6.00 |
| 47 | Temp ditch checks (28000305) | LF | 677 | $8.00 | $4.00 | $4.00 | $4.00 | $4.00 | $8.50 |
| 48 | Perimeter eros bar (28000400) | LF | 6,468 | $3.00 | $2.00 | $2.00 | $2.00 | $2.00 | $3.00 |
| 49 | Inlet & pipe protect (28000500) | EACH | 6 | $250.00 | $62.00 | $62.00 | $62.00 | $50.00 | $265.00 |
| 50 | Inlet filters (28000510) | EACH | 43 | $185.00 | $197.00 | $225.00 | $197.00 | $50.00 | $200.00 |
| 51 | Stone riprap CL A1 (28100101) | SY | 42 | $79.00 | $78.00 | $12.00 | $20.00 | $110.00 | $165.00 |
| 52 | Stone riprap CL A3 (28100105) | SY | 22 | $80.00 | $90.00 | $17.00 | $65.20 | $130.00 | $165.00 |
| 53 | Stone riprap CL A4 (28100107) | SY | 42 | $80.00 | $92.00 | $37.00 | $88.65 | $160.00 | $165.00 |
| 54 | Filter fabric (28200200) | SY | 42 | $3.00 | $8.00 | $2.65 | $14.25 | $1.00 | $6.00 |
| 55 | Agg subgrade improve (30300001) | CY | 957 | $73.00 | $99.00 | $60.00 | $48.80 | $31.50 | $55.00 |
| 56 | Agg subgrade impr 12 (30300112) | SY | 11,479 | $25.00 | $18.50 | $25.00 | $19.65 | $12.25 | $14.00 |
| 57 | Agg base cse B 4 (35101600) | SY | 2,112 | $12.00 | $12.50 | $9.49 | $15.60 | $4.00 | $6.50 |
| 58 | Agg base cse B 8 (35102000) | SY | 1,986 | $22.00 | $17.00 | $20.00 | $17.40 | $8.00 | $16.75 |
| 59 | Agg base cse B 12 (35102400) | SY | 242 | $31.00 | $32.75 | $30.00 | $32.40 | $12.00 | $30.00 |
| 60 | HMA base cse 6 (35501308) | SY | 37 | $93.00 | $42.00 | $75.00 | $93.00 | $42.00 | $43.00 |
| 61 | HMA base cse 8 (35501316) | SY | 986 | $61.00 | $65.60 | $50.00 | $61.00 | $65.60 | $54.00 |
| 62 | Bit matls tack CT (40600290) | LB | 9,963 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 63 | HMA SC IL-9.5 D N50 (40604060) | TON | 492 | $131.00 | $140.20 | $150.00 | $131.00 | $140.20 | $111.00 |
| 64 | HMA pavt FD 9 (40701861) | SY | 9,781 | $41.00 | $43.18 | $40.00 | $40.50 | $43.18 | $43.00 |
| 65 | Bit matls tack CT (40800029) | LB | 40 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 66 | Incidental HMA surf (40800050) | TON | 10 | $325.00 | $120.00 | $250.00 | $325.00 | $120.00 | $95.00 |
| 67 | Protective coat (42001300) | SY | 3,810 | $0.01 | $0.01 | $0.01 | $0.10 | $0.01 | $0.10 |
| 68 | PCC driveway pavt 8 (42300400) | SY | 51 | $98.00 | $90.00 | $90.00 | $100.00 | $90.00 | $96.50 |
| 69 | PC conc sidewalk 5 (42400200) | SF | 18,070 | $8.00 | $8.00 | $8.00 | $9.00 | $8.00 | $8.50 |
| 70 | PC conc sidewalk 6 (42400300) | SF | 325 | $9.00 | $8.50 | $8.50 | $10.00 | $8.50 | $9.00 |
| 71 | PC conc sidewalk 8 (42400410) | SF | 613 | $10.00 | $10.00 | $10.00 | $11.00 | $10.00 | $10.75 |
| 72 | Detectable warnings (42400800) | SF | 455 | $20.00 | $20.00 | $20.00 | $40.00 | $20.00 | $21.50 |
| 73 | Pavement rem (44000100) | SY | 9,467 | $6.00 | $49.50 | $5.50 | $5.45 | $30.00 | $3.50 |
| 74 | Drive pavement rem (44000200) | SY | 829 | $11.00 | $10.00 | $7.50 | $10.65 | $30.00 | $13.00 |
| 75 | Comb curb gutter rem (44000500) | LF | 336 | $5.00 | $7.50 | $15.50 | $8.40 | $30.00 | $13.00 |
| 76 | Sidewalk rem (44000600) | SF | 4,481 | $2.00 | $1.25 | $1.50 | $1.00 | $3.00 | $3.00 |
| 77 | Aggregate SHLDS B 6 (48101500) | SY | 12 | $86.00 | $150.00 | $30.00 | $62.50 | $90.00 | $59.00 |
| 78 | Pipe culvert remov (50105220) | LF | 438 | $10.00 | $30.00 | $18.00 | $35.40 | $10.00 | $32.00 |
| 79 | Pipe handrail (50901760) | LF | 80 | $290.00 | $205.00 | $204.27 | $398.35 | $204.27 | $225.00 |
| 80 | Box cul end sec C1 (54001001) | EACH | 4 | $6,174.00 | $12,000 | $14,000 | $11,542 | $10,000 | $10,700 |
| 81 | PCBC 7X3 (54010703) | LF | 166 | $877.00 | $1,025.00 | $1,150.00 | $1,192.55 | $1,100.00 | $1,175.00 |
| 82 | PRC flar end sec 12 (54213657) | EACH | 8 | $2,197.00 | $2,050.00 | $1,250.00 | $1,923.15 | $600.00 | $1,300.00 |
| 83 | PRC flar end sec 15 (54213660) | EACH | 2 | $2,275.00 | $2,200.00 | $2,000.00 | $2,010.95 | $700.00 | $1,800.00 |
| 84 | PRC flar end sec 24 (54213669) | EACH | 1 | $2,510.00 | $2,725.00 | $2,400.00 | $3,172.05 | $1,000.00 | $2,700.00 |
| 85 | PRC FL end S EQ RS 42 (54214527) | EACH | 1 | $5,524.00 | $6,300.00 | $5,500.00 | $8,323.80 | $4,500.00 | $8,500.00 |
| 86 | SS RG CL A 1 12 (550A2320) | LF | 214 | $78.00 | $69.00 | $80.00 | $62.20 | $80.00 | $94.00 |
| 87 | SS RG CL A 1 15 (550A2330) | LF | 276 | $82.00 | $96.00 | $85.00 | $68.30 | $90.00 | $96.00 |
| 88 | SS RG CL A 1 18 (550A2340) | LF | 263 | $92.00 | $88.00 | $90.00 | $78.00 | $100.00 | $105.00 |
| 89 | SS RG CL A 1 24 (550A2360) | LF | 423 | $96.00 | $112.00 | $100.00 | $110.75 | $125.00 | $137.00 |
| 90 | SS RG CL A 1 30 (550A2380) | LF | 21 | $108.00 | $145.00 | $125.00 | $160.10 | $175.00 | $165.00 |
| 91 | SS RG CL A 2 12 (550A2520) | LF | 41 | $78.00 | $71.00 | $80.00 | $74.30 | $80.00 | $130.00 |
| 92 | SS RG CL A 2 15 (550A2530) | LF | 66 | $84.00 | $102.00 | $85.00 | $78.65 | $90.00 | $135.00 |
| 93 | SS CL A 1 eqrs 42 (550A4700) | LF | 683 | $225.00 | $255.00 | $245.00 | $312.65 | $300.00 | $310.00 |
| 94 | SS CL A 2 eqrs 42 (550A5500) | LF | 415 | $228.00 | $269.00 | $245.00 | $312.65 | $300.00 | $350.00 |
| 95 | Adj water main 8 (56106400) | LF | 100 | $200.00 | $285.00 | $220.00 | $376.55 | $200.00 | $320.00 |
| 96 | Fire hydnts relocated (56400400) | EACH | 3 | $11,624 | $4,700.00 | $7,000.00 | $15,188 | $8,000.00 | $4,150.00 |
| 97 | Geocomposite wall DR (59100100) | SY | 183 | $48.00 | $47.92 | $47.92 | $49.95 | $20.00 | $64.00 |
| 98 | Pipe underdr T 1 4 (60108104) | LF | 200 | $14.00 | $31.00 | $38.00 | $25.55 | $40.00 | $28.00 |
| 99 | CB TA 4 dia T11F&G (60201105) | EACH | 14 | $4,628.00 | $3,450.00 | $5,000.00 | $4,316.25 | $7,000.00 | $4,700.00 |
| 100 | CB TA 5 dia T11F&G (60204805) | EACH | 3 | $5,766.00 | $4,800.00 | $6,000.00 | $6,089.60 | $8,000.00 | $6,700.00 |
| 101 | CB TC T8G (60207605) | EACH | 1 | $2,017.00 | $1,750.00 | $3,000.00 | $2,256.85 | $4,000.00 | $3,000.00 |
| 102 | CB TC T11F&G (60207905) | EACH | 6 | $2,409.00 | $2,200.00 | $3,300.00 | $2,659.30 | $4,000.00 | $3,100.00 |
| 103 | Man TA 4 dia T1F CL (60218400) | EACH | 2 | $4,390.00 | $3,825.00 | $4,500.00 | $3,932.70 | $7,000.00 | $4,700.00 |
| 104 | Man TA 5 dia T1F CL (60221100) | EACH | 4 | $5,527.00 | $4,800.00 | $5,500.00 | $5,668.20 | $8,000.00 | $6,650.00 |
| 105 | Man TA 6 dia T1F CL (60223800) | EACH | 2 | $8,576.00 | $7,650.00 | $9,000.00 | $11,116 | $10,000 | $13,000 |
| 106 | Man TA 8 dia T1F CL (60224459) | EACH | 8 | $18,495 | $15,500 | $16,500 | $21,608 | $20,000 | $18,000 |
| 107 | Inlets TA T8G (60236200) | EACH | 5 | $1,420.00 | $1,600.00 | $2,200.00 | $1,653.00 | $4,000.00 | $2,350.00 |
| 108 | Inlets TA T11F&G (60236800) | EACH | 9 | $1,804.00 | $1,990.00 | $2,500.00 | $2,055.40 | $4,000.00 | $2,354.00 |
| 109 | Inlets adj new T1F OL (60260300) | EACH | 1 | $1,312.00 | $995.00 | $1,800.00 | $1,027.15 | $1,000.00 | $1,600.00 |
| 110 | Remov man - main flow (60500070) | EACH | 1 | $2,141.00 | $3,800.00 | $2,000.00 | $2,366.00 | $1,000.00 | $4,800.00 |
| 111 | Class SI conc outlet (60600095) | CY | 3 | $1,100.00 | $1,100.00 | $1,100.00 | $700.00 | $1,100.00 | $1,175.00 |
| 112 | Comb CC&G TB6.12 (60603800) | LF | 5,624 | $24.00 | $23.50 | $23.50 | $30.00 | $23.50 | $25.00 |
| 113 | Comb CC&G TM4.12 (60608562) | LF | 298 | $23.00 | $23.00 | $23.00 | $30.00 | $23.00 | $25.00 |
| 114 | Conc median surf 6 (60618320) | SF | 2,172 | $9.00 | $8.50 | $8.50 | $10.00 | $8.50 | $9.00 |
| 115 | Non SPL waste disposl (66900200) | CY | 25 | $110.00 | $120.00 | $55.00 | $125.20 | $200.00 | $130.00 |
| 116 | Soil disposal analy (66900530) | EACH | 1 | $1,700.00 | $1,700.00 | $1,800.00 | $1,800.00 | $1,600.00 | $1,800.00 |
| 117 | Reg sub P-const plan (66901001) | LS | 1 | $3,400.00 | $3,400.00 | $3,350.00 | $3,350.00 | $3,600.00 | $3,750.00 |
| 118 | Reg sub F con report (66901003) | LS | 1 | $500.00 | $500.00 | $1,500.00 | $1,500.00 | $500.00 | $550.00 |
| 119 | Reg sub mon (66901006) | CAL DAY | 50 | $750.00 | $1.00 | $700.00 | $700.00 | $700.00 | $800.00 |
| 120 | Engr field office A (67000400) | CAL MO | 6 | $2,000.00 | $3,700.00 | $2,500.00 | $7,543.00 | $500.00 | $2,000.00 |
| 121 | Mobilization (67100100) | LS | 1 | $55,989 | $215,000 | $354,000 | $126,000 | $469,026 | $125,000 |
| 122 | Changeable message SN (70107025) | CAL DAY | 171 | $40.00 | $30.00 | $30.00 | $40.00 | $30.00 | $32.00 |
| 123 | SHRT TRM pavt MK rem (70300150) | SF | 725 | $2.00 | $0.60 | $3.00 | $0.95 | $0.60 | $3.00 |
| 124 | Temp PVT MK line 4 - paint (70300221) | LF | 8,700 | $0.45 | $0.38 | $0.38 | $0.45 | $0.38 | $0.40 |
| 125 | Temp PVT MK LTR & sym MU (70303100) | SF | 476 | $5.00 | $6.00 | $4.00 | $5.75 | $6.00 | $4.25 |
| 126 | Temp PVT MK L4 MU (70303120) | LF | 8,231 | $1.00 | $1.04 | $0.60 | $0.80 | $1.04 | $0.65 |
| 127 | Temp PVT MK L6 MU (70303130) | LF | 1,008 | $1.00 | $1.10 | $0.90 | $1.00 | $1.10 | $1.00 |
| 128 | Temp PVT MK L12 MU (70303160) | LF | 2,494 | $4.00 | $2.20 | $1.90 | $3.00 | $2.20 | $2.00 |
| 129 | Temp PVT MK L24 MU (70303210) | LF | 74 | $5.00 | $6.00 | $4.00 | $5.75 | $6.00 | $4.25 |
| 130 | Temp PVT MK LTR & sym T4 tape (70307100) | SF | 226 | $4.00 | $3.75 | $9.00 | $3.60 | $3.75 | $10.00 |
| 131 | Temp PVT MK L4 T4 tape (70307120) | LF | 2,175 | $1.00 | $1.20 | $1.50 | $1.20 | $1.20 | $1.60 |
| 132 | Temp PVT MK L24 T4 tape (70307210) | LF | 140 | $7.00 | $7.60 | $9.00 | $7.20 | $7.60 | $9.75 |
| 133 | Sign panel T1 (72000100) | SF | 160 | $30.00 | $26.00 | $32.00 | $30.00 | $26.00 | $34.00 |
| 134 | Reloc sin pan assy TA (72400500) | EACH | 9 | $325.00 | $125.00 | $150.00 | $325.00 | $125.00 | $160.00 |
| 135 | Teles STL sin support (72800100) | LF | 206 | $17.00 | $16.00 | $22.00 | $17.00 | $16.00 | $23.50 |
| 136 | THPL PVT MK LTR & sym (78000100) | SF | 476 | $4.00 | $5.75 | $4.95 | $5.75 | $5.75 | $5.25 |
| 137 | THPL PVT MK line 4 (78000200) | LF | 8,231 | $1.00 | $0.80 | $0.82 | $0.80 | $0.80 | $0.90 |
| 138 | THPL PVT MK line 6 (78000400) | LF | 1,300 | $2.00 | $1.00 | $1.25 | $1.00 | $1.00 | $1.30 |
| 139 | THPL PVT MK line 12 (78000600) | LF | 3,166 | $3.00 | $3.00 | $2.45 | $3.00 | $3.00 | $2.60 |
| 140 | THPL PVT MK line 24 (78000650) | LF | 74 | $6.00 | $5.75 | $4.95 | $5.75 | $5.75 | $5.25 |
| 141 | PVT MKG rem grinding (78300201) | SF | 2,700 | $3.00 | $1.15 | $0.95 | $3.00 | $1.15 | $1.00 |
| 142 | PVT MKG rem WTR blast (78300202) | SF | 473 | $7.00 | $8.50 | $7.50 | $7.00 | $8.50 | $8.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.